[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-845-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},845,"设备方向-岗位技能","建筑工程",0,4,50,394,[13,34,42,54,66,78,86,98,110,122,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,330,338,350,359,371,383,395,407,416,428,440,452,464,472,484,493,505,517,528,540,552,564,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1262023,1,"单选题","质量控制是指( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","致力于满足质量要求",true,{"key":24,"text":25,"correct":26},"B","致力于制定质量目标并规定必要的运行工程和相关资源以实现质量目标",false,{"key":28,"text":29,"correct":26},"C","致力于增强满足质量要求的能力",{"key":31,"text":32,"correct":26},"D","致力于提供质量要求会得到满足的信任","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1262024,"质量策划是指( )。",[38,39,40,41],{"key":20,"text":29,"correct":26},{"key":24,"text":25,"correct":22},{"key":28,"text":21,"correct":26},{"key":31,"text":32,"correct":26},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":20,"analysis":33},1262025,"产品分为( )。",[46,48,50,52],{"key":20,"text":47,"correct":22},"有形产品和无形产品",{"key":24,"text":49,"correct":26},"概念产品和实体产品",{"key":28,"text":51,"correct":26},"明确产品和隐含产品",{"key":31,"text":53,"correct":26},"概念产品和无形产品",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":20,"analysis":33},1262026,"不属于事故主要原因( )。",[58,60,62,64],{"key":20,"text":59,"correct":22},"没有安全规范或不健全",{"key":24,"text":61,"correct":26},"技术和设计上有缺陷",{"key":28,"text":63,"correct":26},"不懂操作技术知识",{"key":31,"text":65,"correct":26},"违反操作规程或劳动纪律",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":31,"analysis":33},1262027,"交通事故、火灾事故自发生之日起( )日内,事故造成的伤亡人数发生变化的,应当及时补报。",[70,72,74,76],{"key":20,"text":71,"correct":26},"20",{"key":24,"text":73,"correct":26},"30",{"key":28,"text":75,"correct":26},"14",{"key":31,"text":77,"correct":22},"7",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":24,"analysis":33},1262028,"自事故发生之日起( )日内,事故造成的伤亡人数发生变化的,应当及时补报。",[82,83,84,85],{"key":20,"text":71,"correct":26},{"key":24,"text":73,"correct":22},{"key":28,"text":75,"correct":26},{"key":31,"text":77,"correct":26},{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":28,"analysis":33},1262029,"不属于报告事故应该包括的内容( )。",[90,92,94,96],{"key":20,"text":91,"correct":26},"事故发生单位概况",{"key":24,"text":93,"correct":26},"事故发生的时间、地点以及事故现场的情况",{"key":28,"text":95,"correct":22},"进行补救的措施",{"key":31,"text":97,"correct":26},"其他应当报告的情况",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":24,"analysis":33},1262030,"轻伤事故,在逐级报告的同时,项目部填写“伤亡事故登记表”一式两份,报企业安全管理部门一份,项目部自存一份,通报时间最迟不能晚于事故发生后( )小时。",[102,104,106,108],{"key":20,"text":103,"correct":26},"36",{"key":24,"text":105,"correct":22},"24",{"key":28,"text":107,"correct":26},"12",{"key":31,"text":109,"correct":26},"48",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":28,"analysis":33},1262031,"施害物是( )。",[114,116,118,120],{"key":20,"text":115,"correct":26},"指直接引起中毒的物体或物质",{"key":24,"text":117,"correct":26},"导致事故发生的物体和物质",{"key":28,"text":119,"correct":22},"指直接引起伤害及中毒的物体或物质",{"key":31,"text":121,"correct":26},"导致伤害发生的物体和物质",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":24,"analysis":33},1262032,"起因物是( )。",[126,127,128,129],{"key":20,"text":115,"correct":26},{"key":24,"text