[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-845-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":568},{"id":5,"name":6,"category":7,"favorite":8},845,"设备方向-岗位技能","建筑工程",0,3,50,394,[13,34,46,58,70,81,93,105,116,128,140,152,164,173,185,195,207,219,231,243,252,264,272,280,292,301,313,325,333,344,356,367,375,387,395,407,419,431,443,451,460,472,483,495,504,512,524,533,545,556],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1261972,1,"单选题","当滑轮的轴套磨损超过轴套的( )及滑轮槽磨损达到壁厚的( )时均应更换,以确保安全使用。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","1\u002F4,10%",false,{"key":24,"text":25,"correct":22},"B","1\u002F4,15%",{"key":27,"text":28,"correct":29},"C","1\u002F5,10%",true,{"key":31,"text":32,"correct":22},"D","1\u002F5,15%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1261973,"对滑轮易损件,如当滑轮轴磨损超过轴颈的( )时,应于报废更换。",[38,40,42,44],{"key":20,"text":39,"correct":29},"2%",{"key":24,"text":41,"correct":22},"3%",{"key":27,"text":43,"correct":22},"5%",{"key":31,"text":45,"correct":22},"8%",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1261974,"滑轮的分类,按使用方法分有( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"定滑轮和动滑轮",{"key":24,"text":53,"correct":29},"定滑轮、动滑轮以及动、定滑轮组成的滑轮组",{"key":27,"text":55,"correct":22},"导向滑轮和平衡滑轮",{"key":31,"text":57,"correct":22},"硬质滑轮和钢滑轮",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1261975,"( )MPa不属于钢丝绳的强度级别。",[62,64,66,68],{"key":20,"text":63,"correct":29},"1370",{"key":24,"text":65,"correct":22},"1470",{"key":27,"text":67,"correct":22},"1570",{"key":31,"text":69,"correct":22},"1770",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1261976,"尼龙绳和涤纶绳的抗水性能达到( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"90%～96%",{"key":24,"text":77,"correct":22},"90%～99%",{"key":27,"text":79,"correct":29},"96%～99%",{"key":31,"text":75,"correct":22},{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},1261977,"麻绳使用注意事项:如果与滑轮配合使用,滑轮直径应大于绳径( )倍。",[85,87,89,91],{"key":20,"text":86,"correct":22},"8—10",{"key":24,"text":88,"correct":29},"7～10",{"key":27,"text":90,"correct":22},"7～9",{"key":31,"text":92,"correct":22},"6—9",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1261978,"麻绳只能用来捆绑吊运( )kg以内的物体或用作平衡绳、溜绳和受力不大的缆风绳。",[97,99,101,103],{"key":20,"text":98,"correct":22},"800",{"key":24,"text":100,"correct":29},"500",{"key":27,"text":102,"correct":22},"1500",{"key":31,"text":104,"correct":22},"1800",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},1261979,"电动卷扬机在使用时如发现卷筒壁减薄( )必须进行修理和更换。",[109,111,113,114],{"key":20,"text":110,"correct":22},"15%",{"key":24,"text":112,"correct":29},"10%",{"key":27,"text":45,"correct":22},{"key":31,"text":115,"correct":22},"12%",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1261980,"导向滑轮与卷筒保持适当距离,使钢丝绳在卷筒上缠绕时最大偏离角不超过( )。",[120,122,124,126],{"key":20,"text":121,"correct":22},"3度",{"key":24,"text":123,"correct":29},"2度",{"key":27,"text":125,"correct":22},"4度",{"key":31,"text":127,"correct":22},"5度",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1261981,"操作时,电动卷扬机卷筒上的钢丝绳余留圈数不应少于( )圈。",[132,134,136,138],{"key":20,"text":133,"correct":29},"3",{"key":24,"text":135,"correct":22},"4",{"key":27,"text":137,"correct":22},"2",{