[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262435":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1262435,846,1,"单选题","成品敞口水箱安装前应做( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","盛水试验",false,{"key":16,"text":17,"correct":14},"B","煤油渗透试验",{"key":19,"text":20,"correct":21},"C","满水试验",true,{"key":23,"text":24,"correct":14},"D","水压试验","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-通用基础","建筑工程",0]