":117,"correct":22},{"key":28,"text":119,"correct":26},{"key":31,"text":121,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1262033,"应急预案的主要内容不包括( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"各种救护设施是否齐全有效",{"key":24,"text":137,"correct":26},"可依托的社会力量及其救援和联络程序",{"key":28,"text":139,"correct":26},"应急避险的行动程序,应急预案的培训程序",{"key":31,"text":141,"correct":26},"发生事故时应采取的有效措施",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1262034,"风险等级一般分为( )级。",[146,148,150,152],{"key":20,"text":147,"correct":26},"六",{"key":24,"text":149,"correct":22},"五",{"key":28,"text":151,"correct":26},"七",{"key":31,"text":153,"correct":26},"四",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1262035,"风险识别的三种状态不包括( )。",[158,160,162,164],{"key":20,"text":159,"correct":26},"正常状态",{"key":24,"text":161,"correct":26},"异常状态",{"key":28,"text":163,"correct":26},"紧急状态",{"key":31,"text":165,"correct":22},"突然状态",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1262036,"在危险源的种类,属于第一种的( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"电能伤害",{"key":24,"text":173,"correct":26},"人的偏离标准要求的不安全行为",{"key":28,"text":175,"correct":26},"环境问题促使人的失误",{"key":31,"text":177,"correct":26},"物的故障发生",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1262037,"对房屋建筑安装工程中产生的环境污染源识别后,应按程序采取措施不包括( )。",[182,184,186,188],{"key":20,"text":183,"correct":26},"对确定的重要环境因素制定目标、指标及管理方案",{"key":24,"text":185,"correct":22},"暂不通报可能受到污染危害的单位和居民",{"key":28,"text":187,"correct":26},"明确相关岗位人员和管理人员的职责",{"key":31,"text":189,"correct":26},"建立环境保护信息沟通渠道",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1262038,"环境事故发生后的处置不包括( )。",[194,196,198,200],{"key":20,"text":195,"correct":22},"建立对施工现场环境保护的制度",{"key":24,"text":197,"correct":26},"按应急预案立即采取措施处理,防止事故扩大或发生次生灾害",{"key":28,"text":199,"correct":26},"积极接受事故调查处理",{"key":31,"text":201,"correct":26},"暂停相关施工作业,保护好事故现场",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1262039,"文明施工要求,场容管理不包括( )。",[206,208,210,212],{"key":20,"text":207,"correct":22},"建立施工保护措施",{"key":24,"text":209,"correct":26},"建立文明施工责任制,划分区域,明确管理负责人",{"key":28,"text":211,"correct":26},"施工地点和周围清洁整齐,做到随时处理、工完场清",{"key":31,"text":213,"correct":26},"施工现场不随意堆垃圾,要按规划地点分类堆放,定期处理,并按规定分类清理",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1262040,"文明施工要求,材料管理不包括( )。",[218,220,222,224],{"key":20,"text":219,"correct":26},"库房内材料要分类码放整齐,限宽限高,上架入箱,标识齐全",{"key":24,"text":221,"correct":26},"易燃易爆及有毒有害物品仓库按规定距离单独设立,且远离生活区和施工区,有专人保护",{"key":28,"text":223,"correct":26},"配有消防器材",{"key":31,"text":225,"correct":22},"库房应高大宽敞",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1262041,"文明施工要求，现场道路设置：消防通道形成环形，宽度不小于( )m。",[230,232,234,236],{"key":20,"text":231,"correct":26},"3.9",{"key":24,"text":233,"correct":26},"3.0",{"key":28,"text":235,"correct":26},"2.9",{"key":31,"text":237,"correct":22},"3.5",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1262042,"施工作业的安全管理重点不包括( )。",[242,244,246,248],{"key":20,"text":243,"correct":26},"带电调试作业",{"key":24,"text":245,"correct":26},"管道、设备的试压、冲洗、消毒作业",{"key":28,"text":247,"correct":26},"单机试运转",{"key":31,"text":249,"correct":22},"双机联动试运转",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1262043,"高空作业要从( )人手加强安全管理。",