[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262995":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1262995,847,2,"多选题","工程量清单的编制依据有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","建设工程设计文件",true,{"key":16,"text":17,"correct":14},"B","相关标准、规范",{"key":19,"text":20,"correct":21},"C","投标文件及其补充文件",false,{"key":23,"text":24,"correct":14},"D","施工现场情况",{"key":26,"text":27,"correct":14},"E","工程特点及常规施工方案","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-岗位技能","建筑工程",0]