[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-845-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":583},{"id":5,"name":6,"category":7,"favorite":8},845,"设备方向-岗位技能","建筑工程",0,1,50,394,[13,33,45,57,69,81,89,97,109,121,133,145,156,168,177,189,199,210,222,231,243,255,267,279,291,300,312,327,339,351,363,375,387,399,407,419,427,439,451,465,479,491,499,507,519,531,539,551,559,571],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":19,"analysis":32},1261872,"单选题","通风与空调工程的调试和调整主要手段是( )。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","对各类自动或手动的调节阀达到某一个适当的开度,就可满足要求",true,{"key":23,"text":24,"correct":25},"B","对各类自动和手动的调节阀达到50%的开度,就可满足要求",false,{"key":27,"text":28,"correct":25},"C","对各类自动或手动的调节阀达到80%的开度,就可满足要求",{"key":30,"text":31,"correct":25},"D","对各类自动或手动的调节阀达到60%开度,就可满足要求","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":19,"analysis":32},1261873,"通风与空调工程的调试和调整目的是( )。",[37,39,41,43],{"key":19,"text":38,"correct":21},"把系统的每个出口用户的风量、风速、风压及温度和湿度等调整到设计预期值或用户满意值",{"key":23,"text":40,"correct":25},"把系统的每个进口的风量、风速、风压及温度和湿度等调整到设计预期值或用户满意值",{"key":27,"text":42,"correct":25},"把支管每个出口用户的风量、风速、风压及温度和湿度等调整到设计预期值或用户满意值",{"key":30,"text":44,"correct":25},"把支管每个进口的风量、风速、风压及温度和湿度等调整到设计预期值或用户满意值",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},1261874,"材料进场验收是重要一环,目的是( )。",[49,51,53,55],{"key":19,"text":50,"correct":21},"检验材料的质量和数量是否符合材料采购合同的约定,判定是否由于运输原因发生变异",{"key":23,"text":52,"correct":25},"检验材料的质量是否符合材料采购合同的约定,判定是否由于运输原因发生变异",{"key":27,"text":54,"correct":25},"检验材料数量是否符合材料采购合同的约定,判定是否由于运输原因发生变异",{"key":30,"text":56,"correct":25},"检验材料的质量或数量是否符合材料采购合同的约定,判定是否由于运输原因发生变异",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":23,"analysis":32},1261875,"房屋建筑安装工程中排水是( )。",[61,63,65,67],{"key":19,"text":62,"correct":25},"机械流",{"key":23,"text":64,"correct":21},"重力流",{"key":27,"text":66,"correct":25},"动力流",{"key":30,"text":68,"correct":25},"压力流",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":27,"analysis":32},1261876,"施工记录的内容与( )要相符。",[73,75,77,79],{"key":19,"text":74,"correct":25},"有机联系",{"key":23,"text":76,"correct":25},"土建工程之间的交叉配合",{"key":27,"text":78,"correct":21},"目录",{"key":30,"text":80,"correct":25},"分包之间的记录",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":23,"analysis":32},1261877,"安装工程与( )要相符。",[85,86,87,88],{"key":19,"text":74,"correct":25},{"key":23,"text":76,"correct":21},{"key":27,"text":78,"correct":25},{"key":30,"text":80,"correct":25},{"id":90,"libraryId":5,"type":9,"typeLabel":15,"stem":91,"options":92,"answer":19,"analysis":32},1261878,"施工记录间的时间顺序、制约条件和( )要相符。",[93,94,95,96],{"key":19,"text":74,"correct":21},