[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-845-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":742},{"id":5,"name":6,"category":7,"favorite":8},845,"设备方向-岗位技能","建筑工程",0,5,50,394,[13,38,53,67,82,94,107,121,136,154,171,185,198,212,227,243,257,272,287,301,315,329,344,358,372,386,400,414,429,443,458,473,487,501,515,529,543,558,572,586,600,615,630,644,658,672,686,700,714,728],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1262074,2,"多选题","图纸变更的原因可能有( )。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","设计单位发现原设计不妥主动提出变更",true,{"key":24,"text":25,"correct":22},"B","业主或用户依据需要的变化提出变更",{"key":27,"text":28,"correct":22},"C","施工单位发现施工有问题而提出变更",{"key":30,"text":31,"correct":32},"D","图纸不符合相关规范要求",false,{"key":34,"text":35,"correct":32},"E","气候的变化引起的变动","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1262075,"施工记录有哪两种类型:( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"法规明确的,还有管理制度中明确的",{"key":24,"text":45,"correct":22},"主要在各专业施工规范或管理标准中规定的技术性施工记录",{"key":27,"text":47,"correct":32},"特殊作业施工记录",{"key":30,"text":49,"correct":32},"施工法规明确的",{"key":34,"text":51,"correct":32},"国家特殊规定","AB",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},1262076,"施工记录要符合( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"规范要求",{"key":24,"text":60,"correct":22},"现场实际情况",{"key":27,"text":62,"correct":22},"专业部位要求",{"key":30,"text":64,"correct":32},"施工计划",{"key":34,"text":66,"correct":32},"施工方案",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1262077,"施工记录内容的质量要求包括( )。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"符合性",{"key":24,"text":74,"correct":22},"真实性",{"key":27,"text":76,"correct":22},"准确性",{"key":30,"text":78,"correct":22},"及时性",{"key":34,"text":80,"correct":22},"规范化","ABCDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":36,"analysis":37},1262078,"高空作业方面:防护用品状况包括( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"个人配安全带、安全帽",{"key":24,"text":89,"correct":22},"个人身体素质",{"key":27,"text":91,"correct":22},"设施有安全网",{"key":30,"text":93,"correct":32},"设施有防护栏",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":36,"analysis":37},1262079,"工程项目开工前,由项目部技术负责人向全体员工进行交底,内容包括( )。",[98,100,102,104,105],{"key":20,"text":99,"correct":22},"工程概况",{"key":24,"text":101,"correct":22},"施工方法",{"key":27,"text":103,"correct":22},"主要安全技术措施",{"key":30,"text":66,"correct":32},{"key":34,"text":106,"correct":32},"工程图纸",{"id":108,"libraryId":5,"type":15,"typeLabel":16,"stem":109,"options":110,"answer":81,"analysis":37},1262080,"安全防范工作的基本原则有( )。",[111,113,115,117,119],{"key":20,"text":112,"correct":22},"安全第一、预防为主",{"key":24,"text":114,"correct":22},"以人为本、维护作业人员的合法权益",{"key":27,"text":116,"correct":22},"实事求是",{"key":30,"text":118,"correct":22},"现实性和前瞻性相结合",{"key":34,"text":120,"correct":22},"权责一致",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":135,"analysis":37},1262081,"建筑智能化工程综合布线敷设的线缆,敷设完成均要检查测试,检测的内容包括( )。",[125,127