[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262918":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1262918,847,1,"单选题","下列专业工程实行分包的,其专项方案不能由专业承包单位组织编制的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","高支架模板工程",true,{"key":16,"text":17,"correct":18},"B","起重机械安装拆卸工程",false,{"key":20,"text":21,"correct":18},"C","深基坑工程",{"key":23,"text":24,"correct":18},"D","附着式升降脚手架工程","",{"id":6,"name":27,"category":28,"favorite":29},"市政方向-岗位技能","建筑工程",0]