[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-845-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":684},{"id":5,"name":6,"category":7,"favorite":8},845,"设备方向-岗位技能","建筑工程",0,6,50,394,[13,38,53,66,81,96,111,124,139,153,167,182,196,211,225,240,254,268,282,296,311,325,339,353,367,381,394,408,422,436,450,464,478,490,503,517,531,546,560,573,587,602,616,630,644,654,660,666,672,678],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1262124,2,"多选题","施工升降机按其传动形式可分为( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","齿轮齿条式",true,{"key":24,"text":25,"correct":22},"B","钢丝绳式",{"key":27,"text":28,"correct":29},"C","链条式",false,{"key":31,"text":32,"correct":22},"D","混合式",{"key":34,"text":35,"correct":29},"E","皮带式","ABD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1262125,"成本的控制的对象包括( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"通过劳务合同进行人工费的控制",{"key":24,"text":45,"correct":29},"通过施工管理进行材料用量的控制",{"key":27,"text":47,"correct":22},"通过掌握市场信息,采用招标、询价等方式控制材料、设备的采购价格",{"key":31,"text":49,"correct":29},"注意工程变更等的动态因素影响",{"key":34,"text":51,"correct":22},"通过定额管理和计量管理进行材料用量的控制","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":65,"analysis":37},1262126,"成本的控制活动要求( )。",[57,59,60,62,63],{"key":20,"text":58,"correct":22},"要按照计划成本目标值来控制物资采购价格,并做好物资进场验收工作,确保质量",{"key":24,"text":49,"correct":22},{"key":27,"text":61,"correct":22},"增强项目管理人员和全体员工的成本意识和控制能力",{"key":31,"text":43,"correct":29},{"key":34,"text":64,"correct":29},"加强施工管理","ABC",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":80,"analysis":37},1262127,"成本的控制活动依据( )。",[70,72,74,76,78],{"key":20,"text":71,"correct":22},"工程的承包合同",{"key":24,"text":73,"correct":22},"进度统计报告",{"key":27,"text":75,"correct":22},"施工成本计划",{"key":31,"text":77,"correct":29},"规范变更",{"key":34,"text":79,"correct":22},"工程变更","ABCE",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":95,"analysis":37},1262128,"成本管理的基本程序包括( )。",[85,87,89,91,93],{"key":20,"text":86,"correct":22},"成本计划",{"key":24,"text":88,"correct":22},"成本预测",{"key":27,"text":90,"correct":22},"成本控制",{"key":31,"text":92,"correct":22},"成本分析",{"key":34,"text":94,"correct":22},"成本考核","ABCDE",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},1262129,"固定成本包含( )。",[100,102,104,106,108],{"key":20,"text":101,"correct":22},"折旧费",{"key":24,"text":103,"correct":22},"管理人员的工资",{"key":27,"text":105,"correct":29},"材料费",{"key":31,"text":107,"correct":29},"人工费",{"key":34,"text":109,"correct":29},"技术费","AB",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":95,"analysis":37},1262130,"管理环节主要有( )。",[115,117,118,120,122],{"key":20,"text":116,"correct":22},"施工成本预测",{"key":24,"text":75,"correct":22},{"key":27,"text":119,"correct":22},"施工成本控制",{"key":31,"text":121,"correct":22},"施工成本核算",{"key":34,"text":123,"correct":22},"施工成本考核",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":138,"analysis":37},1262131,"施工成本包括( )。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"消耗的原材料、辅助材料、外购件等的费用",{"key":24,"text":131,"correct":22},"施工机械的台班费或租赁费",{"key":27,"text":133,"correct":22},"支付给生产工人的工资、奖金、工资性津贴等",{"key":31,"text":135,"correct":22},"因组织施工而发生的组织和管理费用",{"key":34,"text":137,"correct":29},"周转材料的摊销费或租赁费","ABCD",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":95,"analysis":37},1262132,"质量事故的处理程序包括( )。",[143,145,147,149,151],{"key":20,"text":144,"correct":22},"事故报告",{"key":24,"text":146,"correct":22},"现场保护",{"key":27,"text":148,"correct":22},"事故调查",{"key":31,"text":150,"correct":22},"编写质量事故调查报告",{"key":34,"text":152,"correct":22},"形成事故处理报告",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":138,"analysis":37},1262133,"现场质量检查的内容( )。",[157,