"key":31,"text":139,"correct":22},"5",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":31,"analysis":33},1261982,"千斤顶按照结构不同,可分为( )。",[144,146,148,150],{"key":20,"text":145,"correct":22},"螺旋千斤顶和液压千斤顶",{"key":24,"text":147,"correct":22},"螺旋千斤顶和齿条千斤顶",{"key":27,"text":149,"correct":22},"液压千斤顶和齿条千斤顶",{"key":31,"text":151,"correct":29},"螺旋千斤顶、液压千斤顶和齿条千斤顶",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1261983,"捌链按结构不同,可分为( )。",[156,158,160,162],{"key":20,"text":157,"correct":29},"蜗杆传动和圆柱齿轮传动",{"key":24,"text":159,"correct":22},"链带传动和圆柱齿轮传动",{"key":27,"text":161,"correct":22},"链带传动和连杆传动",{"key":31,"text":163,"correct":22},"蜗杆传动和连杆传动",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":31,"analysis":33},1261984,"捌链使用注意事项:发现吊钩磨损超过( )时,必须更换。",[168,169,170,172],{"key":20,"text":110,"correct":22},{"key":24,"text":115,"correct":22},{"key":27,"text":171,"correct":22},"9%",{"key":31,"text":112,"correct":29},{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},1261985,"捌链的起重能力一般不超过( )t,起重高度一般不超过( )m。",[177,179,181,183],{"key":20,"text":178,"correct":22},"15.6",{"key":24,"text":180,"correct":22},"10.7",{"key":27,"text":182,"correct":22},"15.7",{"key":31,"text":184,"correct":29},"10.6",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":31,"analysis":33},1261986,"履带式起重机满负荷起吊时,应先将重物吊离地面( )mm左右,对设备作一次全面检查,确认安全可靠后,方可起吊。",[189,190,191,193],{"key":20,"text":100,"correct":22},{"key":24,"text":98,"correct":22},{"key":27,"text":192,"correct":22},"400",{"key":31,"text":194,"correct":29},"200",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":20,"analysis":33},1261987,"雨雪天作业,起重机制动器容易失灵,故吊钩起落要缓慢。如遇( )级以上大风应停止吊装作业。",[199,201,203,205],{"key":20,"text":200,"correct":29},"六",{"key":24,"text":202,"correct":22},"七",{"key":27,"text":204,"correct":22},"八",{"key":31,"text":206,"correct":22},"五",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":31,"analysis":33},1261988,"汽车式起重机负重工作时,吊臂的左右旋转角度都不能超过( ),回转速度要缓慢。",[211,213,215,217],{"key":20,"text":212,"correct":22},"50度",{"key":24,"text":214,"correct":22},"60度",{"key":27,"text":216,"correct":22},"40度",{"key":31,"text":218,"correct":29},"45度",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":27,"analysis":33},1261989,"项目部要对施工升降机的使用建立相关的管理制度不包括( )。",[223,225,227,229],{"key":20,"text":224,"correct":22},"司机的岗位责任制",{"key":24,"text":226,"correct":22},"交接班制度",{"key":27,"text":228,"correct":29},"升降机的使用培训",{"key":31,"text":230,"correct":22},"维护保养检查制度",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":24,"analysis":33},1261990,"防护围栏的作用是( )。",[235,237,239,241],{"key":20,"text":236,"correct":22},"按一定间距连接导轨架与建筑物或其他固定结构,用以支撑导轨架,使导轨架直立、可靠、稳固",{"key":24,"text":238,"correct":29},"为防止吊笼离开底层基础平台后",{"key":27,"text":240,"correct":22},"用以支承和引导吊笼、对重等装置运行,使运行方向保持垂直",{"key":31,"text":242,"correct":22},"用以运载人员或货物,并有驾驶室,内设操控系统",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":27,"analysis":33},1261991,"导轨架的作用是( )。",[247,248,250,251],{"key":20,"text":236,"correct":22},{"key":24,"text":249,"correct":22},"为防护吊笼离开底层基础平台后",{"key":27,"text":240,"correct":29},{"key":31,"text":242,"correct":22},{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":27,"analysis":33},1261992,"进度