[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262401":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1262401,846,1,"单选题","照明全负荷通电试运行时,民用住宅照明系统通电连续运行时间为( )h。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","24",false,{"key":16,"text":17,"correct":14},"B","12",{"key":19,"text":20,"correct":21},"C","8",true,{"key":23,"text":24,"correct":14},"D","4","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-通用基础","建筑工程",0]