159,161,163,165],{"key":20,"text":158,"correct":22},"工序交接检查",{"key":24,"text":160,"correct":22},"开工前检查",{"key":27,"text":162,"correct":22},"隐蔽工程检查",{"key":31,"text":164,"correct":22},"停工后复工前的检查",{"key":34,"text":166,"correct":29},"图纸会审有记录",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":181,"analysis":37},1262134,"工程质量控制包括( )。",[171,173,175,177,179],{"key":20,"text":172,"correct":29},"预算质量控制",{"key":24,"text":174,"correct":22},"事前质量控制",{"key":27,"text":176,"correct":22},"事中质量控制",{"key":31,"text":178,"correct":22},"事后质量控制",{"key":34,"text":180,"correct":29},"设计质量控制","BCD",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":80,"analysis":37},1262135,"影响质量的因素控制包括( )。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"人的控制",{"key":24,"text":189,"correct":22},"材料控制",{"key":27,"text":191,"correct":22},"机械控制",{"key":31,"text":193,"correct":29},"事前控制",{"key":34,"text":195,"correct":22},"环境控制",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":210,"analysis":37},1262136,"施工项目质量管理的原则( )。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"坚持质量第一,用户至上",{"key":24,"text":203,"correct":22},"一人为核心",{"key":27,"text":205,"correct":29},"质量检查不能解体、拆卸",{"key":31,"text":207,"correct":29},"质量易受投资、进度制约",{"key":34,"text":209,"correct":22},"以预防为主","ABE",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":95,"analysis":37},1262137,"属于ISO\u002FTC176整理并编撰八项质量管理原则( )。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"以顾客为关注焦点",{"key":24,"text":218,"correct":22},"领导作用",{"key":27,"text":220,"correct":22},"全员参与",{"key":31,"text":222,"correct":22},"过程方法",{"key":34,"text":224,"correct":22},"基于事实的决策方法",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":239,"analysis":37},1262138,"产品质量具有相对性表现在( )。",[229,231,233,235,237],{"key":20,"text":230,"correct":29},"产品本身具有许多性质",{"key":24,"text":232,"correct":22},"对有关产品所规定的要求及标准、规定等因时而异,会随时间,条件而变化",{"key":27,"text":234,"correct":22},"满足期望的程度由于用户需求程度不同,因人而异",{"key":31,"text":236,"correct":29},"人的选择性",{"key":34,"text":238,"correct":29},"制定质量方针和质量目标","BC",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":110,"analysis":37},1262139,"事故直接原因包含( )。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"机械、物质或环境的不安全状态",{"key":24,"text":247,"correct":22},"人的不安全行为",{"key":27,"text":249,"correct":29},"技术和设计上的缺陷",{"key":31,"text":251,"correct":29},"教育培训不够或未经培训,缺乏或不懂安全技术知识",{"key":34,"text":253,"correct":29},"技术缺陷",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":65,"analysis":37},1262140,"工伤事故类别确定原则( )。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"要着重考虑导致事故发生的起因物方面因素",{"key":24,"text":261,"correct":22},"一次事故中同时存在两个或两个以上直接原因,应以先发的、诱导性的原因作为确定事故类别的主要依据",{"key":27,"text":263,"correct":22},"突出事故的专业特性",{"key":31,"text":265,"correct":29},"中出事故发生的起因物",{"key":34,"text":267,"correct":29},"突出事故的性质",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":138,"analysis":37},1262141,"应急反应的实施原则( )。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"避免伤亡",{"key":24,"text":275,"correct":22},"保护人员不受伤害",{"key":27,"text":277,"correct":22},"避免或降低环境污染",{"key":31,"text":279,"correct":22},"保护设备、设施或其他财产避免和减少损失",{"key":34,"text":281,"correct":29},"应急避险的行动程序,应急预案的培训程序",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":95,"analysis":37},1262142,"施工现场危险源的范围( )。