[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262479":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1262479,846,1,"单选题","项目成本管理应遵循的程序不包括:( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","掌握生产要素的市场价格的变动状态",false,{"key":16,"text":17,"correct":14},"B","确定项目合同价",{"key":19,"text":20,"correct":14},"C","编制成本计划,确定成本实施目标",{"key":22,"text":23,"correct":24},"D","材料管理考核",true,"",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-通用基础","建筑工程",0]