{"key":23,"text":76,"correct":25},{"key":27,"text":78,"correct":25},{"key":30,"text":80,"correct":25},{"id":98,"libraryId":5,"type":9,"typeLabel":15,"stem":99,"options":100,"answer":27,"analysis":32},1261879,"纸质载体记录使用复印纸幅面尺寸,宜为( )幅面。",[101,103,105,107],{"key":19,"text":102,"correct":25},"A2",{"key":23,"text":104,"correct":25},"A3",{"key":27,"text":106,"correct":21},"A4",{"key":30,"text":108,"correct":25},"A5",{"id":110,"libraryId":5,"type":9,"typeLabel":15,"stem":111,"options":112,"answer":27,"analysis":32},1261880,"现行规定脚手架使用的均布荷载不得超过( )N\u002Fm²。",[113,115,117,119],{"key":19,"text":114,"correct":25},"2548",{"key":23,"text":116,"correct":25},"2448",{"key":27,"text":118,"correct":21},"2648",{"key":30,"text":120,"correct":25},"2248",{"id":122,"libraryId":5,"type":9,"typeLabel":15,"stem":123,"options":124,"answer":27,"analysis":32},1261881,"作业场所油漆涂料存放量一般不超过( )天使用量,不得过多存放。",[125,127,129,131],{"key":19,"text":126,"correct":25},"4",{"key":23,"text":128,"correct":25},"3",{"key":27,"text":130,"correct":21},"2",{"key":30,"text":132,"correct":25},"1",{"id":134,"libraryId":5,"type":9,"typeLabel":15,"stem":135,"options":136,"answer":27,"analysis":32},1261882,"试运行期间金属容器内进行抢修工作前,应采取强迫通风方法,使内部温度不超过( )℃,严禁用氧气作为通风的风源。",[137,139,141,143],{"key":19,"text":138,"correct":25},"45",{"key":23,"text":140,"correct":25},"50",{"key":27,"text":142,"correct":21},"40",{"key":30,"text":144,"correct":25},"30",{"id":146,"libraryId":5,"type":9,"typeLabel":15,"stem":147,"options":148,"answer":27,"analysis":32},1261883,"柴油发电机周围( )m内不得使用火炉火喷灯,不得存放易燃物。",[149,151,153,154],{"key":19,"text":150,"correct":25},"6",{"key":23,"text":152,"correct":25},"5",{"key":27,"text":126,"correct":21},{"key":30,"text":155,"correct":25},"7",{"id":157,"libraryId":5,"type":9,"typeLabel":15,"stem":158,"options":159,"answer":27,"analysis":32},1261884,"接地体可用( )角钢。",[160,162,164,166],{"key":19,"text":161,"correct":25},"50×3",{"key":23,"text":163,"correct":25},"60×3",{"key":27,"text":165,"correct":21},"50×5",{"key":30,"text":167,"correct":25},"60×5",{"id":169,"libraryId":5,"type":9,"typeLabel":15,"stem":170,"options":171,"answer":27,"analysis":32},1261885,"外电线路电压为1kV以下，脚手架与外电架空线路的边线之间最小安全操作距离为( )m。",[172,173,174,175],{"key":19,"text":150,"correct":25},{"key":23,"text":152,"correct":25},{"key":27,"text":126,"correct":21},{"key":30,"text":176,"correct":25},"4.5",{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":27,"analysis":32},1261886,"指挥人员的职责与要求,在开始起吊时,应先用微动信号指挥,待负载离开地面( )并稳定后,再用正常速度指挥。",[181,183,185,187],{"key":19,"text":182,"correct":25},"10～30cm",{"key":23,"text":184,"correct":25},"20～40cm",{"key":27,"text":