[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262816":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1262816,847,1,"单选题","为完成工程项目施工,发生于该工程施工前和施工过程中非工程实体项目的费用是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","企业管理费",false,{"key":16,"text":17,"correct":14},"B","直接工程费",{"key":19,"text":20,"correct":21},"C","措施费",true,{"key":23,"text":24,"correct":14},"D","规费","",{"id":6,"name":27,"category":28,"favorite":29},"市政方向-岗位技能","建筑工程",0]