[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261995":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1261995,845,1,"单选题","成本核算是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","把生产费用正确地归集到承担的客体",true,{"key":16,"text":17,"correct":18},"B","在预测的基础上,以货币的形式编制的在工程施工计划期内的生产费用、成本水平和成本降低率,以及为降低成本采取的主要措施和规范的书面文件",false,{"key":20,"text":21,"correct":18},"C","指在施工活动中对影响成本的因素进行加强管理",{"key":23,"text":24,"correct":18},"D","指在项目管理中对影响成本的因素进行加强管理","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]