统计报告是( )。",[256,258,260,262],{"key":20,"text":257,"correct":22},"预算收入为基本控制目标",{"key":24,"text":259,"correct":22},"成本控制的指导性文件",{"key":27,"text":261,"correct":29},"实际成本发生的重要信息来源",{"key":31,"text":263,"correct":22},"施工成本计划",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":24,"analysis":33},1261993,"施工成本计划是( )。",[268,269,270,271],{"key":20,"text":257,"correct":22},{"key":24,"text":259,"correct":29},{"key":27,"text":261,"correct":22},{"key":31,"text":263,"correct":22},{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1261994,"工程的承包合同主要指( )。",[276,277,278,279],{"key":20,"text":257,"correct":29},{"key":24,"text":259,"correct":22},{"key":27,"text":261,"correct":22},{"key":31,"text":263,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},1261995,"成本核算是( )。",[284,286,288,290],{"key":20,"text":285,"correct":29},"把生产费用正确地归集到承担的客体",{"key":24,"text":287,"correct":22},"在预测的基础上,以货币的形式编制的在工程施工计划期内的生产费用、成本水平和成本降低率,以及为降低成本采取的主要措施和规范的书面文件",{"key":27,"text":289,"correct":22},"指在施工活动中对影响成本的因素进行加强管理",{"key":31,"text":291,"correct":22},"指在项目管理中对影响成本的因素进行加强管理",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},1261996,"成本计划是( )。",[296,297,298,299],{"key":20,"text":287,"correct":29},{"key":24,"text":285,"correct":22},{"key":27,"text":289,"correct":22},{"key":31,"text":300,"correct":22},"指把费用归集到核算的对象账上",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},1261997,"变动成本是( )。",[305,307,309,311],{"key":20,"text":306,"correct":22},"指在一定期间和一定的工程量范围内,成本额不受工程量增减变动的影响而相对固定的成本",{"key":24,"text":308,"correct":22},"指为施工准备、组织管理施工作业而发生的费用支出,这些设计施工生产必须发生的",{"key":27,"text":310,"correct":22},"施工项目承建所承包工程实际发生的各项生产费用的总和",{"key":31,"text":312,"correct":29},"指成本发生总额随着工程量的增减变动而成正比例变动的费用",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":31,"analysis":33},1261998,"施工成本分类的方法,按生产费用和工程量的关系划分为( )。",[317,319,321,323],{"key":20,"text":318,"correct":22},"抽象成本和实体成本",{"key":24,"text":320,"correct":22},"直接成本和间接成本",{"key":27,"text":322,"correct":22},"预算成本、计划成本和实际成本",{"key":31,"text":324,"correct":29},"固定成本和变动成本",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":27,"analysis":33},1261999,"施工成本分类的方法,按成本发生的时间划分为( )。",[329,330,331,332],{"key":20,"text":318,"correct":22},{"key":24,"text":320,"correct":22},{"key":27,"text":322,"correct":29},{"key":31,"text":324,"correct":22},{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1262001,"预算成本是( )。",[337,339,341,342],{"key":20,"text":338,"correct":29},"又称项目承包成本,其加上项目企业期望利润后,即为项目经理的责任成本目标值",{"key":24,"text":340,"correct":22},"指施工过程中耗费的为构成工程实体或有助于过程工程实体形成的各项费用支出的和",{"key":27,"text":310,"correct":22},{"key":31,"text":343,"correct":22},"项目经理在承包成本扣除预期成本计划降低额后的成本额",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":27,"analysis":33},1262002,"属于间接成本是( )。",[348,350,352,354],{"key":20,"text":349,"correct":22},"人工费",{"key":24,"text":351,"correct":22},"材料费",{"key":27,"text":353,"correct":29},"交通费",{"key":31,"text":355,"correct":22},"施工机械使用费",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1262003,"间接成本是( )。",[360,362,364,365],{"key":20,"text":361,"correct":29},"指为施工准备、组织管理施工作业而发生的费用支出,这些是施工生产必须发生的",{"key":24,"text":363,"correct":22},"指为施工准备、组织管理施工作业而发生的费用收入,这些是施工生产必须发生的",{"key":27,"text":310