[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262874":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1262874,847,1,"单选题","事故处理完毕后,必须尽快地提交完整的事故处理报告,其内容不包括( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","事故项目及各参建单位概况",false,{"key":16,"text":17,"correct":14},"B","事故发生经过和事故救援情况",{"key":19,"text":20,"correct":14},"C","事故造成的人员伤亡和直接经济损失",{"key":22,"text":23,"correct":24},"D","事故的赔偿方式",true,"",{"id":6,"name":27,"category":28,"favorite":29},"市政方向-岗位技能","建筑工程",0]