[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262073":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1262073,845,2,"多选题","通风与空调工程施工试验类记录有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","风管的密闭性试验",false,{"key":16,"text":17,"correct":18},"B","整个系统联合调试和试运行试验",true,{"key":20,"text":21,"correct":14},"C","单体双机的措施试验",{"key":23,"text":24,"correct":14},"D","单体混合机的措施试验",{"key":26,"text":27,"correct":18},"E","单体单机的措施试验","BE","",{"id":6,"name":31,"category":32,"favorite":33},"设备方向-岗位技能","建筑工程",0]