[254,256,258,260],{"key":20,"text":255,"correct":22},"作业人员的身体健康状况和配备必要的防护设施",{"key":24,"text":257,"correct":26},"完备的操作使用规范",{"key":28,"text":259,"correct":26},"需持证上岗的人员",{"key":31,"text":261,"correct":26},"上岗方案的审定",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1262044,"进度计划调整的方法不包括( )。",[266,268,270,272],{"key":20,"text":267,"correct":26},"改变作业组织形式",{"key":24,"text":269,"correct":26},"在不违反工艺规律的情况下改变专业或工序衔接关系",{"key":28,"text":271,"correct":26},"修正施工方案",{"key":31,"text":273,"correct":22},"各专业分包单位不能如期履行分包合同",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1262045,"不属于影响进度控制的有( )。",[278,280,282,284],{"key":20,"text":279,"correct":26},"动态控制原理",{"key":24,"text":281,"correct":26},"循环原理",{"key":28,"text":283,"correct":22},"静态控制原理",{"key":31,"text":285,"correct":26},"弹性原理",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1262046,"施工作业进度计划是对单位工程进度计划目标分解后的计划,可按( )为单元进行编制。",[290,292,294,296],{"key":20,"text":291,"correct":26},"单位工程",{"key":24,"text":293,"correct":22},"分项工程或工序",{"key":28,"text":295,"correct":26},"主项工程",{"key":31,"text":297,"correct":26},"分部工程",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},1262047,"不属于主要施工管理计划的是( )。",[302,304,306,308],{"key":20,"text":303,"correct":26},"进度管理计划",{"key":24,"text":305,"correct":26},"成本管理计划",{"key":28,"text":307,"correct":26},"环境管理计划",{"key":31,"text":309,"correct":22},"绿色施工管理计划",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1262048,"施工方案以( )为主要对象编制的施工技术和组织方案,用以( )。",[314,316,318,320],{"key":20,"text":315,"correct":26},"若干单位工程组成的群体工程或特大型工程项目,整个项目的施工过程起到统筹规划、重点控制的作用",{"key":24,"text":317,"correct":26},"单位工程,单位工程的施工工程起指导和制约作用",{"key":28,"text":319,"correct":22},"分部工程或专项工程,具体指导其施工工程",{"key":31,"text":321,"correct":26},"专项工程,单位工程的施工工程起指导和制约作用",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1262049,"单位工程施工组织设计以( )为主要对象编制的施工组织设计,对( )。",[326,327,328,329],{"key":20,"text":315,"correct":26},{"key":24,"text":317,"correct":22},{"key":28,"text":319,"correct":26},{"key":31,"text":321,"correct":26},{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1262050,"施工组织总设计以( )为主要对象编制的施工组织设计,有对( )。",[334,335,336,337],{"key":20,"text":315,"correct":22},{"key":24,"text":317,"correct":26},{"key":28,"text":319,"correct":26},{"key":31,"text":321,"correct":26},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":28,"analysis":33},1262051,"施工单位违反工程建设强制性标准的,责令改正,处工程合同价款( )的罚款。",[342,344,346,348],{"key":20,"text":343,"correct":26},"3%以上4010以下",{"key":24,"text":345,"correct":26},"2%以上3010以下",{"key":28,"text":347,"correct":22},"2%以上4%以下",{"key":31,"text":349,"correct":26},"3%以上5%以下",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":28,"analysis":33},1262052,"其他建筑工程按照国家工程建设消防技术标准进行的消防设计,建设单位应当自依法取得施工许可之日起( )个工作日内,将消防设计文件报公安机关消防机构备案,公安机关消防机构应当进行抽查消防设计文件。",[354,355,356,357],{"key":20,"text":149,"correct":26},{"key":24,"text":147,"correct":26},{"key":28,"text":151,"correct":22},{"key":31,"text":358,"correct":26},"八",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},1262053,"特种设备大型游乐设施,其范围规定的设计最大运行线速度不小于( )m\u002Fs,或者运行高度距地面高于或等于( )m的载人大型游乐设施。",[363,365,367,369],{"key":20,"text":364,"correct":26},"1,1",{"key":24,"text":366,"correct":26},"1,2",{"key":28,