[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262490":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1262490,846,1,"单选题","总承包单位进行分包,应经( )的认可。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计单位",false,{"key":16,"text":17,"correct":18},"B","建设单位",true,{"key":20,"text":21,"correct":14},"C","勘察单位",{"key":23,"text":24,"correct":14},"D","施工单位","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-通用基础","建筑工程",0]