[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261970":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1261970,845,1,"单选题","对施工方案的比较的方法,属于经济性比较的是:( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","比较不同方案实施的安全可靠性",true,{"key":16,"text":17,"correct":18},"B","比较不同方案的经济计划性",false,{"key":20,"text":21,"correct":18},"C","比较不同方案推广应用的价值",{"key":23,"text":24,"correct":18},"D","比较不同方案对施工产值增长率的贡献","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]