[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262159":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1262159,845,2,"多选题","施工准备计划包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","技术准备",true,{"key":16,"text":17,"correct":14},"B","物资准备",{"key":19,"text":20,"correct":14},"C","劳动组织准备",{"key":22,"text":23,"correct":14},"D","施工现场准备",{"key":25,"text":26,"correct":27},"E","施工技术准备",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"设备方向-岗位技能","建筑工程",0]