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"所进入施工现场人员的活动",{"key":24,"text":289,"correct":22},"工作场所",{"key":27,"text":291,"correct":22},"作业环境",{"key":31,"text":293,"correct":22},"项目部使用的相关方使用的施工机械设备",{"key":34,"text":295,"correct":22},"作业人员的劳动强度",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":310,"analysis":37},1262143,"对房屋建筑安装工程中产生的环境污染源识别后,应按以下程序采取措施:( )。",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"对确定的重要环境因素制定目标、指标及管理方案",{"key":24,"text":303,"correct":22},"明确相关岗位人员和管理人员的职责",{"key":27,"text":305,"correct":29},"及时通报可能受到污染危害的单位和居民",{"key":31,"text":307,"correct":22},"建立对施工现场环境保护的制度",{"key":34,"text":309,"correct":22},"建立环境保护信息沟通渠道,实施有效监督,做到施工全过程监控,鼓励社会监督","ABDE",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":310,"analysis":37},1262144,"文明施工要求,现场道路设置:( )。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"所有设备吊装区设立警戒线,且标识清晰",{"key":24,"text":318,"correct":22},"临街处设立围挡",{"key":27,"text":320,"correct":29},"场区道路设置及时救治器具",{"key":31,"text":322,"correct":22},"场区道路设置人行通道",{"key":34,"text":324,"correct":22},"所有临时楼梯有扶手和安全护栏",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":138,"analysis":37},1262145,"管道、设备的试压、冲洗、消毒作业要从( )等方面人手加强安全管理。",[329,331,333,335,337],{"key":20,"text":330,"correct":22},"完善施工方案",{"key":24,"text":332,"correct":22},"危险区域标识清楚",{"key":27,"text":334,"correct":22},"指示仪表正确有效",{"key":31,"text":336,"correct":22},"个人防护用品齐全",{"key":34,"text":338,"correct":29},"指示标志错误",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":138,"analysis":37},1262146,"项目经理负有( )的责任。",[343,345,347,349,351],{"key":20,"text":344,"correct":22},"建立管理体系",{"key":24,"text":346,"correct":22},"提出目标或确定目标",{"key":27,"text":348,"correct":22},"建立完善体系文件责任",{"key":31,"text":350,"correct":22},"在实施中进行持续改进",{"key":34,"text":352,"correct":29},"建立施工方案",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":210,"analysis":37},1262147,"影响安装工程进度的因素,建设项目内部包括( )。",[357,359,361,363,365],{"key":20,"text":358,"correct":22},"土建工期的延误",{"key":24,"text":360,"correct":22},"业主资金不到位",{"key":27,"text":362,"correct":29},"意外事件的出现",{"key":31,"text":364,"correct":29},"施工设计图纸不能按计划或施工设计作出重大修改",{"key":34,"text":366,"correct":22},"各专业分包单位不能如期履行分包合同",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":65,"analysis":37},1262148,"网络图计划检查方法有:( )。",[371,373,375,377,379],{"key":20,"text":372,"correct":22},"列表比较法",{"key":24,"text":374,"correct":22},"前锋线比较法",{"key":27,"text":376,"correct":22},"“香蕉”形曲线比较法",{"key":31,"text":378,"correct":29},"图表比较法",{"key":34,"text":380,"correct":29},"节点对比法",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":36,"analysis":37},1262149,"进度控制受以下原理影响:( )。",[385,387,389,391,393],{"key":20,"text":386,"correct":22},"动态控制原理",{"key":24,"text":388,"correct":22},"系统原理",{"key":27,"text":390,"correct":29},"静态控制原理",{"key":31,"text":392,"correct":22},"信息反馈原理",{"key":34,"text":386,"correct":29},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":65,"analysis":37},1262150,"网络图由( )基本要素组成。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"工作",{"key":24,"text":401,"correct":22},"节点",{"key":27,"text":403,"correct":22},"线路",{"key":31,"text":405,"correct":29},"驻点",{"key":34,"text":407,"correct":29},"直线",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":95,"analysis":37},1262151,"作业计划编制前要对( )等做充分的了解,并对执行中可能遇到的问题及其解决的途径提出对策,因而作业计划具有更强的可操作性。",[412,414,416,418,420],{"key":20,"text":413,"correct":22},"施工现场条件",{"key":24,"text":415,"correct":22},"人力资源配备和物资供应状况",{"key":27,"text":417,"correct":22},"作业面现状",{"key":31,"text":419,"correct":22},"技术能力情况",{"key":34,"text":421,"correct":22},"资金供给的可能性",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":138,"analysis":37},1262152,"施工进度计划的分类,按指导施工时间长短分类有( )。