[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261918":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1261918,845,1,"单选题","( )是编制同期的各种生产资源需要量计划的重要依据。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","编制好的施工进度计划",true,{"key":16,"text":17,"correct":18},"B","施工过程的各项措施",false,{"key":20,"text":21,"correct":18},"C","施工进度的控制",{"key":23,"text":24,"correct":18},"D","施工进度计划的编制、实施和控制","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]