[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262084":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1262084,845,2,"多选题","确定质量控制点的基础有( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","按掌握的基础知识,区分各专业的施工工艺流程",true,{"key":16,"text":17,"correct":14},"B","熟悉工艺技术规律,熟悉依次作业顺序,能区分可并行工作的作业活动",{"key":19,"text":20,"correct":14},"C","能进行工序质量控制,明确控制的内容和重点",{"key":22,"text":23,"correct":24},"D","编制施工组织计划或质量计划",false,{"key":26,"text":27,"correct":24},"E","在企业通过认证的质量管理体系的基础上结合本项目实际情况,分析质量控刽程序等有关资料是否需要补充和完善","ABC","",{"id":6,"name":31,"category":32,"favorite":33},"设备方向-岗位技能","建筑工程",0]