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"年度计划",{"key":24,"text":429,"correct":22},"季度计划",{"key":27,"text":431,"correct":22},"月度计划",{"key":31,"text":433,"correct":22},"旬或周计划",{"key":34,"text":435,"correct":29},"总计划",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":65,"analysis":37},1262153,"施工进度计划的分类,按机电工程类别分类有( )。",[440,442,444,446,448],{"key":20,"text":441,"correct":22},"给水排水工程进度计划",{"key":24,"text":443,"correct":22},"建筑电气工程进度计划",{"key":27,"text":445,"correct":22},"通风与空调工程进度计划",{"key":31,"text":447,"correct":29},"实施性作业计划",{"key":34,"text":449,"correct":29},"建筑电气工程",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":110,"analysis":37},1262154,"专项施工方案的内容包括:( )。",[454,456,458,460,462],{"key":20,"text":455,"correct":22},"工程概况",{"key":24,"text":457,"correct":22},"明确各类资源配置数量和要求",{"key":27,"text":459,"correct":29},"编制组分工,并明确初稿完成时间",{"key":31,"text":461,"correct":29},"工程施工合同、招标投标文件或相关文件",{"key":34,"text":463,"correct":29},"新工艺的分部或分项工程",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":95,"analysis":37},1262155,"房屋建筑设备安装工程的专项施工方案编制的导向主要是指( )的分部或分项工程。",[468,470,472,474,476],{"key":20,"text":469,"correct":22},"施工安全风险较大",{"key":24,"text":471,"correct":22},"工程规模较大",{"key":27,"text":473,"correct":22},"施工难度较大",{"key":31,"text":475,"correct":22},"采用新材料",{"key":34,"text":477,"correct":22},"采用新工艺",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":65,"analysis":37},1262156,"施工组织设计的编制的流程包括:( )。",[482,484,486,487,489],{"key":20,"text":483,"correct":22},"组织编制组,明确负责人",{"key":24,"text":485,"correct":22},"收集整理编制依据,并鉴别其完整性和真实性",{"key":27,"text":459,"correct":22},{"key":31,"text":488,"correct":29},"工程施工合同、招标投标文件或相关协议",{"key":34,"text":488,"correct":29},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":239,"analysis":37},1262157,"主要施工管理计划包括( )。",[494,496,498,500,502],{"key":20,"text":495,"correct":29},"绿色施工管理计划",{"key":24,"text":497,"correct":22},"质量管理计划",{"key":27,"text":499,"correct":22},"安全管理计划",{"key":31,"text":501,"correct":29},"防火保安管理计划",{"key":34,"text":499,"correct":29},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":138,"analysis":37},1262158,"确定各项管理体系的流程和措施包括( )。",[507,509,511,513,515],{"key":20,"text":508,"correct":22},"技术措施",{"key":24,"text":510,"correct":22},"质量保证措施",{"key":27,"text":512,"correct":22},"组织措施",{"key":31,"text":514,"correct":22},"安全施工措施",{"key":34,"text":516,"correct":29},"技术准备措施",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":138,"analysis":37},1262159,"施工准备计划包括( )。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"技术准备",{"key":24,"text":524,"correct":22},"物资准备",{"key":27,"text":526,"correct":22},"劳动组织准备",{"key":31,"text":528,"correct":22},"施工现场准备",{"key":34,"text":530,"correct":29},"施工技术准备",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":545,"analysis":37},1262160,"施工组织设计的类型包括:( )。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"施工组织总设计",{"key":24,"text":538,"correct":29},"施工图纸",{"key":27,"text":540,"correct":22},"单位工程组织施工组织设计",{"key":31,"text":542,"correct":22},"施工方案",{"key":34,"text":544,"correct":29},"施工要求","ACD",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":138,"analysis":37},1262161,"特种设备安装、改造、维修的施工单位应当在施工前需要将拟进行的特种设备安装、改造、维修情况书面告知特种设备安全监督管理部门,告知的目的是( )。",[550,552,554,556,558],{"key":20,"text":551,"correct":22},"便于安排现场监督和检验工作",{"key":24,"text":553,"correct":22},"便于安全监督管理部门审查从事活动的企业资格是否符合从事活动的要求",{"key":27,"text":555,"correct":22},"安装的设备是否由合法的生产单位制造",{"key":31,"text":557,"correct":22},"及时掌握特种设备的动态",{"key":34,"text":559,"correct":29},"安装单位必须具有固定的办公场所和通信地址",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":239,"analysis":37},1262162,"房屋建筑安装工程中含有( )。",[564,566,568,570,572],{"key":20,"text":565,"correct":29},"建筑电气工程安装",{"key":24,"text":567,"correct":22},"特种设备安装",{"key":27,"text":569,"correct":22},"消防工程安装",{"key":31,"text":571,"correct":29},"空调工程安装",{"key":34,"text":449,"correct":29},{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":95,"analysis":37},1262163,"建筑给水、排水及采暖工程质量验收的要求,参与单位工程验收时应提供的资料有:( )。