186,"correct":21},"10～20cm",{"key":30,"text":188,"correct":25},"20～30cm",{"id":190,"libraryId":5,"type":9,"typeLabel":15,"stem":191,"options":192,"answer":27,"analysis":32},1261887,"位于车辆行驶通道旁的洞口,盖板应能承受不小于卡车后轮有效承载力( )倍的荷载能力。",[193,194,196,197],{"key":19,"text":128,"correct":25},{"key":23,"text":195,"correct":25},"2.5",{"key":27,"text":130,"correct":21},{"key":30,"text":198,"correct":25},"1.5",{"id":200,"libraryId":5,"type":9,"typeLabel":15,"stem":201,"options":202,"answer":19,"analysis":32},1261888,"深度在( )的桩孔与管道孔洞等边沿上的施工作业属于洞口作业。",[203,205,207,209],{"key":19,"text":204,"correct":21},"2m和2m以下",{"key":23,"text":206,"correct":25},"2m和2m以上",{"key":27,"text":208,"correct":25},"3m和3m以下",{"key":30,"text":206,"correct":25},{"id":211,"libraryId":5,"type":9,"typeLabel":15,"stem":212,"options":213,"answer":23,"analysis":32},1261889,"高度超过( )m的建筑物的周边,当无外脚手架时,应在外围边沿架设一道安全平网。",[214,216,218,220],{"key":19,"text":215,"correct":25},"2.3",{"key":23,"text":217,"correct":21},"3.2",{"key":27,"text":219,"correct":25},"2.4",{"key":30,"text":221,"correct":25},"2.1",{"id":223,"libraryId":5,"type":9,"typeLabel":15,"stem":224,"options":225,"answer":27,"analysis":32},1261890,"( )级以上大风、大雾、大雨和大雪天气应暂停在脚手架上作业。",[226,228,229,230],{"key":19,"text":227,"correct":25},"8",{"key":23,"text":155,"correct":25},{"key":27,"text":150,"correct":21},{"key":30,"text":152,"correct":25},{"id":232,"libraryId":5,"type":9,"typeLabel":15,"stem":233,"options":234,"answer":19,"analysis":32},1261891,"重荷载脚手架、施工荷载显著偏于一侧的脚手架和高度超过( )m的脚手架必须进行设计和计算。",[235,237,239,241],{"key":19,"text":236,"correct":21},"15",{"key":23,"text":238,"correct":25},"10",{"key":27,"text":240,"correct":25},"20",{"key":30,"text":242,"correct":25},"23",{"id":244,"libraryId":5,"type":9,"typeLabel":15,"stem":245,"options":246,"answer":27,"analysis":32},1261892,"安全检查应注意将互查与自查有机结合起来,坚持检查和整改相结合,关注建立安全生产档案资料的收集,( )是基础。",[247,249,251,253],{"key":19,"text":248,"correct":25},"常抓不懈",{"key":23,"text":250,"correct":25},"贯彻落实责任",{"key":27,"text":252,"correct":21},"强化管理",{"key":30,"text":254,"correct":25},"以人为本",{"id":256,"libraryId":5,"type":9,"typeLabel":15,"stem":257,"options":258,"answer":27,"analysis":32},1261893,"单机试运转要编制专门方案,明确分工,要有意外发生的( )。",[259,261,263,265],{"key":19,"text":260,"correct":25},"防范措施",{"key":23,"text":262,"correct":25},"应急预案",{"key":27,"text":264,"correct":21},"防范措施和应急预案",{"key":30,"text":266,"correct":25},"保护措施",{"id":268,"libraryId":5,"type":9,"typeLabel":15,"stem":269,"options":270,"answer":19,"analysis":32},1261894,"( )要向本队组员工结合作业情况进行安全交底。",[271,273,275,277],{"key":19,"text":272,"correct":21},"作业队组长",{"key":23,"text":274,"correct":25},"项目经理",{"key":27,"text":276,"correct":25},"工程监理",{"key":30,"text":278,"correct":25},"质量员",{"id":280,"libraryId":5,"type":9,"typeLabel":15,"stem":281,"options":282,"answer":19,"analysis":32},1261895,"( ),由项目部技术负责人向全体员工进行交底。",[283,285,287,289],{"key":19,"text":284,"correct":21},"工程项目开工前",{"key":23,"text":286,"correct":25},"工程项目开工后",{"key":27,"text":288,"correct":25},"单位施工开工前",{"key":30,"text":290,"correct":25},"单位施工开工后",{"id":292,"libraryId":5,"type":9,"typeLabel":15,"stem":293,"options":294,"answer":19,"analysis":32},1261896,"首层两处检验两股充实水柱同时达到消火栓应到的最远点的能力,充实水柱一般取为( )m。",[295,296,297,298],{"key":19,"text":238,"correct":21},{"key":23,"text":236,"correct":25},{"key":27,"text":240,"correct":25},{"key":30,"text":299,"correct":25},"25",{"id":301,"libraryId":5,"type":9,"typeLabel":15,"stem":302,"options":303,"answer":23,"analysis":32},1261897,"做好玻璃钢风管的成品保护,属于( )。",[304,306,308,310],{"key":19,"text":305,"correct":25},"事前阶段质量控制",{"key":23,"text":307,"correct":21},"事中阶段质量控制",{"key":27,"text":309,"correct":25},"事后阶段质量控制",{"key":30,"text":311,"correct":25},"事前阶段管理控制",{"id":313,"libraryId":5,"type":9,"typeLabel":15,"stem":314,"options":315,"answer":30,"analysis":32},1261898,"案例15-2:",[316,318,320,322,324],{"key":19,"text":317,"correct":25},"司承建一住宅楼群的机电安装工程,楼群坐落于一个大型公共地下车库上面。工程完工投入使用,情况良好,机电安装工程尤其是地下车库部分被行业协会授予样板工程超,为省内外同行参观学习的场所。项目部负责人主要介绍了地下车库的施工经验,包括编制切实可行的施工组织设计、进行深化设计,对给水排水、消防、电气、智能化、通风等各专业的工程实体按施工图要求作统一布排安装位置和标高,严格材料采购.加强材料进场验收,所有作业人员上岗前进行业务培训,并到样板室参观作业,采用先进仪器设备定位,合理安排与其他上岗定位的衔接,加强产品保护,避免发生作业中对已安装好产品的污染或移位,施工员、质量员实现每天三次巡视作业,及时处理发现的问题,用静态试验和动态考核项结合的方法把好最终检验关等。这些做法获得参观者的认同和好评。案例15-2项目部在____对工程质量进行了有效控制。",{"key":23,"text":319,"correct":25},"事前",{"key":27,"text":321,"correct":25},"事中",{"key":30,"text":323,"correct":21},"事后",{"key":325,"text":326,"correct":25},"E","事前、事中、事后三个阶段都",{"id":328,"libraryId":5,"type":9,"typeLabel":15,"stem":329,"options":330,"answer":23,"analysis":32},1261899,"施工过程发生设计更变信息传递中断而造成质量问题,应属于( )。",[331,333,335,337],{"key":19,"text":332,"correct":25},"事前质量控制失效",{"key":23,"text":334,"correct":21},"事中质量控制失效",{"key":27,"text":336,"correct":25},"事后质量控制失效",{"key":30,"text":338,"correct":25},"事前管理控制失效",{"id":340,"libraryId":5,"type":9,"typeLabel":15,"stem":341,"options":342,"answer":27,"analysis":32},1261900,"质量员发现的管道承重支架有较大的质量缺陷是处于施工高峰期,应属于( )。",[343,345,347,349],{"key":19,"text":344,"correct":25},"事前阶段的质量控制",{"key":23,"text":346,"correct":25},"事后阶段的质量控制",{"key":27,"text":348,"correct":21},"事中阶段的质量控制",{"key":30,"text":350,"correct":25},"施工阶段的质量控制",{"id":352,"libraryId":5,"type":9,"typeLabel":15,"stem":353,"options":354,"answer":27,"analysis":32