,129,131,133],{"key":20,"text":126,"correct":22},"线缆的弯曲半径",{"key":24,"text":128,"correct":32},"线槽敷设、暗管敷设、线缆间的最大允许距离",{"key":27,"text":130,"correct":22},"建筑物内电缆、光缆及其导管与其他管线间距离",{"key":30,"text":132,"correct":32},"电缆和绞线的芯线起始接点",{"key":34,"text":134,"correct":22},"电缆和绞线的芯线终端接点","ACE",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":153,"analysis":37},1262082,"案例15-4:",[140,142,144,146,148,150],{"key":20,"text":141,"correct":22},"司承建一住宅楼群的机电安装工程,楼群坐落于一个大型公共地下车库上面。工程完工投入使用,情况良好,机电安装工程尤其是地下车库部分被行业协会授予样板工程称号,为省内外同行参观学习的场所。项目部负责人主要介绍了地下车库的施工经验,包括编制切实可行的施工组织设计、进行深化设计,对给水排水、消防、电气、智能化、通风等各专业的工程实体按施工图要求作统一布排安装位置和标高,严格材料采购,加强材料进场验收,所有作业人员上岗前进行业务培训,并到样板室观摩作业,采用先进仪器设备（如激光、红外准直仪）定位,合理安排与其他施工单位的衔接,加强成品保护,避免发生作业中对已安装好成品的污染或移位,施工员、质量员实行每天三次巡视作业,及时处理发现的质量问题,用静态试验和动态考核相结合的办法把好最终检验关等。这些做法获得参观者的认同和好评,从背景分析项目部质量策划达到哪些____目的。",{"key":24,"text":143,"correct":22},"质量策划有效",{"key":27,"text":145,"correct":22},"质量目标和组织结构有明显的成果",{"key":30,"text":147,"correct":22},"落实责任和编制具有可操控性的质量计划有明显的成果",{"key":34,"text":149,"correct":32},"完善质量管理体系有明显的成果",{"key":151,"text":152,"correct":32},"F","更换应用设备","ABCD",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":170,"analysis":37},1262083,"案例15-3:",[158,160,162,164,166,168],{"key":20,"text":159,"correct":22},"司承建某五星级酒店的机电安装工程,正处于施工高峰期。项目部质量员加强了日常巡视检查工作,发现给水管竖井内的大规格管道的承重支架用抱箍坐落在横梁上构成,其构造不够合理。具体表现为抱箍用螺栓紧固后,紧固处两半抱箍间接触面无间隙,折弯的耳部筋板,抱箍与管道贴合不实局部有缝隙。说明抱箍不是处于弹性状态,日后管道通水后重量加大,摩擦力不够,会使承重支架失去功能,管道因之而位移,导致发生事故。质量员要求作业班组整改重做。造成整改的原因是____的因素影响了工程质量。",{"key":24,"text":161,"correct":32},"材料或成品",{"key":27,"text":163,"correct":32},"方法",{"key":30,"text":165,"correct":32},"设计",{"key":34,"text":167,"correct":22},"技术",{"key":151,"text":169,"correct":32},"人","AE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":36,"analysis":37},1262084,"确定质量控制点的基础有( )。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"按掌握的基础知识,区分各专业的施工工艺流程",{"key":24,"text":178,"correct":22},"熟悉工艺技术规律,熟悉依次作业顺序,能区分可并行工作的作业活动",{"key":27,"text":180,"correct":22},"能进行工序质量控制,明确控制的内容和重点",{"key":30,"text":182,"correct":32},"编制施工组织计划或质量计划",{"key":34,"text":184,"correct":32},"在企业通过认证的质量管理体系的基础上结合本项目实际情况,分析质量控刽程序等有关资料是否需要补充和完善",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":81,"analysis":37},1262085,"施工质量策划的结果包括( )。",[189,191,193,195,196],{"key":20,"text":190,"correct":22},"确定质量目标",{"key":24,"text":192,"correct":22},"建立管理组织机构",{"key":27,"text":194,"correct":22},"制定项目部各级部门和人员的职责",{"key":30,"text":182,"correct":22},{"key":34,"text":197,"correct":22},"在企业通过认证的质量管理体系的基础上结合本项目实际情况,分析质量控制程序等有关资料是否需要补充和完善",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":52,"analysis":37},1262086,"招标文件会对工程量提出的解释有( )。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"不论何种情况提供的工程量清单均不作调整",{"key":24,"text":205,"correct":22},"在招标答疑会上允许提出疑问",{"key":27,"text":207,"correct":32},"解释招标工程",{"key":30,"text":209,"correct":32},"招标工程方案",{"key":34,"text":211,"correct":32},"在施工前做好技术交底工作",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":153,"analysis":37},1262087,"案例13-5:",[216,218,220,222,224,226],{"key":20,"text":217,"correct":22},"司承建的某医院通风与空调工程已处于试运转阶段,冷却水管道正在按计划进行用玻璃纤维瓦进行保冷。