[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,8,50,1193,[13,38,53,67,82,97,112,127,141,156,170,184,198,212,221,235,247,261,271,285,291,297,312,318,332,347,361,375,390,396,402,416,422,428,434,448,457,469,481,495,509,523,537,543,555,561,575,589,601,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1261023,2,"多选题","现场质量检查的方法有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","目测法",true,{"key":24,"text":25,"correct":22},"B","实测法",{"key":27,"text":28,"correct":22},"C","试验法",{"key":30,"text":31,"correct":32},"D","计量法",false,{"key":34,"text":35,"correct":32},"E","敲击法","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1261024,"形成质量问题的主要原因：（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"企业缺乏施工技术标准和施工工艺规程",{"key":24,"text":45,"correct":22},"施工人员素质参差不齐，缺乏基本理论知识和实践知识，不了解施工验收规范。质量控制关键岗位人员缺位",{"key":27,"text":47,"correct":22},"对施工过程控制不到位，未做到施工按工艺、操作按规程、检查按规范标准，对分项工程施工质量检验批的检查评定流于形式，缺乏实测实量",{"key":30,"text":49,"correct":22},"工业化程度低",{"key":34,"text":51,"correct":22},"违背客观规律，盲目缩短工期和抢工期，盲目降低成本等","ABCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1261025,"影响工程质量的主要因素有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"人的因素",{"key":24,"text":60,"correct":22},"技术因素",{"key":27,"text":62,"correct":22},"管理因素",{"key":30,"text":64,"correct":22},"环境因素",{"key":34,"text":66,"correct":22},"社会因素",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1261026,"影响工程质量的因素有（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"人员素质",{"key":24,"text":74,"correct":32},"管理途径",{"key":27,"text":76,"correct":22},"机械设备",{"key":30,"text":78,"correct":22},"环境条件",{"key":34,"text":80,"correct":22},"工程材料","ACDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1261027,"饰面板（砖）工程的施工质量控制点（石材）：（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"石材挑选，色差",{"key":24,"text":89,"correct":22},"骨架安装或骨架防锈处理",{"key":27,"text":91,"correct":32},"石材间缝隙",{"key":30,"text":93,"correct":22},"石材安装高低差、平整度",{"key":34,"text":95,"correct":22},"石材运输、安装过程中磕碰","ABDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1261028,"材料的检验方法有：（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"书面检验",{"key":24,"text":104,"correct":22},"外观检验",{"key":27,"text":106,"correct":22},"理化检验",{"key":30,"text":108,"correct":22},"无损检验",{"key":34,"text":110,"correct":32},"物理检验","ABCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1261029,"建设工程质量的特性主要表现在（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":32},"特殊性",{"key":24,"text":119,"correct":32},"局限性",{"key":27,"text":121,"correct":32},"隐蔽性",{"key":30,"text":123,"correct":22},"耐久性",{"key":34,"text":125,"correct":22},"经济性","DE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":52,"analysis":37},1261030,"下列属于工程质量事故常见成因的是（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"违背建设程序",{"key":24,"text":134,"correct":22},"违反法规行为",{"key":27,"text":136,"correct":22},"地质勘查失误",{"key":30,"text":138,"correct":22},"使用不合格的原材料、制品及设备",{"key":34,"text":140,"correct":22},"施工与管理不到位",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1261031,"根据GB\u002FT19000-2000对质量和质量管理的定义以及工程项目及其生产过程的特点，施工质量及质量管理具有影响因素多、质量波动大、质量隐蔽性和终检局限性等特点，其中： 下面属于项目的特征的是（ ）。（多项选择题）",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"项目的一次性",{"key":24,"text":148,"correct":22},"项目目标的明确性",{"key":27,"text":150,"correct":32},"项目的临时性",{"key":30,"text":152,"correct":22},"项目作为管理对象的整体性",{"key":34,"text":154,"correct":32},"项目的生命周期性","ABD",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":36,"analysis":37},1261032,"大力推进采用（ ），不断提高工艺技术水平，是保证工程质量稳定提高的重要因素。