[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262480":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1262480,846,1,"单选题","施工项目职业健康安全(OHS)管理的目标具体不包括:( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","减少或消除人的不安全行为的目标",false,{"key":16,"text":17,"correct":14},"B","减少或消除设备、材料的不安全状态的目标",{"key":19,"text":20,"correct":21},"C","施工过程管理的目标",true,{"key":23,"text":24,"correct":14},"D","改善生产环境和保护自然环境的目标","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-通用基础","建筑工程",0]