[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262016":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1262016,845,1,"单选题","组织准备包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目扩大初步设计方案的审查,熟悉和审查项目的施工图纸,项目建设地点自然条件、技术经济条件调查分析,编制项目施工图预算和施工预算,编制项目施工组织设计等",false,{"key":16,"text":17,"correct":18},"B","建立项目组织机构,集结施工队伍,对施工人员进行入场教育等",true,{"key":20,"text":21,"correct":14},"C","控制网、水准点、标桩的测量,“五通一平”,生产、生活临时设施等准备",{"key":23,"text":24,"correct":14},"D","建筑材料准备,构配件和制品加工准备,施工机具准备,生产工艺设备的准备等","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]