[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262933":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1262933,847,1,"单选题","主要材料需求计划是根据( )和施工进度计划编制的。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工进度计划",false,{"key":16,"text":17,"correct":14},"B","招投标文件",{"key":19,"text":20,"correct":14},"C","工程设计文件",{"key":22,"text":23,"correct":24},"D","工程项目工料分析",true,"",{"id":6,"name":27,"category":28,"favorite":29},"市政方向-岗位技能","建筑工程",0]