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"给水排水及采暖工程的工程质量控制资料",{"key":24,"text":580,"correct":22},"给水排水及采暖工程的工程安全检验资料",{"key":27,"text":582,"correct":22},"给水排水及采暖工程的工程观感质量检查记录",{"key":31,"text":584,"correct":22},"给水排水及采暖工程的工程功能检查资料",{"key":34,"text":586,"correct":22},"给水排水及采暖工程的工程主要功能抽查记录",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":601,"analysis":37},1262164,"建筑工程检测的主要任务:( )。",[591,593,595,597,599],{"key":20,"text":592,"correct":29},"对施工计划进行验证",{"key":24,"text":594,"correct":22},"参与建筑新结构、新技术、新产品的科技成果鉴定",{"key":27,"text":596,"correct":22},"接受委任,对检测对象进行检测",{"key":31,"text":598,"correct":22},"参加工程质量事故处理",{"key":34,"text":600,"correct":22},"参加仲裁检测工作","BCDE",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":138,"analysis":37},1262165,"交底的形式可以是( )。",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"座谈交流",{"key":24,"text":609,"correct":22},"书面告知",{"key":27,"text":611,"correct":22},"模拟演练",{"key":31,"text":613,"correct":22},"样板示范",{"key":34,"text":615,"correct":29},"书信告知",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":310,"analysis":37},1262166,"房屋建筑安装工程施工安全措施的主要关注点有:( )。",[620,622,624,626,628],{"key":20,"text":621,"correct":22},"高空作业",{"key":24,"text":623,"correct":22},"施工机械操作",{"key":27,"text":625,"correct":29},"生活区的选址应符合安全性要求",{"key":31,"text":627,"correct":22},"起重吊装作业",{"key":34,"text":629,"correct":22},"在密闭容器内作业",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":65,"analysis":37},1262167,"施工作业人员的权利包括:( )。",[634,636,638,640,642],{"key":20,"text":635,"correct":22},"有权获得安全防护用具和安全防护服装",{"key":24,"text":637,"correct":22},"有权知晓危险岗位的操作规程和违章操作的危害",{"key":27,"text":639,"correct":22},"作业人员有权施工现场的作业条件、作业程序和作业方式中存在的安全问题提出批评、检举和控告",{"key":31,"text":641,"correct":29},"应当遵守安全施工的强制性标准",{"key":34,"text":643,"correct":29},"应当遵守安全规章制度和操作规程",{"id":645,"libraryId":5,"type":646,"typeLabel":647,"stem":648,"options":649,"answer":651,"analysis":37},1262168,3,"判断题","整个系统联合调试和试运行试验结果形成的记录统称为系统调试试运行记录。",[650,652],{"key":20,"text":651,"correct":22},"正确",{"key":24,"text":653,"correct":29},"错误",{"id":655,"libraryId":5,"type":646,"typeLabel":647,"stem":656,"options":657,"answer":651,"analysis":37},1262169,"要把施工记录的形成时间充分考虑到设计变更送达时间和工程形成时间,要有序结合起来。",[658,659],{"key":20,"text":651,"correct":22},{"key":24,"text":653,"correct":29},{"id":661,"libraryId":5,"type":646,"typeLabel":647,"stem":662,"options":663,"answer":653,"analysis":37},1262170,"施工质量验收最主要的是检验批质量验收记录。",[664,665],{"key":20,"text":651,"correct":29},{"key":24,"text":653,"correct":22},{"id":667,"libraryId":5,"type":646,"typeLabel":647,"stem":668,"options":669,"answer":653,"analysis":37},1262171,"由法规明确的施工记录的内容随着规范标准的修订而变更。",[670,671],{"key":20,"text":651,"correct":29},{"key":24,"text":653,"correct":22},{"id":673,"libraryId":5,"type":646,"typeLabel":647,"stem":674,"options":675,"answer":651,"analysis":37},1262172,"施工记录是工程使用维护和改造扩建的重要基础资料。",[676,677],{"key":20,"text":651,"correct":22},{"key":24,"text":653,"correct":29},{"id":679,"libraryId":5,"type":646,"typeLabel":647,"stem":680,"options":681,"answer":653,"analysis":37},1262173,"油漆作业的防护首要是对人和工作环境的防护。",[682,683],{"key":20,"text":651,"correct":29},{"key":24,"text":653,"correct":22},[685,689,692,695,698,701],{"id":686,"name":687,"category":7,"favorite":688},1,"领导干部任职前廉政法规知识测试题",92,{"id":690,"name":691,"category":7,"favorite":686},595,"建筑结构与设备",{"id":693,"name":694,"category":7,"favorite":686},715,"招标采购专业知识与法律法规",{"id":696,"name":697,"category":7,"favorite":686},848,"市政方向-通用基础",{"id":699,"name":700,"category":7,"favorite":8},534,"BIM工程师",{"id":702,"name":700,"category":7,"favorite":8},535]