},1261901,"给水排水立管留洞位置失准属于( )阶段的控制失效。",[355,357,359,361],{"key":19,"text":356,"correct":25},"施工准备阶段的前期",{"key":23,"text":358,"correct":25},"施工准备阶段的中期",{"key":27,"text":360,"correct":21},"施工准备阶段的后期",{"key":30,"text":362,"correct":25},"施工准备阶段的之前",{"id":364,"libraryId":5,"type":9,"typeLabel":15,"stem":365,"options":366,"answer":19,"analysis":32},1261902,"质量员发现抱箍构造不合理,为验证构造不合理会导致抱箍功能失效的检查方法要用( )。",[367,369,371,373],{"key":19,"text":368,"correct":21},"实测法",{"key":23,"text":370,"correct":25},"目测法",{"key":27,"text":372,"correct":25},"试验法",{"key":30,"text":374,"correct":25},"检测法",{"id":376,"libraryId":5,"type":9,"typeLabel":15,"stem":377,"options":378,"answer":27,"analysis":32},1261903,"检查工序活动的结果,一旦发现问题,应采取的措施( )。",[379,381,383,385],{"key":19,"text":380,"correct":25},"继续作业活动,在作业过程中解决问题",{"key":23,"text":382,"correct":25},"无视问题,继续作业活动",{"key":27,"text":384,"correct":21},"停止作业活动进行处理,直到符合要求",{"key":30,"text":386,"correct":25},"停止作业活动进行处理,不做任何处理",{"id":388,"libraryId":5,"type":9,"typeLabel":15,"stem":389,"options":390,"answer":19,"analysis":32},1261904,"中标后、开工前项目部关键是( )。",[391,393,395,397],{"key":19,"text":392,"correct":21},"工程质量目标的实现",{"key":23,"text":394,"correct":25},"编制实施的施工组织设计",{"key":27,"text":396,"correct":25},"使进度、质量、成本和安全的各项指标能实现",{"key":30,"text":398,"correct":25},"确定质量目标",{"id":400,"libraryId":5,"type":9,"typeLabel":15,"stem":401,"options":402,"answer":23,"analysis":32},1261905,"中标后、开工前项目部首先要做的是( )。",[403,404,405,406],{"key":19,"text":392,"correct":25},{"key":23,"text":394,"correct":21},{"key":27,"text":396,"correct":25},{"key":30,"text":398,"correct":25},{"id":408,"libraryId":5,"type":9,"typeLabel":15,"stem":409,"options":410,"answer":19,"analysis":32},1261906,"大规格风管是指矩形风管边长大于( )mm的。",[411,413,415,417],{"key":19,"text":412,"correct":21},"2500",{"key":23,"text":414,"correct":25},"2400",{"key":27,"text":416,"correct":25},"2000",{"key":30,"text":418,"correct":25},"1500",{"id":420,"libraryId":5,"type":9,"typeLabel":15,"stem":421,"options":422,"answer":19,"analysis":32},1261907,"大规格风管是指圆形风管直径大于( )mm的。",[423,424,425,426],{"key":19,"text":412,"correct":21},{"key":23,"text":414,"correct":25},{"key":27,"text":416,"correct":25},{"key":30,"text":418,"correct":25},{"id":428,"libraryId":5,"type":9,"typeLabel":15,"stem":429,"options":430,"answer":30,"analysis":32},1261908,"费用定额的规定,没有( )特点,要注意时效的变化。",[431,433,435,437],{"key":19,"text":432,"correct":25},"地方性",{"key":23,"text":434,"correct":25},"变异性",{"key":27,"text":436,"correct":25},"政策性",{"key":30,"text":438,"correct":21},"片面性",{"id":440,"libraryId":5,"type":9,"typeLabel":15,"stem":441,"options":442,"answer":23,"analysis":32},1261909,"施工过程中大量的设计变更仍需采用( ),否则会对竣工结算造成影响。",[443,445,447,449],{"key":19,"text":444,"correct":25},"任一计取工程量",{"key":23,"text":446,"correct":21},"人工计取工程量",{"key":27,"text":448,"correct":25},"计算机计取工程量",{"key":30,"text":450,"correct":25},"混合计取工程量",{"id":452,"libraryId":5,"type":9,"typeLabel":15,"stem":453,"options":454,"answer":19,"analysis":32},1261910,"案例13-3:",[455,457,459,461,463],{"key":19,"text":456,"correct":21},"司承建的某行政大楼的机电安装工程,其中通风与空调工程已进入调试阶段。空调工程要调整各房间风量、风速、温度、湿度和噪声等各项指标。由于系统多、工作量较大,防排烟工程主要在主楼有电梯的建筑部分,防排烟工程要经调试和消防功能验收,系统相对较少。调试要求各场所的风压值符合规定,风压的分布规律符合要求,项目部依据业主与公安消防机构约定的日期安排了防排烟工程调试的作业进度计划。项目部考虑其系统较少,安排专业施工员负责通风空调工程的调试,作业队长负责防排烟系统调试。由于作业队长对防排烟系统在理论上对工艺不够熟悉,尤其对诸多调节阀的功能和作用知之甚少,在进度计划实施后,指挥失当、调节效果不大,规定指标较难实现。因而作业进度缓慢,出现较大偏差,距离验收日期日益临近,施工员发现后进行了调整,预计不能按期完成。发生进度偏差的主要因素是____。",{"key":23,"text":458,"correct":25},"在项目内部,属于项目管理不当",{"key":27,"text":460,"correct":25},"作业队长不熟悉工艺要求造成的",{"key":30,"text":462,"correct":25},"项目外部的影响因素",{"key":325,"text":464,"correct":25},"供货商供货质量发生差异",{"id":466,"libraryId":5,"type":9,"typeLabel":15,"stem":467,"options":468,"answer":19,"analysis":32},1261911,"案例13-2:",[469,471,473,475,477],{"key":19,"text":470,"correct":21},"司承建一幢高层建筑商住楼的机电安装工程,其中建筑电气工程的导管埋设和电缆桥架及线槽敷设均已到位,因而安排月度作业计划时突出了两个可平行作业的分项工程,即管内穿线和桥架内电缆敷设,由两个作业队分别进行,工作面互不干扰,人员配备相当,测量估计各要用20天方可完成。实施计划前,送检的电线质量检测报告通知,电线质量不符规定,要向供货商退货,更换合格的产品,为此B公司项目部调整了施工作业进度计划。这种影响进度计划实施的因素主要是____。",{"key":23,"text":472,"correct":25},"供应商违约,违背采购合同对产品供应质量的约定",{"key":27,"text":474,"correct":25},"施工方造成的问题",{"key":30,"text":476,"correct":25},"自然因素导致施工延迟",{"key":325,"text":478,"correct":25},"供应商与施工方没有商议好",{"id":480,"libraryId":5,"type":9,"typeLabel":15,"stem":481,"options":482,"answer":19,"analysis":32},1261912,"应急调度是指( )。",[483,485,487,489],{"key":19,"text":484,"correct":21},"发现进度计划执行发生偏差先兆或已发生偏差,采用对生产资源分配进行调整",{"key":23,"text":486,"correct":25},"进入单位工程的生产资源是按进度计划供给的",{"key":27,"text":488,"correct":25},"按预期方案将资源在各专业间合理分配",{"key":30,"text":490,"correct":25},"消除进度偏差",{"id":492,"libraryId":5,"type":9,"typeLabel":15,"stem":493,"options":494,"answer":27,"analysis":32},1261913,"正常调度的作用是( )。",[495,496,497,498],{"key":19,"text":484,"correct":25},{"key":23,"text":486,"correct":25},{"key":27,"text":488,"correct":21},{"key":30,"text":490,"correct":25},{"id":500,"libraryId":5,"type":9,"typeLabel":15,"stem":501,"options":502,"answer":23,"analysis":32},1261914,"正常调度是指( )。",[503,504,505,506],{"key":19,"text":484,"correct":25},{"key":23,"text":486,"correct":21},{"key":27,"text":488,"correct":25},{"key":30,"text":490,"correct":25},{"id":508,"libraryId":5,"type":9,"typeLabel":15,"stem":509,"options":510,