有三个作业班组平行作业与不同楼层,他们是共同完成了底层门诊大厅挂号室的冷却水保温工作而分工去各个楼层的,原因是门诊大厅的挂号室工程量大,天气渐热、人员密集流动性大,院方急于要使用,因此试运转通冷却水安排为首批。通水后发现玻璃纤维瓦浸满了凝结水,不断往外滴漏,犹如雨淋一般,究其原因,保冷瓦的内径与被保冷管外径不一致,留有空隙,致管壁结露,外敷的铝箔也不紧密,出现了如上所述的质量问题。施工员为此修正了进度计划,并进行了有关调查工作。案例13-5影响作业进度计划实施的可能有____。",{"key":24,"text":219,"correct":22},"项目内部的施工方法失误造成的返工",{"key":27,"text":221,"correct":22},"项目外部的影响因素",{"key":30,"text":223,"correct":22},"对原材进场验收把关不严",{"key":34,"text":225,"correct":32},"供货商供货质量发生差异",{"key":151,"text":211,"correct":32},{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":52,"analysis":37},1262088,"案例13-4:",[231,233,235,237,239,241],{"key":20,"text":232,"correct":22},"司承建的我国东南沿海某市旅游度假别墅群的机电安装工程,已处于收尾阶段,其中给水排水工程主要是室内卫生洁具的配管和每栋别墅的给水管冲洗消毒及排水管的通球试验,室外配合园林绿化做喷水池、水景等的给水管敷设。其时正值南方多雨季节,A公司项目部安排了每个月的作业计划,由于计划安排较妥善,3个月的收尾工作虽有曲折,但能如期完成。案例13-4工程在收尾阶段的给水排水安装的特点____。",{"key":24,"text":234,"correct":22},"工程比较零星分散",{"key":27,"text":236,"correct":32},"有室内室外两类作业环境",{"key":30,"text":238,"correct":32},"室外作业比较复杂",{"key":34,"text":240,"correct":32},"工程进度收室外环境影响",{"key":151,"text":242,"correct":32},"交代资源供给状况",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":36,"analysis":37},1262089,"如交底工作由企业组织,则参加的人员包括( )。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"项目部的相关管理人员",{"key":24,"text":250,"correct":22},"作业队长",{"key":27,"text":252,"correct":22},"分包方的有关人员",{"key":30,"text":254,"correct":32},"业主",{"key":34,"text":256,"correct":32},"用户",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1262090,"施工进度计划编制中应用( )方法或原则。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"循环原理",{"key":24,"text":264,"correct":22},"系统原理",{"key":27,"text":266,"correct":22},"动态控制原理",{"key":30,"text":268,"correct":32},"施工进度原理",{"key":34,"text":270,"correct":22},"信息反馈原理","ABCE",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},1262091,"工程实体的形成应是( )。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"符合施工顺序",{"key":24,"text":279,"correct":22},"符合工艺规律",{"key":27,"text":281,"correct":32},"符合施工要求",{"key":30,"text":283,"correct":32},"符合施工进度",{"key":34,"text":285,"correct":22},"符合当前的科学技术水平","ABE",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":36,"analysis":37},1262092,"系统组件指的是( )。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"水流指示器",{"key":24,"text":294,"correct":22},"报警阀组",{"key":27,"text":296,"correct":22},"节流减压装置",{"key":30,"text":298,"correct":32},"泄水阀",{"key":34,"text":300,"correct":32},"管道",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":36,"analysis":37},1262093,"金属风管制作加工顺序由( )顺序合成。