[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-845-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":286},{"id":5,"name":6,"category":7,"favorite":8},845,"设备方向-岗位技能","建筑工程",0,8,50,394,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1262224,3,"判断题","汽车式起重机具有机动性能好、运行速度快、转移方便等优点。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1262225,"施工阶段是项目成本发生的主要阶段,也是成本控制的重点阶段。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1262226,"成本考核目的在于贯彻落实责权利相结合原则,根据成本控制活动的业绩给予责任者奖励或处罚,促进企业成本管理、成本控制健康发展。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1262227,"成本计划是进行成本控制活动的基础二",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1262228,"成本管理的基本程序就是宏观上成本控制必须做到的六个环节或六个方面。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1262229,"计划成本与承包成本比较即可判定项目的盈亏情况。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1262230,"管理目的是要在保证工期、质量安全的前提下,采取相应的管理措施,把成本控制在计划范围内,并进一步寻求最大程度的成本降低途径,力争成本费用最小化。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1262231,"企业的成本管理责任体系包括两个方面:一是企业管理层;二是施工管理层。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1262232,"要做好现场应急保护措施,防止因质量事故而引起更严重次生灾害而扩大损失,待有事故结论后进行处理。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1262233,"发生质量事故基本上是违反了施工质量验收规范的主控项目的规定,而一般的质量缺陷基本上是违反了施工质量验收规范中的一般项目的有关观感的规定。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1262234,"检验点是个特殊的点,即这道工序未作检验,并尚未断定合格与否,是不是进行下道工序的,只有得出结论为合格者才可以进入下道工序。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1262235,"质量控制点的关键部位是施工方法。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1262236,"每个质量控制具体方法本身也有一个持续改进的课题,这就要有计划、实施、检查、改进循环原理,在实践中使质量控制得到不断提高。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1262237,"施工项目质量控制的方法,主要是审核有关技术文件、报告和直接进行现场检查或必要的试验等。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1262238,"事后对影响施工项目质量的要素严加控制,是保证以后施工项目质量的关键。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1262239,"质量好坏和高低是根据产品所具备的质量特性能否满足人们需求及满足程度来衡量的。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1262240,"事故单位和人员应当妥善保护事故现场和相关证据,任何单位和个人不得破坏事故现场、毁灭相关证据。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1262241,"事故类别是根据导致事故发生的起因物和施害物来确定的。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1262242,"项目部组织安全、施工、技术等部门人员参加的风险管理组,并邀请有经验的作业人员参加各工序活动的风险进行评估识别。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1262243,"对施工现场环境条件的识别,从安全控制要求出发,即对施工现场影响安全的危险源识别。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1262244,"对房屋建筑安装工程中产生的环境污染源识别后,应按以下程序采取措施:按照有关标准要求实施对主要环境因素的预防和控制。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1262245,"环境事故的形成是指非预期的因施工发生事故或者其他突发事件,造成或者可能造成污染的事故。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1262246,"把目标和承诺依靠组织结构体系分解成层层可操作的活动,并用书面文件说明操作的程序和预期的结果。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1262247,"施工现场管理的基本要求:在管理实施中坚持“安全第一、预防为主、综合治理”的理念。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1262248,"施工现场管理的基本要求:采用风险管理的理念,实行组织、识别、控制和信息反馈等各个环节的全方位、全过程的管理。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1262249,"施工进度计划与实施间发生差异是不寻常现象。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1262250,"影响安装工程进度的因素有建设项目内部和外部两个方面。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1262251,"进度控制就是进行计划、实施、检查、比较分析、确定调整措施、再进行计划的一个循环过程,这个过程属于开环控制过程。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1262252,"进度控制的目的是在进度计划预期目标引导下,对实际进度进行合理调节,以使实际进度符合目标要求。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1262253,"施工进度计划表达的两种方法:横道图计划和网络计划。",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1262254,"施工进度计划是把预期施工完成的工作按时间坐标序列表达出来的书面文件。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1262255,"重点、难点分部工程和专项工程施工方案由施工单位技术部门组织相关专家评审,施工单位技术负责人批准。",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1262256,"规模较大的分部工程和专项工程的施工方案要按单位工程施工组织设计进行编制和审批。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1262257,"建筑电气工程在动力中心的变配电设备安装,机场建设的电力电缆敷设,带有36kV的变配电所的调整试验等。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1262258,"施工组织设计以施工项目为对象编制的,用于指导施工的技术、经济和管理的综合性文件。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1262259,"工程建设强制性标准是指直接涉及工程质量、安全、卫生及环境保护等方面的工程建设标准强制性条文。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1262260,"特种设备安装、改造、维修的施工单位应当在施工前将拟进行的设备安装、改造、维修情况书面告知直辖市或者设区的市的特种设备安全监督管理部门、告知后即可施工。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1262261,"建筑智能化工程参与单位工程验收应按《建筑智能化工程施工质量验收统一标准》GB50300-2013的规定执行。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":25,"analysis":27},1262262,"统一标准共有条文53条,其中强制性条文6条,比例为9%,同时还有8个附录,用以统一划分工程和统一检查记录的表达。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1262263,"国务院建设行政主管部门负责全国房屋建筑工程和市政基础设施工程的竣工验收备案管理工作。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1262264,"建筑工程质量检测工作是建筑工程质量监督的主要手段。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1262265,"对危险性较大的分部分项工程要编制全项施工方案。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1262266,"施工现场暂时停止施工的,应当做好现场的防护。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1262267,"施工作业人员是施工作业活动的重要主体。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[287,291,294,297,300,303],{"id":288,"name":289,"category":7,"favorite":290},1,"领导干部任职前廉政法规知识测试题",92,{"id":292,"name":293,"category":7,"favorite":288},595,"建筑结构与设备",{"id":295,"name":296,"category":7,"favorite":288},715,"招标采购专业知识与法律法规",{"id":298,"name":299,"category":7,"favorite":288},848,"市政方向-通用基础",{"id":301,"name":302,"category":7,"favorite":8},534,"BIM工程师",{"id":304,"name":302,"category":7,"favorite":8},535]