"answer":19,"analysis":32},1261915,"为保证进度计划顺利实施,企业将采取的( )同时作出说明,以求取得共识。",[511,513,515,517],{"key":19,"text":512,"correct":21},"经济措施和组织措施",{"key":23,"text":514,"correct":25},"技术措施和组织措施",{"key":27,"text":516,"correct":25},"经济措施和技术措施",{"key":30,"text":518,"correct":25},"管理措施和组织措施",{"id":520,"libraryId":5,"type":9,"typeLabel":15,"stem":521,"options":522,"answer":19,"analysis":32},1261916,"施工进度计划的执行是( )的物质保证。",[523,525,527,529],{"key":19,"text":524,"correct":21},"施工进度计划实施",{"key":23,"text":526,"correct":25},"编制生产资源供给计划",{"key":27,"text":528,"correct":25},"资源供给计划实施",{"key":30,"text":530,"correct":25},"编制资源管理计划",{"id":532,"libraryId":5,"type":9,"typeLabel":15,"stem":533,"options":534,"answer":23,"analysis":32},1261917,"施工进度计划确定后,是( )的依据。",[535,536,537,538],{"key":19,"text":524,"correct":25},{"key":23,"text":526,"correct":21},{"key":27,"text":528,"correct":25},{"key":30,"text":530,"correct":25},{"id":540,"libraryId":5,"type":9,"typeLabel":15,"stem":541,"options":542,"answer":19,"analysis":32},1261918,"( )是编制同期的各种生产资源需要量计划的重要依据。",[543,545,547,549],{"key":19,"text":544,"correct":21},"编制好的施工进度计划",{"key":23,"text":546,"correct":25},"施工过程的各项措施",{"key":27,"text":548,"correct":25},"施工进度的控制",{"key":30,"text":550,"correct":25},"施工进度计划的编制、实施和控制",{"id":552,"libraryId":5,"type":9,"typeLabel":15,"stem":553,"options":554,"answer":30,"analysis":32},1261919,"( )在施工活动的全部管理工作中属于首位的。",[555,556,557,558],{"key":19,"text":544,"correct":25},{"key":23,"text":546,"correct":25},{"key":27,"text":548,"correct":25},{"key":30,"text":550,"correct":21},{"id":560,"libraryId":5,"type":9,"typeLabel":15,"stem":561,"options":562,"answer":19,"analysis":32},1261920,"接闪器安装要排在( )。",[563,565,567,569],{"key":19,"text":564,"correct":21},"最末端",{"key":23,"text":566,"correct":25},"最前端",{"key":27,"text":568,"correct":25},"中间",{"key":30,"text":570,"correct":25},"任何位置",{"id":572,"libraryId":5,"type":9,"typeLabel":15,"stem":573,"options":574,"answer":19,"analysis":32},1261921,"如施工中某段管子需隐蔽的,则该段管子应先进行( )。",[575,577,579,581],{"key":19,"text":576,"correct":21},"灌水试验和通球试验",{"key":23,"text":578,"correct":25},"通气试验和通球试验",{"key":27,"text":580,"correct":25},"灌水试验和通气试验",{"key":30,"text":582,"correct":25},"密闭试验和通球试验",[584,587,590,593,596,599],{"id":9,"name":585,"category":7,"favorite":586},"领导干部任职前廉政法规知识测试题",92,{"id":588,"name":589,"category":7,"favorite":9},595,"建筑结构与设备",{"id":591,"name":592,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":594,"name":595,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":597,"name":598,"category":7,"favorite":8},534,"BIM工程师",{"id":600,"name":598,"category":7,"favorite":8},535]