[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261895":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1261895,845,1,"单选题","( ),由项目部技术负责人向全体员工进行交底。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程项目开工前",true,{"key":16,"text":17,"correct":18},"B","工程项目开工后",false,{"key":20,"text":21,"correct":18},"C","单位施工开工前",{"key":23,"text":24,"correct":18},"D","单位施工开工后","",{"id":6,"name":27,"category":28,"favorite":29},"设备方向-岗位技能","建筑工程",0]