[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262489":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1262489,846,1,"单选题","实行工程总承包的,经建设单位许可或合同约定,总承包单位可以将其承包的部分工程分包出去,但( )质量向建筑单位负责。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","仅对其部分承包工程",false,{"key":16,"text":17,"correct":14},"B","对分包以外承包工程",{"key":19,"text":20,"correct":21},"C","对所有的承包工程",true,{"key":23,"text":24,"correct":14},"D","不需要对任何部分的承包工程","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-通用基础","建筑工程",0]