[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262561":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1262561,846,2,"多选题","智能化工程的验收步骤正确的是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","先分项、分部验收",false,{"key":16,"text":17,"correct":18},"B","先产品、后系统",true,{"key":20,"text":21,"correct":18},"C","先各系统、后系统集成",{"key":23,"text":24,"correct":14},"D","先主体、后分项",{"key":26,"text":27,"correct":14},"E","先质量、后性能","BC","",{"id":6,"name":31,"category":32,"favorite":33},"设备方向-通用基础","建筑工程",0]