[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262414":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1262414,846,1,"单选题","电缆施放前应根据电缆总体布置情况,按施工实际( ),并把电缆按实际长度通盘计划,避免浪费。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","人力拖放电缆",false,{"key":16,"text":17,"correct":14},"B","采用电缆输送机,降低劳动强度",{"key":19,"text":20,"correct":21},"C","绘制电缆排列布置图",true,{"key":23,"text":24,"correct":14},"D","排列整齐","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-通用基础","建筑工程",0]