[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262005":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1262005,845,1,"单选题","企业管理层是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","其管理从投标开始止于结算的全过程,着眼于体现效益中心的管理职能",true,{"key":16,"text":17,"correct":18},"B","其管理以企业确定的施工成本为目标,体现现场生产成本控制中心的管理职能",false,{"key":20,"text":21,"correct":18},"C","其管理以企业确定的项目成本为目标,体现现场生产成本控制中心的监理职能",{"key":23,"text":24,"correct":18},"D","其管理从投标开始止于结算的全过程,着眼于体现效益中心的监督职能","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]