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"板材加工",{"key":24,"text":308,"correct":22},"型材加工",{"key":27,"text":310,"correct":22},"组合",{"key":30,"text":312,"correct":32},"样板加工",{"key":34,"text":314,"correct":32},"卷材",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":328,"analysis":37},1262094,"施工的流向是由( )三个方面的要求决定的。",[319,321,323,325,327],{"key":20,"text":320,"correct":32},"保证施工进度",{"key":24,"text":322,"correct":22},"施工组织",{"key":27,"text":324,"correct":22},"缩短工期",{"key":30,"text":326,"correct":22},"保证施工质量",{"key":34,"text":320,"correct":32},"BCD",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":343,"analysis":37},1262095,"常用的施工组织方法有( )。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"依次施工",{"key":24,"text":336,"correct":22},"平行施工",{"key":27,"text":338,"correct":32},"顺序施工",{"key":30,"text":340,"correct":22},"流水施工",{"key":34,"text":342,"correct":32},"方位施工","ABD",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":328,"analysis":37},1262096,"防排烟通风工程调试检测的准备工作包括( )。",[348,350,352,354,356],{"key":20,"text":349,"correct":32},"调试设备准备",{"key":24,"text":351,"correct":22},"调试检测方案准备",{"key":27,"text":353,"correct":22},"人员组织准备",{"key":30,"text":355,"correct":22},"仪器、仪表准备",{"key":34,"text":357,"correct":32},"风管调试准备",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":81,"analysis":37},1262097,"ZC-8接地电阻测量仪使用的注意事项有( )。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"接地极、电位探测针、电流探测针三者成一直线,电位探测针居中,三者等距,均为20m",{"key":24,"text":365,"correct":22},"接地极、电位探测针、电流探测针各自引出相同截面的绝缘电线接至仪表上,要一一对应不可错接",{"key":27,"text":367,"correct":22},"ZC-8仪表应放置于水平位置,检查调零",{"key":30,"text":369,"correct":22},"先将倍率标度置于最大倍数,慢转摇把,使零指示器位于中间位置,加快转动速度至120y\u002Fmin",{"key":34,"text":371,"correct":22},"测量标度盘的读数乘以倍率标度即得所测接地装置的接地电阻值",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":170,"analysis":37},1262098,"东西向两侧设有卫生间的多层宿舍楼,排水管道工程施工在( )部位做灌水试验。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"雨水排水管道",{"key":24,"text":379,"correct":32},"在西侧卫生间首层地面下的排水管道",{"key":27,"text":381,"correct":32},"系统内的各支路及主干管的阀门",{"key":30,"text":383,"correct":32},"入口总阀和所有泄水阀门和低处泄水阀门",{"key":34,"text":385,"correct":22},"东西两侧卫生间首层地面下的排水管道",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":343,"analysis":37},1262099,"管网测绘的基本方法有( )。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"定位",{"key":24,"text":393,"correct":22},"高程控制",{"key":27,"text":395,"correct":32},"标高",{"key":30,"text":397,"correct":22},"管网竣工图的测量必须在回填土前,测量出管线的起点、终点、窨井标高和管顶标高",{"key":34,"text":399,"correct":32},"标度",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":81,"analysis":37},1262100,"施工日志内容包括( )。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"计划安排",{"key":24,"text":407,"correct":22},"作业人员调动",{"key":27,"text":409,"correct":22},"作业面情况变化",{"key":30,"text":411,"correct":22},"资源变更",{"key":34,"text":413,"correct":22},"日进度统计",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":428,"analysis":37},1262101,"检测工作仪器选用的基本原则有( )。",[418,420,422,424,426],{"key":20,"text":419,"correct":22},"符合测量检测工作的功能要求",{"key":24,"text":421,"correct":32},"检测仪器、仪表必须高精度",{"key":27,"text":423,"correct":22},"精度等级、量程等技术指标符合测量值的需要",{"key":30,"text":425,"correct":22},"必须经过检定合格,有标识,在检定周期内",{"key":34,"text":427,"correct":32},"分门别类按要求对测量检测仪器仪表进行保管","ACD",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":36,"analysis":37},1262102,"自制吊杆的规格应符合设计要求,吊杆应( )。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"平直",{"key":24,"text":436,"correct":22},"螺纹完整",{"key":27,"text":438,"correct":22},"丝扣光洁",{"key":30,"text":440,"correct":32},"白色",{"key":34,"text":442,"correct":32},"黑色",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":457,"analysis":37},1262103,"施工作业中两大必须注意的环保事项是( )。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"消毒水的合理排放和有效处理",{"key":24,"text":450,"correct":32},"消毒水的有效制作",{"key":27,"text":452,"correct":32},"管网的密闭性",{"key":30,"text":454,"correct":22},"管网冲洗及中和的效果",{"key":34,"text":456,"correct":32},"管网设计","AD",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":153,"analysis":37},1262104,"案例10-2:",[462,464,466,468,470,472],{"key":20,"text":463,"correct":22},"司承建的某住宅小区机电安装工程,住宅楼的生活给水管道最终要经消毒合格后才能交付使用,其基本方法是以溶解氯的高浓度消毒水注入管网中,浸泡至规定时间,经取样检验化验菌落数符合标准规定而判定合格,则消毒工作完成,管网排放消毒水,经冲洗中和后交付用户使用。按这样的消毒流程,项目部技术负责人编制了技术交底文件进行交底,并顺利实施按期完工。技术交底时要关注的指标有____。",{"key":24,"text":465,"correct":22},"管网中和清洗",{"key":27,"text":467,"correct":22},"消毒水中氯的浓度",{"key":30,"text":469,"correct":22},"浸泡的时间",{"key":34,"text":471,"correct":32},"化验时菌落数总量",{"key":151,"text":456,"correct":32},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":153,"analysis":37},1262105,"当前提倡技能环保和绿色施工,所以技术交底时要注意( )。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"保护好作业环境",{"key":24,"text":480,"correct":22},"环保要求",{"key":27,"text":482,"correct":22},"妥善处理作业中产生的固体废弃物",{"key":30,"text":484,"correct":22},"防止废气、噪声、强光的污染",{"key":34,"text":486,"correct":32},"做好施工安全设施",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":153,"analysis":37},1262106,"施工技术交底的内容,技术方面有( )。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"施工工艺和方法",{"key":24,"text":494,"correct":22},"技术手段",{"key":27,"text":496,"correct":22},"质量要求",{"key":30,"text":498,"correct":22},"特殊仪器仪表使用",{"key":34,"text":500,"correct":32},"特殊人员培训",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":343,"analysis":37},1262107,"电子巡查线路的确定要依据:( )。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"建筑物的使用功能",{"key":24,"text":508,"correct":22},"安全防范管理要求",{"key":27,"text":510,"correct":32},"建筑物的结构",{"key":30,"text":512,"correct":22},"用户需求",{"key":34,"text":514,"correct":32},"国家规定",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":343,"analysis":37},1262108,"风口风量调整的方法有:( )。