[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":577},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,9,50,1193,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,213,224,236,248,260,272,284,296,308,320,330,342,354,363,372,384,395,403,415,427,439,451,462,474,486,498,510,522,534,543,553,559,565,571],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1261073,1,"单选题","施工成本控制的正确工作步骤是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","预测一比较一分析一检查一纠偏",false,{"key":24,"text":25,"correct":26},"B","预测一分析一比较一检查一纠偏",true,{"key":28,"text":29,"correct":22},"C","检查一比较一分析一预测一纠偏",{"key":31,"text":32,"correct":22},"D","比较一分析一预测一纠偏一检查","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1261074,"项目成本核算的核心任务是项目的（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"组织协调",{"key":24,"text":41,"correct":26},"目标控制",{"key":28,"text":43,"correct":22},"合同管理",{"key":31,"text":45,"correct":22},"风险管理",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1261075,"成本决策的决策是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"成本预测",{"key":24,"text":53,"correct":22},"成本计划",{"key":28,"text":55,"correct":22},"成本分析",{"key":31,"text":57,"correct":22},"成本控制",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1261076,"关于工程成本描述正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"指施工企业或项目部为取得并完成某项工程所支付的各种费用的总和",{"key":24,"text":65,"correct":22},"合同价",{"key":28,"text":67,"correct":22},"发包方应付的除利润以外的工程款",{"key":31,"text":69,"correct":22},"发包方应付的除利润、税金以外的工程款",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1261077,"施工成本预测的工作是在施工项目（ ）进行。",[74,76,78,80],{"key":20,"text":75,"correct":26},"施工以前",{"key":24,"text":77,"correct":22},"施工前期",{"key":28,"text":79,"correct":22},"施工中期",{"key":31,"text":81,"correct":22},"施工后期",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1261078,"对于分包工程，在签订经济合同的时候，特别要坚持“以施工图预算控制合同金额”的原则，绝不允许（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"合同金额超过施工图预算",{"key":24,"text":89,"correct":22},"施工图预算超过合同金额",{"key":28,"text":91,"correct":22},"合同金额超过施工预算",{"key":31,"text":93,"correct":22},"施工预算超过合同金额",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1261079,"在成本形成过程中，对施工项目成本进行的对比评价和总结工作，称为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"施工成本控制",{"key":24,"text":101,"correct":22},"施工成本计划",{"key":28,"text":103,"correct":22},"施工成本管理",{"key":31,"text":105,"correct":26},"施工成本分析",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1261080,"工程成本是指（ ）为取得并完成某项工程所支付的各种费用的总和。",[110,112,114,116],{"key":20,"text":111,"correct":22},"施工队伍",{"key":24,"text":113,"correct":26},"施工企业",{"key":28,"text":115,"correct":22},"建设单位",{"key":31,"text":117,"correct":22},"项目经理",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1261081,"施工措施费目标成本的编制，以施工图预算其他直接费为收人依据，按施工方案和施工现场条件，预计（ ）、场地清理费、检验试验费、生产工具用具费、标准化与文明施工等发生的各项费用。",[122,124,126,128],{"key":20,"text":123,"correct":22},"二次搬运费",{"key":24,"text":125,"correct":22},"现场水电费",{"key":28,"text":127,"correct":22},"场地租借费",{"key":31,"text":129,"correct":26},"ABC",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1261082,"施工项目总成本降低率是指成本计划的（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"数量指标",{"key":24,"text":137,"correct":26},"质量指标",{"key":28,"text":139,"correct":22},"效益指标",{"key":31,"text":141,"correct":22},"成本指标",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1261083,"在施工项目目标责任成本的控制划分责任中形成三级责任中心，即班组责任中心、项目经理部责任中心、公司责任中心。