,"correct":22},{"key":31,"text":366,"correct":22},"施工项目承建所承包工程预计发生的各项生产费用的总和",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":20,"analysis":33},1262004,"实际成本是( )。",[371,372,373,374],{"key":20,"text":310,"correct":29},{"key":24,"text":308,"correct":22},{"key":27,"text":340,"correct":22},{"key":31,"text":366,"correct":22},{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},1262005,"企业管理层是( )。",[379,381,383,385],{"key":20,"text":380,"correct":29},"其管理从投标开始止于结算的全过程,着眼于体现效益中心的管理职能",{"key":24,"text":382,"correct":22},"其管理以企业确定的施工成本为目标,体现现场生产成本控制中心的管理职能",{"key":27,"text":384,"correct":22},"其管理以企业确定的项目成本为目标,体现现场生产成本控制中心的监理职能",{"key":31,"text":386,"correct":22},"其管理从投标开始止于结算的全过程,着眼于体现效益中心的监督职能",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":31,"analysis":33},1262006,"项目管理层是( )。",[391,392,393,394],{"key":20,"text":384,"correct":22},{"key":24,"text":386,"correct":22},{"key":27,"text":380,"correct":22},{"key":31,"text":382,"correct":29},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},1262007,"质量事故的处理方式不包括( )。",[399,401,403,405],{"key":20,"text":400,"correct":22},"返工处理",{"key":24,"text":402,"correct":22},"返修处理",{"key":27,"text":404,"correct":22},"报废处理",{"key":31,"text":406,"correct":29},"形成事故质量报告",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1262008,"质量事故是( )。",[411,413,415,417],{"key":20,"text":412,"correct":29},"由于工程质量不符合标准规定,而引起或造成规定数额以上的经济损失、导致工期严重延误,或造成人身设备安全事故、影响使用功能",{"key":24,"text":414,"correct":22},"施工质量不符合标准规定,直接经济损失也没有超过额度,不影响使用功能和工程结构安全的,也不会有永久性不可弥补损失",{"key":27,"text":416,"correct":22},"施工质量不符合标准规定,直接经济损失也没有超过额度,影响使用功能和工程结构安全的,也不会有永久性不可弥补损失",{"key":31,"text":418,"correct":22},"由于工程质量符合标准规定,而引起或造成规定数额以上的经济损失、导致工期严重延误,或造成人身设备安全事故、影响使用功能",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1262009,"建筑安装工程施工过程中质量检查实行三检制,是指( )。",[423,425,427,429],{"key":20,"text":424,"correct":22},"作业人员的自检和专职质量员的专检、互检相结合的检查制度",{"key":24,"text":426,"correct":29},"作业人员的自检、互检和专职质量员的“专检”相结合的检查制度",{"key":27,"text":428,"correct":22},"作业人员的互检、专检和专职质量员的“自检”相结合的检查制度",{"key":31,"text":430,"correct":22},"作业人员的自检、互检和专检相结合的检查制度",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":31,"analysis":33},1262010,"每一个质量控制具体方法本身也有一个持续改进的课题,就要用( )循环原理,在实践中使质量控制得到不断提高。",[435,437,439,441],{"key":20,"text":436,"correct":22},"看、摸、敲、照四个字",{"key":24,"text":438,"correct":22},"目测法、实测法和试验法三种",{"key":27,"text":440,"correct":22},"靠、吊、量、套四个字",{"key":31,"text":442,"correct":29},"计划、实施、检查和改进",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":27,"analysis":33},1262011,"实测法,实测检查法的手段可归纳为( )。",[447,448,449,450],{"key":20,"text":436,"correct":22},{"key":24,"text":438,"correct":22},{"key":27,"text":440,"correct":29},{"key":31,"text":442,"correct":22},{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":24,"analysis":33},1262012,"现场进行质量检查的方法有( )。",[455,456,458,459],{"key":20,"text":436,"correct":22},{"key":24,"text":457,"correct":29},"目测法、实测法和试验检查三种",{"key":27,"text":440,"correct":22},{"key":31,"text":442,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},1262013,"现场质量检查的内容不包括( )。",[464,466,468,470],{"key":20,"text":465,"correct":22},"开工前检查",{"key":24,"text":467,"correct":22},"工序交接检查",{"key":27,"text":469,"correct