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"基准风口法",{"key":24,"text":522,"correct":22},"流量等比分配法",{"key":27,"text":524,"correct":32},"流量等量法",{"key":30,"text":526,"correct":22},"逐项分支调整法",{"key":34,"text":528,"correct":32},"等面积分配法",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":328,"analysis":37},1262109,"施工现场双电源自动切换使用的注意的安全事项有:( )。",[533,535,537,539,541],{"key":20,"text":534,"correct":32},"正常电源和备用电源并联运行",{"key":24,"text":536,"correct":22},"正常电源和备用电源电压值保持在相同的水平",{"key":27,"text":538,"correct":22},"两者接入馈电线路时应严格保持相序一致",{"key":30,"text":540,"correct":22},"正常电源和备用电源不能并联运行",{"key":34,"text":542,"correct":32},"正常电源和备用电源能并联运行",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":557,"analysis":37},1262110,"湿式报警阀组采取了哪些措施防止误报( )。",[547,549,551,553,555],{"key":20,"text":548,"correct":32},"报警阀内设有平衡管路",{"key":24,"text":550,"correct":32},"在报警阀至警铃的管路上设置开关",{"key":27,"text":552,"correct":22},"报警阀内没有平衡管路",{"key":30,"text":554,"correct":32},"在报警阀至警铃的管路上设置保护器",{"key":34,"text":556,"correct":22},"在报警阀至警铃的管路上设置延时器","CE",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":36,"analysis":37},1262111,"建筑电气工程图包含( )。",[562,564,566,568,570],{"key":20,"text":563,"correct":22},"系统图",{"key":24,"text":565,"correct":22},"电路图",{"key":27,"text":567,"correct":22},"平面图",{"key":30,"text":569,"correct":32},"风管系统图",{"key":34,"text":571,"correct":32},"电气系统图",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":36,"analysis":37},1262112,"给水排水识读施工图纸的基本方法有( )。",[576,578,580,582,584],{"key":20,"text":577,"correct":22},"先阅读标题栏",{"key":24,"text":579,"correct":22},"其次阅读材料表",{"key":27,"text":581,"correct":22},"核对不同图纸上反映的同一条管子、同一个阀门的规格型号是否一致,同一个接口位置是否相同",{"key":30,"text":583,"correct":32},"检查图纸图标",{"key":34,"text":585,"correct":32},"阅读带电气装置的三视图",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":36,"analysis":37},1262113,"对特殊作业人员管理的基本要求是:( )。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"须经考试或考核合格、持证上岗",{"key":24,"text":593,"correct":22},"合格证书要按规定期限进行复审",{"key":27,"text":595,"correct":22},"离开特殊作业一定期限者,必须重新考试合格,方可上岗",{"key":30,"text":597,"correct":32},"必须由身体健康证明",{"key":34,"text":599,"correct":32},"必须经考核上岗",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":614,"analysis":37},1262114,"安装工程资源管理的特殊点主要表现在( )。",[604,606,608,610,612],{"key":20,"text":605,"correct":32},"资源管理方面",{"key":24,"text":607,"correct":22},"人力资源方面",{"key":27,"text":609,"correct":22},"材料管理方面",{"key":30,"text":611,"correct":32},"方案设计方面",{"key":34,"text":613,"correct":32},"施工进度方面","BC",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":629,"analysis":37},1262115,"现场材料堆放场地应注意的事项有:( )。",[619,621,623,625,627],{"key":20,"text":620,"correct":32},"方便施工,避免或减少一次搬运",{"key":24,"text":622,"correct":22},"符合防火、防潮要求,便于保管和搬运",{"key":27,"text":624,"correct":22},"要不妨碍作业位置,避免料场迁移",{"key":30,"text":626,"correct":22},"码放整齐,便于识别,危险品单独存放",{"key":34,"text":628,"correct":22},"方便施工,避免或减少二次搬运","BCDE",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":428,"analysis":37},1262116,"对施工方案的比较的方法,经济性比较包括( )。",[634,636,638,640,642],{"key":20,"text":635,"correct":22},"比较不同方案的投资额度",{"key":24,"text":637,"correct":32},"比较不同方案的经济计划性",{"key":27,"text":639,"correct":22},"比较不同方案的投资中发生的手段用料或添置的施工机械可重复使用的程度",{"key":30,"text":641,"correct":22},"比较不同方案对施工产值增长率的贡献",{"key":34,"text":643,"correct":32},"比较不同方案实施的安全可靠性",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":36,"analysis":37},1262117,"房屋建筑安装工程施工单位按施工组织计划的( )原则规定结合施工项目实际和单位要求,组建编制小组。",[648,650,652,654,656],{"key":20,"text":649,"correct":22},"编制原则",{"key":24,"text":651,"correct":22},"编制依据",{"key":27,"text":653,"correct":22},"编制内容",{"key":30,"text":655,"correct":32},"编制目的",{"key":34,"text":657,"correct":32},"编制规则",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":271,"analysis":37},1262118,"使用焊机应注意的安全问题:( )。",[662,664,666,668,670],{"key":20,"text":663,"correct":22},"焊机应与安装环境条件相适应",{"key":24,"text":665,"correct":22},"焊机应远离易燃易爆物品",{"key":27,"text":667,"correct":22},"焊机应通风良好,避免受潮,并能防止异物进入",{"key":30,"text":669,"correct":32},"焊机外壳应不可靠接地",{"key":34,"text":671,"correct":22},"焊机外壳应可靠接地",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":81,"analysis":37},1262119,"滑轮的分类:按滑轮数量多少分有( )。",[676,678,680,682,684],{"key":20,"text":677,"correct":22},"单滑轮",{"key":24,"text":679,"correct":22},"双滑轮",{"key":27,"text":681,"correct":22},"三轮",{"key":30,"text":683,"correct":22},"四轮",{"key":34,"text":685,"correct":22},"多轮",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":286,"analysis":37},1262120,"麻绳一般有( )。",[690,692,694,696,698],{"key":20,"text":691,"correct":22},"三股",{"key":24,"text":693,"correct":22},"四股",{"key":27,"text":695,"correct":32},"五股",{"key":30,"text":697,"correct":32},"八股",{"key":34,"text":699,"correct":22},"九股",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":52,"analysis":37},1262121,"电动卷扬机的种类按卷筒形式有( )。",[704,706,708,710,712],{"key":20,"text":705,"correct":22},"单筒",{"key":24,"text":707,"correct":22},"双筒",{"key":27,"text":709,"correct":32},"可逆减速箱式",{"key":30,"text":711,"correct":32},"摩擦离合式",{"key":34,"text":713,"correct":32},"多筒",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":343,"analysis":37},1262122,"在设备安装工程中常用的自行起重机有( )。",[718,720,722,724,726],{"key":20,"text":719,"correct":22},"汽车式起重机",{"key":24,"text":721,"correct":22},"履带式起重机",{"key":27,"text":723,"correct":32},"链条式起重机",{"key":30,"text":725,"correct":22},"轮胎式起重机",{"key":34,"text":727,"correct":32},"皮带式起重机",{"id":729,"libraryId":5,"type":15,"typeLabel":16,"stem":730,"options":731,"answer":343,"analysis":37},1262123,"施工升降机的安全装置包括( )。",[732,734,736,738,740],{"key":20,"text":733,"correct":22},"防坠安全器",{"key":24,"text":735,"correct":22},"电气安全开关",{"key":27,"text":737,"correct":32},"电动锁门",{"key":30,"text":739,"correct":22},"机械门锁以及吊笼门的机械联锁装置",{"key":34,"text":741,"correct":32},"联锁装置",[743,747,750,753,756,759],{"id":744,"name":745,"category":7,"favorite":746},1,"领导干部任职前廉政法规知识测试题",92,{"id":748,"name":749,"category":7,"favorite":744},595,"建筑结构与设备",{"id":751,"name":752,"category":7,"favorite":744},715,"招标采购专业知识与法律法规",{"id":754,"name":755,"category":7,"favorite":744},848,"市政方向-通用基础",{"id":757,"name":758,"category":7,"favorite":8},534,"BIM工程师",{"id":760,"name":758,"category":7,"favorite":8},535]