其中公司责任中心负责控制的成本属于（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"制造成本",{"key":24,"text":149,"correct":22},"使用成本",{"key":28,"text":151,"correct":22},"责任成本",{"key":31,"text":153,"correct":26},"目标责任成本",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1261084,"横道值法具有形象、直观、一目了然等优点，它能过准确表达出费用的（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"统计偏差",{"key":24,"text":161,"correct":22},"平均偏差",{"key":28,"text":163,"correct":26},"绝对偏差",{"key":31,"text":165,"correct":22},"相对偏差",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1261085,"进度控制的目的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"通过控制以实现工程的进度目标",{"key":24,"text":173,"correct":22},"进度计划的编制",{"key":28,"text":175,"correct":22},"论证进度目标是否合理",{"key":31,"text":177,"correct":22},"跟踪检查进度计划",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1261086,"施工成本管理的目的是利用组织、经济、技术和合同等措施（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"全面分析实际成本的变动状态",{"key":24,"text":185,"correct":26},"将实际成本控制在计划范围内",{"key":28,"text":187,"correct":22},"严格控制计划成本的变动范围",{"key":31,"text":189,"correct":22},"把计划成本控制在目标范围内",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1261087,"理想的项目成本管理结果应该是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"承包成本>计划成本>实际成本",{"key":24,"text":197,"correct":22},"计划成本>承包成本>实际成本",{"key":28,"text":199,"correct":22},"计划成本>实际成本>承包成本",{"key":31,"text":201,"correct":22},"承包成本>实际成本>计划成本",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1261088,"施工项目成本是施工项目在施工中所发生的全部（ ）的总和。",[206,208,210,212],{"key":20,"text":207,"correct":22},"管理费用",{"key":24,"text":209,"correct":22},"建设费用",{"key":28,"text":211,"correct":22},"生产费用",{"key":31,"text":129,"correct":26},{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},1261089,"施工项目的成本管理的最终目标是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"低成本",{"key":24,"text":220,"correct":22},"高质量",{"key":28,"text":222,"correct":22},"短工期",{"key":31,"text":129,"correct":26},{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1261090,"在施工成本控制的步骤中，控制工作的核心是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"预测估计完成项目所需的总费用",{"key":24,"text":231,"correct":26},"分析比较结果以确定偏差的严重性和原因",{"key":28,"text":233,"correct":22},"采取适当措施纠偏",{"key":31,"text":235,"correct":22},"检查纠偏措施的执行情况",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},1261091,"施工成本控制过程中的动态资料是（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"合同文件和工程变更资料",{"key":24,"text":243,"correct":22},"工程索赔资料和成本计划",{"key":28,"text":245,"correct":22},"合同文件和成本计划",{"key":31,"text":247,"correct":26},"进度报告和工程变更资料",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},1261092,"关于工程量清单的计价模式的特点描述正确的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"按清单计价的模式",{"key":24,"text":255,"correct":22},"量价合一的模式",{"key":28,"text":257,"correct":26},"量价分离的模式",{"key":31,"text":259,"correct":22},"自主报价的模式",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},1261093,"偏差分析可采用不同的方法，不能进行偏差分析的方法是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"横道图法",{"key":24,"text":267,"correct":22},"表格法",{"key":28,"text":269,"correct":22},"赢得值评价曲线法",{"key":31,"text":271,"correct":26},"对比法",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1261094,"施工成本偏差分析可采用不同的表达方法，常用的有（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":26},"横道图法、表格法、和赢得值评价曲线法",{"key":24,"text":279,"correct":22},"网络图法、横道图法和表格法",{"key":28,"text":281,"correct":22},"比较法、因素分析法和差额计算法",{"key":31,"text":283,"correct":22},"网络图法、表格法和赢得值评价曲线法",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},1261095,"项目经理部对作业队分包成本的控制，不包括（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"作业队成本的节约或超支",{"key":24,"text":291,"correct":22},"工程量和劳动定额的控制",{"key":28,"text":293,"correct":22},"钟点工的控制",{"key":31,"text":295,"correct":26},"对作业队的奖罚",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},1261096,"项目经理部对竣工工程成本核算的目的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":26},"考核项目管理绩效",{"key":24,"text":303,"correct":22},"寻求进一步降低成本的途径",{"key":28,"text":305,"correct":22},"考核企业经营效益",{"key":31,"text":307,"correct":22},"分析成本偏差的原因",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},1261097,"作为施工企业全面成本管理的重要环节，施工项目成本控制应贯穿于项目（ ）的全过程。",[312,314,316,318],{"key":20,"text":313,"correct":22},"从策划开始到项目开始运营",{"key":24,"text":315,"correct":22},"从设计开始到项目开始运营",{"key":28,"text":317,"correct":26},"从投标开始到项目竣工验收",{"key":31,"text":319,"correct":22},"从施工开始到项目竣工验收",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},1261098,"（ ）就是根据成本信息和施工项目的具体情况，运用一定的专门方法，对未来的成本水平及其可能发展趋势做出科学的估计。",[324,326,327,328],{"key":20,"text":325,"correct":26},"施工成本预测",{"key":24,"text":101,"correct":22},{"key":28,"text":99,"correct":22},{"key":31,"text":329,"correct":22},"施工成本核算",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":28,"analysis":33},1261099,"在实施施工成本管理的多项措施中，分解施工成本管理目标、进行风险分析和偏差原因分析是施工成本管理的（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"组织措施",{"key":24,"text":337,"correct":22},"技术措施",{"key":28,"text":339,"correct":26},"经济措施",{"key":31,"text":341,"correct":22},"合同措施",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":28,"analysis":33},1261100,"不用进行工料调差的计价方法为（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"单价法",{"key":24,"text":349,"correct":22},"综合单价法",{"key":28,"text":351,"correct":26},"实物法",{"key":31,"text":353,"correct":22},"按市场价",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},1261101,"会议是进度控制的（ ）。",[358,360,361,362],{"key":20,"text":359,"correct":22},"管理措施",{"key":24,"text":337,"correct":22},{"key":28,"text":335,"correct":26},{"key":31,"text":339,"correct":22},{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":28,"analysis":33},1261102,"施工成本分析是在（ ）的基础上，对成本的形成过程和影响因素进行分析。",[367,368,369,370],{"key":20,"text":101,"correct":22},{"key":24,"text":325,"correct":22},{"key":28,"text":329,"correct":26},{"key":31,"text":371,"correct":22},"施工成本考核",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":31,"analysis":33},1261103,"施工成本计划的指标应经过科学的分析预测确定，可以采用对比法，（ ）等方法来进行测定。",[376,378,380,382],{"key":20,"text":377,"correct":22},"比较法",{"key":24,"text":379,"correct":22},"说明法",{"key":28,"text":381,"correct":22},"实例分析法",{"key":31,"text":383,"correct":26},"因素分析法",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":28,"analysis":33},1261104,"项目管理的核心任务是项目的（ ）。",[388,390,392,393],{"key":20,"text":389,"correct":22},"质量控制",{"key":24,"text":391,"correct":22},"进度控制",{"key":28,"text":41,"correct":26},{"key":31,"text":394,"correct":22},"投资控制",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},1261105,"衡量成本降低的实际成果，并对成本指标完成情况进行总结和评价的是（ ）。",[399,400,401,402],{"key":20,"text":371,"correct":26},{"key":24,"text":101,"correct":22},{"key":28,"text":325,"correct":22},{"key":31,"text":329,"correct":22},{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},1261106,"施工成本分析是施工成本管理的主要任务之一，下列关于施工成本分析的表述中正确的是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"施工成本分析的实质是在施工之前对成本进行估算",{"key":24,"text":410,"correct":22},"施工成本分析是指科学的预测成本水平及其发展趋势",{"key":28,"text":412,"correct":22},"施工成本分析是指预测成本控制的薄弱环节",{"key":31,"text":414,"correct":26},"施工成本分析应贯穿于施工成本管理的全过程",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1261107,"下列选项中，不属于施工成本计划指标的是（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"成本计划的质量指标",{"key":24,"text":422,"correct":22},"成本计划的效益指标",{"key":28,"text":424,"correct":22},"成本计划的数量指标",{"key":31,"text":426,"correct":26},"成本计划的功能指标",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1261108,"（ ）是把企业生产经营发生的一切费用全部吸收到产品成本之中。",[431,433,435,437],{"key":20,"text":432,"correct":22},"制造成本法",{"key":24,"text":434,"correct":26},"完全成本法",{"key":28,"text":436,"correct":22},"不完全成本法",{"key":31,"text":438,"correct":22},"经营成本法",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},1261109,"施工成本计划应满足的要求不包括（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"以经济合理的项目实施方案为基础的要求",{"key":24,"text":446,"correct":22},"合同规定的项目质量和工期要求",{"key":28,"text":448,"correct":26},"控制影响效率的其他因素的要求",{"key":31,"text":450,"correct":22},"有关定额及市场价格的要求",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},1261110,"施工成本控制是指在施工过程中，采取各种有效措施，将施工中实际发生的各种消耗和支出严格控制在（ ）范围内。",[455,457,459,460],{"key":20,"text":456,"correct":22},"施工预算",{"key":24,"text":458,"correct":22},"施工图预算",{"key":28,"text":53,"correct":26},{"key":31,"text":461,"correct":22},"成本预算",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1261111,"施工成本计划通常有三类指标,即（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"拟定工作预算成本指标,已完成工作预算成本指标和成本降低率指标",{"key":24,"text":469,"correct":26},"成本计划的数量指标,质量指标和效益指标",{"key":28,"text":471,"correct":22},"预算成本指标,计划成本指标和实际成本指标",{"key":31,"text":473,"correct":22},"人、财、物成本指标",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},1261112,"分包成本的目标成本的编制，以预算部门提供的分包项目施工图预算为收人依据，按施工预算编制的分包项目施工预算的工程量，单价按（ ），计算分包项目的目标成本。",[478,480,482,484],{"key":20,"text":479,"correct":22},"指导价",{"key":24,"text":481,"correct":22},"市场价",{"key":28,"text":483,"correct":22},"合同约定的下浮率",{"key":31,"text":485,"correct":26},"定额站提供的中准价",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},1261113,"施工项目目标成本的确定，人工、材料、机械的价格（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"按市场价取定",{"key":24,"text":493,"correct":22},"按投标报价文件规定取定",{"key":28,"text":495,"correct":22},"按现行机械台班单价、周转设备租赁单价取定",{"key":31,"text":497,"correct":26},"按实际发生价取定",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},1261114,"建设工程项目施工成本管理的组织措施之一是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"编制施工成本控制工作流程图",{"key":24,"text":505,"correct":22},"制定施工方案并对其进行分析论证",{"key":28,"text":507,"correct":22},"进行工程风险分析并制定防范性对策",{"key":31,"text":509,"correct":22},"防止和处理施工索赔",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},1261115,"施工成本控制的步骤中，最具实质性的一步是（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"预测",{"key":24,"text":517,"correct":22},"比较",{"key":28,"text":519,"correct":22},"分祈",{"key":31,"text":521,"correct":26},"纠偏",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1261117,"施工项目成本控制工作从施工项目（ ）开始直到竣工验收，贯穿于全过程。",[526,528,530,532],{"key":20,"text":527,"correct":22},"设计阶段",{"key":24,"text":529,"correct":26},"投标阶段",{"key":28,"text":531,"correct":22},"施工准备阶段",{"key":31,"text":533,"correct":22},"正式开工",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},1261118,"在施工成本管理过程中，（ ）贯穿于施工项目从投标阶段开始直到项目竣工验收的全过程，而且是企业全面成本管理的重要环节。",[538,540,541,542],{"key":20,"text":539,"correct":22},"成本考核",{"key":24,"text":55,"correct":22},{"key":28,"text":57,"correct":26},{"key":31,"text":51,"correct":22},{"id":544,"libraryId":5,"type":545,"typeLabel":546,"stem":547,"options":548,"answer":550,"analysis":33},1261119,3,"判断题","影响工程成本的因素很多，主要有政策法规性因素、地区性与市场性因素、设计因素、施工因素和人员素质因素等五个方面。",[549,551],{"key":20,"text":550,"correct":26},"正确",{"key":24,"text":552,"correct":22},"错误",{"id":554,"libraryId":5,"type":545,"typeLabel":546,"stem":555,"options":556,"answer":552,"analysis":33},1261120,"对偏差原因进行分析的目的是为了有针对性检查纠偏措施的执行情况，从而实现成本的动态控制和主动控制。",[557,558],{"key":20,"text":550,"correct":22},{"key":24,"text":552,"correct":26},{"id":560,"libraryId":5,"type":545,"typeLabel":546,"stem":561,"options":562,"answer":552,"analysis":33},1261121,"在项目的实施过程中，由于各方面的原因，工程变更是可避免的。",[563,564],{"key":20,"text":550,"correct":22},{"key":24,"text":552,"correct":26},{"id":566,"libraryId":5,"type":545,"typeLabel":546,"stem":567,"options":568,"answer":550,"analysis":33},1261122,"承包人必须有一套健全的项目财务管理制度，按规定的权限和程序对项目资金的使用和费用的结算支付进行审核、审批，使其成为施工成本控制的一个重要手段。",[569,570],{"key":20,"text":550,"correct":26},{"key":24,"text":552,"correct":22},{"id":572,"libraryId":5,"type":545,"typeLabel":546,"stem":573,"options":574,"answer":550,"analysis":33},1261123,"施工成本考核衡量成本降低的实际成果，并对成本指标完成情况进行总结和评价。",[575,576],{"key":20,"text":550,"correct":26},{"key":24,"text":552,"correct":22},[578,581,584,587,590,593],{"id":15,"name":579,"category":7,"favorite":580},"领导干部任职前廉政法规知识测试题",92,{"id":582,"name":583,"category":7,"favorite":15},595,"建筑结构与设备",{"id":585,"name":586,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":588,"name":589,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":591,"name":592,"category":7,"favorite":8},534,"BIM工程师",{"id":594,"name":592,"category":7,"favorite":8},535]