"text":368,"correct":26},"2,1",{"key":31,"text":370,"correct":22},"2,2",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},1262054,"特种设备压力管道,其范围规定最高工作压力不小于( )MPa（表压）的流体,且公称直径大于( )mm的管道。",[375,377,379,381],{"key":20,"text":376,"correct":26},"0.2,25",{"key":24,"text":378,"correct":22},"0.1,25",{"key":28,"text":380,"correct":26},"0.2,20",{"key":31,"text":382,"correct":26},"0.1,20",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":31,"analysis":33},1262055,"特种设备锅炉,其范围规定为容积不小于( )L的承压蒸汽锅炉;出口水压不小于( )MPa（表压）,且额定功率不小于( )MW的承压热水锅炉。",[387,389,391,393],{"key":20,"text":388,"correct":26},"30,0.2,0.1",{"key":24,"text":390,"correct":26},"30,0.1,0.2",{"key":28,"text":392,"correct":26},"20,0.1,0.1",{"key":31,"text":394,"correct":22},"30,0.1,0.1",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},1262056,"应选用安全电压照明灯具，单相照明每一回路，灯具和插座数量不宜超过( )个，并装设熔断电流( )的熔断器保护。",[399,401,403,405],{"key":20,"text":400,"correct":26},"20，15A及15A以下",{"key":24,"text":402,"correct":26},"25，10A及10A以下",{"key":28,"text":404,"correct":26},"30，15A及15A以下",{"key":31,"text":406,"correct":22},"25，15A及15A以下",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1262057,"应选用安全电压照明灯具,特别潮湿的场所、导电良好的场面、金属容器内等,电源电压不大于( )V。",[411,412,413,414],{"key":20,"text":107,"correct":22},{"key":24,"text":105,"correct":26},{"key":28,"text":103,"correct":26},{"key":31,"text":415,"correct":26},"60",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},1262058,"临时用电设备在( )或设备总容量在( )者,应编制临时用电施工组织设计。",[420,422,424,426],{"key":20,"text":421,"correct":22},"5台及5台以上,50kW及50kW以上",{"key":24,"text":423,"correct":26},"4台及4台以上,50kW及50kW以上",{"key":28,"text":425,"correct":26},"5台及5台以上,40kW及40kW以上",{"key":31,"text":427,"correct":26},"6台及6台以上,50kW及50kW以上",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},1262059,"建筑工程质量验收共8条,强调( )是基础,同时体现了质量控制资料在分部和单位工程验收时的重要作用。",[432,434,436,438],{"key":20,"text":433,"correct":22},"检验批验收合格",{"key":24,"text":435,"correct":26},"单位工程验收合格",{"key":28,"text":437,"correct":26},"分部工程验收合格",{"key":31,"text":439,"correct":26},"分项工程验收合格",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1262060,"建筑工程质量验收的划分共8条,说明施工质量验收按( )层次进行,并具体规定了划分的原则和方法。",[444,446,448,450],{"key":20,"text":445,"correct":22},"单位工程、分部工程、分项工程、检验批",{"key":24,"text":447,"correct":26},"检验批、分部工程、单位工程",{"key":28,"text":449,"correct":26},"质量体系、质量控制、质量验收",{"key":31,"text":451,"correct":26},"分项工程、分部工程、单位工程",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},1262061,"备案机关发现建设单位在竣工验收过程中有违反国家有关建设工程质量管理规定行为的,应在收讫竣工验收备案文件( )日内,责令停止使用,重新组织竣工验收。",[456,458,460,462],{"key":20,"text":457,"correct":26},"5",{"key":24,"text":459,"correct":22},"15",{"key":28,"text":461,"correct":26},"10",{"key":31,"text":463,"correct":26},"8",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},1262062,"建设单位应自工程竣工验收合格之日( )日内,依照竣工验收管理暂行办法规定,向工程所在地县级以上地方人民政府建设行政主管部门备案。",[468,469,470,471],{"key":20,"text":457,"correct":26},{"key":24,"text":459,"correct":22},{"key":28,"text":461,"correct":26},{"key":31,"text":463,"correct":26},{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":28,"analysis":33},1262063,"施工单位不履行保修义务或拖延履行保修义务的,由建设行政主管部门责令改正,并处于( )的罚款。",[476,478,480,482],{"key":20,"text":477,"correct":26},"20万元以下",{"key":24,"text":479,"correct":26},"15万元以上20万元以下",{"key":28,"text":481,"correct":22},"10万元以上20万元以下",{"key":31,"text":483,"correct":26},"10万元以上15万元以下",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":28,"analysis":33},1262064,"工程质量保修期限,电气管线、给水排水管道、设备安装为( )年;装修工程为( )年。",[488,489,491,492],{"key":20,"text":368,"correct":26},{"key":24,"text":490,"correct":26},"3,2",{"key":28,"text":370,"correct":22},{"key":31,"text":366,"correct":26},{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":31,"analysis":33},1262065,"地基基础工程和主体结构工程,工程质量保修期限是( )。",[497,499,501,503],{"key":20,"text":498,"correct":26},"至少80年",{"key":24,"text":500,"correct":26},"至多90年",{"key":28,"text":502,"correct":26},"至少50年",{"key":31,"text":504,"correct":22},"为设计文件规定的该工程的合理使用年限",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":28,"analysis":33},1262066,"属于建筑工程检测的目的是( )。",[509,511,513,515],{"key":20,"text":510,"correct":26},"对施工计划进行验证",{"key":24,"text":512,"correct":26},"参与建筑新结构、新技术、新产品的科技成果鉴定",{"key":28,"text":514,"correct":22},"保证建筑工程质量",{"key":31,"text":516,"correct":26},"加快施工进度",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},1262067,"属于危险性较大的分部分项工程的安全管理( )。",[521,523,524,526],{"key":20,"text":522,"correct":22},"有专项的施工方案",{"key":24,"text":243,"correct":26},{"key":28,"text":525,"correct":26},"生活区的选址应符合安全性要求",{"key":31,"text":527,"correct":26},"正确使用安全防护用具和用品",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":31,"analysis":33},1262068,"不属于编制专项工程方案的工程有( )。",[532,534,536,538],{"key":20,"text":533,"correct":26},"其他危险性较大的工程",{"key":24,"text":535,"correct":26},"起重吊装工程",{"key":28,"text":537,"correct":26},"拆除爆破工程",{"key":31,"text":539,"correct":22},"高大模板工程",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},1262069,"不属于房屋建筑安装工程施工安全措施的主要关注点是( )。",[544,546,548,550],{"key":20,"text":545,"correct":26},"高空作业",{"key":24,"text":547,"correct":26},"施工机械操作",{"key":28,"text":549,"correct":26},"动用明火作业",{"key":31,"text":551,"correct":22},"认真接受安全教育培训",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},1262070,"施工作业人员的义务包括:( )。",[556,558,560,562],{"key":20,"text":557,"correct":26},"有权获得安全防护用具和安全防护服装",{"key":24,"text":559,"correct":26},"有权知晓危险岗位的操作规程和违章操作的危害",{"key":28,"text":561,"correct":26},"在施工中发生危及人身安全的紧急情况时,作业人员有权即停止作业或采取必要的应急措施后撤离危险区域",{"key":31,"text":563,"correct":22},"应当遵守安全施工的强制性标准",{"id":565,"libraryId":5,"type":566,"typeLabel":567,"stem":568,"options":569,"answer":581,"analysis":33},1262072,2,"多选题","整个系统联合调试和试运行试验包括( )。",[570,572,574,576,578],{"key":20,"text":571,"correct":22},"空载试运行",{"key":24,"text":573,"correct":22},"有载试运行",{"key":28,"text":575,"correct":22},"满负荷试运行",{"key":31,"text":577,"correct":26},"变负荷试运行",{"key":579,"text":580,"correct":26},"E","90%负荷试运行","ABC",{"id":583,"libraryId":5,"type":566,"typeLabel":567,"stem":584,"options":585,"answer":596,"analysis":33},1262073,"通风与空调工程施工试验类记录有( )。",[586,588,590,592,594],{"key":20,"text":587,"correct":26},"风管的密闭性试验",{"key":24,"text":589,"correct":22},"整个系统联合调试和试运行试验",{"key":28,"text":591,"correct":26},"单体双机的措施试验",{"key":31,"text":593,"correct":26},"单体混合机的措施试验",{"key":579,"text":595,"correct":22},"单体单机的措施试验","BE",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]