[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262947":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1262947,847,1,"单选题","下列不开槽管道施工方法中,施工速度相对较慢的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","密闭式顶管法",true,{"key":16,"text":17,"correct":18},"B","盾构法",false,{"key":20,"text":21,"correct":18},"C","定向钻法",{"key":23,"text":24,"correct":18},"D","夯管法","",{"id":6,"name":27,"category":28,"favorite":29},"市政方向-岗位技能","建筑工程",0]