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"新技术",{"key":24,"text":163,"correct":22},"新工艺",{"key":27,"text":165,"correct":22},"新方法",{"key":30,"text":167,"correct":32},"新想法",{"key":34,"text":169,"correct":32},"新创意",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":81,"analysis":37},1261033,"施工工程质量自控的要求包括（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"预防为主",{"key":24,"text":177,"correct":32},"组织机构完善",{"key":27,"text":179,"correct":22},"重点控制",{"key":30,"text":181,"correct":22},"坚持标准",{"key":34,"text":183,"correct":22},"记录完整",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":52,"analysis":37},1261034,"下列属于材料控制要点的是（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"掌握材料信息，优选供货厂家",{"key":24,"text":191,"correct":22},"合理组织材料供应，确保施工正常进行",{"key":27,"text":193,"correct":22},"合理地组织材料使用，减少材料的损失",{"key":30,"text":195,"correct":22},"加强材料检查验收，严把材料质量关",{"key":34,"text":197,"correct":22},"要重视材料的使用认证，以防错用或使用不合格的材料",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":111,"analysis":37},1261035,"施工阶段项目管理的任务，就是通过施工生产要素的优化配置和动态管理，以实现施工项目的（ ）管理目标。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"质量",{"key":24,"text":205,"correct":22},"成本",{"key":27,"text":207,"correct":22},"进度",{"key":30,"text":209,"correct":22},"安全",{"key":34,"text":211,"correct":32},"环境",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":36,"analysis":37},1261036,"施工质量控制的基本环节包括（ ）。 A.质量的事前控制 B.质量事中控制 C.质量事后控制 D.施工准备控制E施工过程控制",[216,217,218,219,220],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":32},{"key":34,"text":34,"correct":32},{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":52,"analysis":37},1261037,"根据实践经验的总结，施工质量自控的有效制度有（ ）。",[225,227,229,231,233],{"key":20,"text":226,"correct":22},"质量自检制度",{"key":24,"text":228,"correct":22},"质量例会制度",{"key":27,"text":230,"correct":22},"质量会诊制度",{"key":30,"text":232,"correct":22},"质量样板制度",{"key":34,"text":234,"correct":22},"质量挂牌制度",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":246,"analysis":37},1261038,"影响建设工程项目质量的管理因素，主要是（ ）。",[239,241,242,243,244],{"key":20,"text":240,"correct":22},"组织因素",{"key":24,"text":60,"correct":32},{"key":27,"text":64,"correct":32},{"key":30,"text":58,"correct":32},{"key":34,"text":245,"correct":22},"决策因素","AE",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":52,"analysis":37},1261039,"施工作业质量的自控过程是由施工作业组织的成员进行的，其基本的控制程序包括（ ）。",[251,253,255,257,259],{"key":20,"text":252,"correct":22},"作业技术交底",{"key":24,"text":254,"correct":22},"自检自查",{"key":27,"text":256,"correct":22},"互检互查",{"key":30,"text":258,"correct":22},"专职管理人员质量检查",{"key":34,"text":260,"correct":22},"施工验收",{"id":262,"libraryId":5,"type":263,"typeLabel":264,"stem":265,"options":266,"answer":270,"analysis":37},1261040,3,"判断题","围挡的高度：市区主要路段不宜低于2.2m,一般路段不低于1.5m。",[267,269],{"key":20,"text":268,"correct":32},"正确",{"key":24,"text":270,"correct":22},"错误",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":111,"analysis":37},1261041,"施工作业质量的自控包括：（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"施工作业质量自控的意义",{"key":24,"text":278,"correct":22},"施工作业质量自控的程序",{"key":27,"text":280,"correct":22},"施工作业质量自控的要求",{"key":30,"text":282,"correct":22},"施工作业质量自控的有效制度",{"key":34,"text":284,"correct":32},"施工作业质量自控的有效手段",{"id":286,"libraryId":5,"type":