[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262513":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1262513,846,2,"多选题","工程量清单的作用有( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","编制招标控制价的依据,是投标人投标报价的依据",true,{"key":16,"text":17,"correct":14},"B","是合同价调整的基础",{"key":19,"text":20,"correct":14},"C","体现招标人要求投标人完成的工程项目内容及相应工程数量,全面反映了投标报价要求,是投标人进行报价的依据",{"key":22,"text":23,"correct":14},"D","反映拟建工程的全部工程内容,并为实现这些工程内同而进行的其他工作。",{"key":25,"text":26,"correct":27},"E","可以完全取代定额计价方式",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"设备方向-通用基础","建筑工程",0]