":22},"隐蔽工程检查",{"key":31,"text":471,"correct":29},"审核有关技术文件、",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},1262014,"施工项目质量控制主要的方法不包含( )。",[476,478,480,482],{"key":20,"text":477,"correct":22},"审核有关技术文件",{"key":24,"text":479,"correct":22},"报告和直接进行现场检查",{"key":27,"text":481,"correct":22},"必要的试验",{"key":31,"text":465,"correct":29},{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},1262015,"施工现场准备包括( )。",[487,489,491,493],{"key":20,"text":488,"correct":22},"项目扩大初步设计方案的审查,熟悉和审查项目的施工图纸,项目建设地点自然条件、技术经济条件调查分析,编制项目施工图预算和施工预算,编制项目施工组织设计等",{"key":24,"text":490,"correct":29},"控制网、水准点、标桩的测量,五通一平,生产、生活临时设施等准备",{"key":27,"text":492,"correct":22},"建立项目组织机构,集结施工队伍,对施工人员进行入场教育等",{"key":31,"text":494,"correct":22},"建筑材料准备,构配件和制品加工准备,施工机具准备,生产工艺设备的准备等",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},1262016,"组织准备包括( )。",[499,500,501,503],{"key":20,"text":488,"correct":22},{"key":24,"text":492,"correct":29},{"key":27,"text":502,"correct":22},"控制网、水准点、标桩的测量,“五通一平”,生产、生活临时设施等准备",{"key":31,"text":494,"correct":22},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},1262017,"技术准备包括( )。",[508,509,510,511],{"key":20,"text":490,"correct":22},{"key":24,"text":492,"correct":22},{"key":27,"text":494,"correct":22},{"key":31,"text":488,"correct":29},{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1262018,"事中质量控制的策略是( )。",[516,518,520,522],{"key":20,"text":517,"correct":29},"全面控制施工过程,重点控制工序质量",{"key":24,"text":519,"correct":22},"做好施工准备工作,且施工准备工作要贯穿施工全过程中",{"key":27,"text":521,"correct":22},"工序交接有对策",{"key":31,"text":523,"correct":22},"质量文件有档案",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1262019,"事前质量控制指在正式施工前的质量控制,其控制重点是( )。",[528,530,531,532],{"key":20,"text":529,"correct":22},"全面控制施工过程,重点工序质量",{"key":24,"text":519,"correct":29},{"key":27,"text":521,"correct":22},{"key":31,"text":523,"correct":22},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},1262020,"不属于施工项目质量管理的原则( )。",[537,539,541,543],{"key":20,"text":538,"correct":22},"贯彻科学、公正、守法的职业规范",{"key":24,"text":540,"correct":22},"一人为核心,以预防为主",{"key":27,"text":542,"correct":22},"坚持质量标准、严格检查,一切用数据说话",{"key":31,"text":544,"correct":29},"质量易受投资、进度制约",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},1262021,"不属于施工项目质量管理的特点( )。",[549,550,552,554],{"key":20,"text":538,"correct":29},{"key":24,"text":551,"correct":22},"影响质量的因素多",{"key":27,"text":553,"correct":22},"质量检查不能解体、拆卸",{"key":31,"text":555,"correct":22},"易产生第一、第二判断错误",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},1262022,"质量改进是指( )。",[560,562,564,566],{"key":20,"text":561,"correct":29},"致力于增强满足质量要求的能力",{"key":24,"text":563,"correct":22},"致力于满足质量要求",{"key":27,"text":565,"correct":22},"致力于制定质量目标并规定必要的运行工程和相关资源以实现质量目标",{"key":31,"text":567,"correct":22},"致力于提供质量要求会得到满足的信任",[569,572,575,578,581,584],{"id":15,"name":570,"category":7,"favorite":571},"领导干部任职前廉政法规知识测试题",92,{"id":573,"name":574,"category":7,"favorite":15},595,"建筑结构与设备",{"id":576,"name":577,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":579,"name":580,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":582,"name":583,"category":7,"favorite":8},534,"BIM工程师",{"id":585,"name":583,"category":7,"favorite":8},535]