263,"typeLabel":264,"stem":287,"options":288,"answer":268,"analysis":37},1261042,"常用的组织结构模式包括职能组织结构、线性组织结构和矩阵组织结构等。",[289,290],{"key":20,"text":268,"correct":22},{"key":24,"text":270,"correct":32},{"id":292,"libraryId":5,"type":263,"typeLabel":264,"stem":293,"options":294,"answer":268,"analysis":37},1261043,"在动态控制的工作程序中收集项目目标的实际值，定期（如每两周或每月）进行项目目标的计划值和实际值的比较是必不可少的。",[295,296],{"key":20,"text":268,"correct":22},{"key":24,"text":270,"correct":32},{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":311,"analysis":37},1261044,"装饰项目前期策划主要包括（ ）。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"质量管理的策划",{"key":24,"text":304,"correct":22},"进度与资源配置策划",{"key":27,"text":306,"correct":22},"成本管理策划",{"key":30,"text":308,"correct":32},"施工测量放线策划",{"key":34,"text":310,"correct":22},"职业健康安全与环境管理的策划","ABCE",{"id":313,"libraryId":5,"type":263,"typeLabel":264,"stem":314,"options":315,"answer":270,"analysis":37},1261045,"根据《建筑工程施工质量验收统一标准》（GB50300-2001）的规定，建筑工程质量验收应逐级划分为分部工程、单位工程、分项工程、检验批。",[316,317],{"key":20,"text":268,"correct":32},{"key":24,"text":270,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":36,"analysis":37},1261046,"机械设备可分为：（ ）。",[322,324,326,328,330],{"key":20,"text":323,"correct":22},"组成工程实体及配套的工艺设备",{"key":24,"text":325,"correct":22},"组成工程实体及配套的各类机具",{"key":27,"text":327,"correct":22},"施工过程中使用的各类机具设备",{"key":30,"text":329,"correct":32},"施工过程中使用的各类工艺设备",{"key":34,"text":331,"correct":32},"服务人的各类机具设备",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":346,"analysis":37},1261047,"工程作业环境，如（ ）。",[336,338,340,342,344],{"key":20,"text":337,"correct":32},"通风设备",{"key":24,"text":339,"correct":22},"施工环境作业面大小",{"key":27,"text":341,"correct":22},"防护设施",{"key":30,"text":343,"correct":22},"通风照明",{"key":34,"text":345,"correct":22},"通风条件","BCDE",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":111,"analysis":37},1261048,"材料质量控制的内容主要有：（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":22},"材料的质量标准",{"key":24,"text":354,"correct":22},"材料的性能",{"key":27,"text":356,"correct":22},"材料取样、试验方法",{"key":30,"text":358,"correct":22},"材料的适用范围和施工要求",{"key":34,"text":360,"correct":32},"材料的强度和使用寿命",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":374,"analysis":37},1261049,"机械设备可分为两类：一是指组成工程实体及配套的工艺设备和各类机具，如（ ）。",[365,367,369,371,373],{"key":20,"text":366,"correct":22},"电梯",{"key":24,"text":368,"correct":32},"计量器具",{"key":27,"text":370,"correct":22},"泵机",{"key":30,"text":372,"correct":32},"安全设施",{"key":34,"text":337,"correct":22},"ACE",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":389,"analysis":37},1261050,"属于部门控制式项目组织缺点的是（ ）。",[379,381,383,385,387],{"key":20,"text":380,"correct":32},"各类人员来自不同部门，互相不熟悉",{"key":24,"text":382,"correct":32},"不能适应大型项目管理需要，而真正需要进行施工项目管理的工程正是大型项目",{"key":27,"text":384,"correct":22},"不利于对计划体系下的组织体制（固定建制）进行调整",{"key":30,"text":386,"correct":22},"不利于精简机构",{"key":34,"text":388,"correct":32},"具有不同的专业背景，难免配合不力","CD",{"id":391,"libraryId":5,"type":263,"typeLabel":264,"stem":392,"options":393,"answer":268,"analysis":37},1261051,"事中质量控制控制的关键是坚持质量标准;控制的重点是工序质量、工作质量和质量控制点的控制。",[394,395],{"key":20,"text":268,"correct":22},{"key":24,"text":270,"correct":32},{"id":397,"libraryId":5,"type":263,"typeLabel":264,"stem":398,"options":399,"answer":268,"analysis":37},1261052,"在一个建设工程项目实施过程中，其管理工作的流程、信息处理的流程以及设计工作、物资采购和施工的流程组织都属于工作流程组织的范畴。",[400,401],{"key":20,"text":268,"correct":22},{"key":24,"text":270,"correct":32},{"id":403,"libraryId":5,"type":404,"typeLabel":405,"stem":406,"options":407,"answer":20,"analysis":37},1261053,1,"单选题","下列不属于矩阵式组织结构优点的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":22},"职责明确，职能专一，关系简单",{"key":24,"text":411,"correct":32},"兼有部门控制式和工作队式两种组织的优点",{"key":27,"text":413,"correct":32},"能以尽可能少的人力，实现多个项目管理的高效率",{"key":30,"text":415,"correct":32},"有利于人才的全面培养",{"id":417,"libraryId":5,"type":263,"typeLabel":264,"stem":418,"options":419,"answer":270,"analysis":37},1261054,"建筑装饰装修工程常见的施工质量缺陷有：脱落、裂、渗、观感效果差等。",[420,421],{"key":20,"text":268,"correct":32},{"key":24,"text":270,"correct":22},{"id":423,"libraryId":5,"type":263,"typeLabel":264,"stem":424,"options":425,"answer":268,"analysis":37},1261055,"工序质量控制是施工阶段质量控制的重点。",[426,427],{"key":20,"text":268,"correct":22},{"key":24,"text":270,"correct":32},{"id":429,"libraryId":5,"type":263,"typeLabel":264,"stem":430,"options":431,"answer":268,"analysis":37},1261056,"验收不合格的隐蔽工程，应按验收整改意见进行整改后重新验收。",[432,433],{"key":20,"text":268,"correct":22},{"key":24,"text":270,"correct":32},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":311,"analysis":37},1261057,"下列属于工程质量特点的是（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":22},"评价方法的特殊性",{"key":24,"text":441,"correct":22},"终检的局限性",{"key":27,"text":443,"correct":22},"质量隐蔽性",{"key":30,"text":445,"correct":32},"工程项目质量管理难度较大",{"key":34,"text":447,"correct":22},"质量波动大",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":155,"analysis":37},1261058,"下面属于项目的特征的是（ ）。",[452,453,454,455,456],{"key":20,"text":146,"correct":22},{"key":24,"text":148,"correct":22},{"key":27,"text":150,"correct":32},{"key":30,"text":152,"correct":22},{"key":34,"text":154,"correct":32},{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":52,"analysis":37},1261059,"工序是（ ）对工程质量综合起作用的过程，所以对施工过程的质量控制，必须以工序作业质量控制为基础和核心。",[461,463,465,466,468],{"key":20,"text":462,"correct":22},"人",{"key":24,"text":464,"correct":22},"材料",{"key":27,"text":76,"correct":22},{"key":30,"text":467,"correct":22},"施工方法",{"key":34,"text":64,"correct":22},{"id":470,"libraryId":5,"type":404,"typeLabel":405,"stem":471,"options":472,"answer":20,"analysis":37},1261060,"反映一个组织系统中各子系统之间或各元素（各工作部门）之间指令关系的是",[473,475,477,479],{"key":20,"text":474,"correct":22},"组织结构模式",{"key":24,"text":476,"correct":32},"组织分工",{"key":27,"text":478,"correct":32},"工作流程组织",{"key":30,"text":480,"correct":32},"工作分解结构",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":96,"analysis":37},1261061,"轻钢龙骨隔断墙工程施工质量控制点：（ ）。",[485,487,489,491,493],{"key":20,"text":486,"correct":22},"基层弹线",{"key":24,"text":488,"correct":22},"龙骨的间距、大小和强度",{"key":27,"text":490,"correct":32},"龙骨起拱",{"key":30,"text":492,"correct":22},"自攻螺丝的间距",{"key":34,"text":494,"correct":22},"石膏板间留缝",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":52,"analysis":37},1261062,"下列属于质量控制点的重点控制对象的是（ ）。",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"人的行为",{"key":24,"text":502,"correct":22},"材料的质量与性能",{"key":27,"text":504,"correct":22},"施工方法与关键操作",{"key":30,"text":506,"correct":22},"施工技术参数",{"key":34,"text":508,"correct":22},"技术间歇",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":52,"analysis":37},1261063,"下列属于质量管理原则的是（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"以顾客为关注焦点",{"key":24,"text":516,"correct":22},"领导作用",{"key":27,"text":518,"correct":22},"全员参与",{"key":30,"text":520,"correct":22},"过程方法",{"key":34,"text":522,"correct":22},"管理的系统方法",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":36,"analysis":37},1261064,"人员的素质，即人的（ ）。",[527,529,531,533,535],{"key":20,"text":528,"correct":22},"文化水平",{"key":24,"text":530,"correct":22},"技术水平",{"key":27,"text":532,"correct":22},"决策能力",{"key":30,"text":534,"correct":32},"思维方式",{"key":34,"text":536,"correct":32},"身体素质",{"id":538,"libraryId":5,"type":263,"typeLabel":264,"stem":539,"options":540,"answer":268,"analysis":37},1261065,"特别重大事故，是指造成30人以上死亡，或者100人以上重伤，或者1亿元以上直接经济损失的事故。",[541,542],{"key":20,"text":268,"correct":22},{"key":24,"text":270,"correct":32},{"id":544,"libraryId":5,"type":404,"typeLabel":405,"stem":545,"options":546,"answer":27,"analysis":37},1261066,"根据GB\u002FT19000-2000对质量和质量管理的定义以及工程项目及其生产过程的特点，施工质量及质量管理具有影响因素多、质量波动大、质量隐蔽性和终检局限性等特点，其中： 施工质量终检的局限性主要是因为（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":32},"工程形体庞大",{"key":24,"text":550,"correct":32},"施工过程具有流动性",{"key":27,"text":552,"correct":22},"建筑产品具有单件性",{"key":30,"text":554,"correct":32},"不能通过解体来检查内在质量",{"id":556,"libraryId":5,"type":263,"typeLabel":264,"stem":557,"options":558,"answer":268,"analysis":37},1261067,"施工质量检查是施工质量验收的基础。",[559,560],{"key":20,"text":268,"correct":22},{"key":24,"text":270,"correct":32},{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":155,"analysis":37},1261068,"属于工作队式项目组织优点的有（ ）。",[565,567,569,571,573],{"key":20,"text":566,"correct":22},"项目经理从职能部门抽调或招聘的是一批专家，他们在项目管理中配合，协同工作，可以取长补短，有利于培养一专多能的人才并充分发挥其作用",{"key":24,"text":568,"correct":22},"各专业人才集中在现场办公，减少了扯皮和等待时间，办事效率高，解决问题快",{"key":27,"text":570,"correct":32},"由于减少了项目与职能部门的结合部，项目与企业的结合部关系弱化，故易于协调关系，减少了行政干预，使项目经理的工作易于开展",{"key":30,"text":572,"correct":22},"不打乱企业的原建制，传统的直线职能制组织仍可保留",{"key":34,"text":574,"correct":32},"项目经理无须专门训练便容易进人状态",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":36,"analysis":37},1261069,"事中质量控制的重点是（ ）。",[579,581,583,585,587],{"key":20,"text":580,"correct":22},"工序质量",{"key":24,"text":582,"correct":22},"工作质量",{"key":27,"text":584,"correct":22},"质量控制点的控制",{"key":30,"text":586,"correct":32},"施工质量控制",{"key":34,"text":588,"correct":32},"技术质量控制",{"id":590,"libraryId":5,"type":404,"typeLabel":405,"stem":591,"options":592,"answer":24,"analysis":37},1261070,"不属于运用动态控制原理控制施工进度的步骤是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":32},"施工成本目标的逐层分解",{"key":24,"text":596,"correct":22},"在施工过程中对施工成本目标进行动态跟踪和控制",{"key":27,"text":598,"correct":32},"如有必要（即发现原定的施工进度目标不合理，或原定的施工进度目标无法实现等），则应调整施工进度目标",{"key":30,"text":600,"correct":32},"定期对施工进度的计划值和实际值进行比较",{"id":602,"libraryId":5,"type":263,"typeLabel":264,"stem":603,"options":604,"answer":270,"analysis":37},1261071,"施工质量控制应贯彻全面、全过程质量管理的思想，运用静态控制原理，进行质量的事前控制、事中控制和事后控制。",[605,606],{"key":20,"text":268,"correct":32},{"key":24,"text":270,"correct":22},{"id":608,"libraryId":5,"type":263,"typeLabel":264,"stem":609,"options":610,"answer":268,"analysis":37},1261072,"建筑装饰装修工程施工质量问题产生的原因是多方面的，其施工质量缺陷原因分析应针对影响施工质量的五大要素（人、机械、材料、施工方法、环境条件）。",[611,612],{"key":20,"text":268,"correct":22},{"key":24,"text":270,"correct":32},[614,617,620,623,626,629],{"id":404,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":404},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":404},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":404},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]