[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":518},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,5,50,1193,[13,34,46,58,68,78,88,94,100,106,112,118,124,130,136,142,148,154,160,166,184,199,211,226,241,256,266,281,296,311,321,333,341,356,368,374,386,394,408,420,435,441,452,462,476,482,488,494,500,506],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1260872,1,"单选题","加强培训，并伴有激励机制，是（ ）的进度计划调整方法。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","增加资源的投入",false,{"key":24,"text":25,"correct":22},"B","改变工作的逻辑关系",{"key":27,"text":28,"correct":22},"C","资源供应的调整",{"key":30,"text":31,"correct":32},"D","提高劳动生产率",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1260873,"工程项目的控制性实施进度计划与工程项目中的（ ）一一对应。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工总进度计划",{"key":24,"text":41,"correct":32},"单位工程施工进度计划",{"key":27,"text":43,"correct":22},"分部分项工程施工进度计划",{"key":30,"text":45,"correct":22},"专项工程施工进度计划",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1260874,"因为计划中未考虑到的风险和状况，出现了进度偏差，属于（ ）因素。",[50,52,54,56],{"key":20,"text":51,"correct":32},"工期及相关计划的失误",{"key":24,"text":53,"correct":22},"工程条件的变化",{"key":27,"text":55,"correct":22},"管理过程中的失误",{"key":30,"text":57,"correct":22},"其他原因",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1260875,"必须经过上层管理者，如投资者、业主的批准的进度计划调整方法是（ ）。",[62,64,65,67],{"key":20,"text":63,"correct":22},"采用新技术，减少资源投入",{"key":24,"text":25,"correct":22},{"key":27,"text":66,"correct":32},"增减工作的范围",{"key":30,"text":31,"correct":22},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":20,"analysis":33},1260876,"下列选项中，会造成费用增加，且加剧资源供应的困难的，是（ ）进度计划的调整方法。",[72,74,76,77],{"key":20,"text":73,"correct":32},"增加资源投入",{"key":24,"text":75,"correct":22},"改变工作逻辑关系",{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":22},{"id":79,"libraryId":5,"type":80,"typeLabel":81,"stem":82,"options":83,"answer":85,"analysis":33},1260877,3,"判断题","指导性施工进度计划适用于任务具体明确、施工条件基本落实、各项资源供应正常、施工工期不太长的工程。",[84,86],{"key":20,"text":85,"correct":32},"正确",{"key":24,"text":87,"correct":22},"错误",{"id":89,"libraryId":5,"type":80,"typeLabel":81,"stem":90,"options":91,"answer":87,"analysis":33},1260878,"施工段是包括一定工作内容的施工过程，是进度计划的基本组成单元。",[92,93],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":95,"libraryId":5,"type":80,"typeLabel":81,"stem":96,"options":97,"answer":85,"analysis":33},1260879,"流水施工是指所有的施工过程均按一定的时间间隔依次投入施工，各个施工过程陆续开工、陆续竣工，使同一施工过程的施工班组保持连续、均衡施工，不同施工过程尽可能平行搭接施工的组织方式。",[98,99],{"key":20,"text":85,"correct":32},{"key":24,"text":87,"correct":22},{"id":101,"libraryId":5,"type":80,"typeLabel":81,"stem":102,"options":103,"answer":87,"analysis":33},1260880,"横道图横坐标表示流水施工的名称、编号和数目，纵坐标表示流水施工的持续时间。",[104,105],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":107,"libraryId":5,"type":80,"typeLabel":81,"stem":108,"options":109,"answer":87,"analysis":33},1260881,"施工进度计划的劳动力、机械、材料的供应与使用，尽量做到均衡。其中劳动力均衡系数一般应控制在3以下。",[110,111],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":113,"libraryId":5,"type":80,"typeLabel":81,"stem":114,"options":115,"answer":87,"analysis":33},1260882,"若出现进度偏差的工作为非关键工作，则无论偏差大小，都会对后续工作和总工期产生影响。",[116,117],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":119,"libraryId":5,"type":80,"typeLabel":81,"stem":120,"options":121,"answer":85,"analysis":33},1260883,"建筑装饰装修工程施工进度计划的作用表现在：是控制工程施工进程和工程竣工期限等各项装饰装修工程施工活动的依据。",[122,123],{"key":20,"text":85,"correct":32},{"key":24,"text":87,"correct":22},{"id":125,"libraryId":5,"type":80,"typeLabel":81,"stem":126,"options":127,"answer":85,"analysis":33},1260884,"若出现进度偏差的工作为关键工作，则无论偏差大小，都会对后续工作和总工期产生影响。",[128,129],{"key":20,"text":85,"correct":32},{"key":24,"text":87,"correct":22},{"id":131,"libraryId":5,"type":80,"typeLabel":81,"stem":132,"options":133,"answer":85,"analysis":33},1260885,"由于施工质量问题的返工造成进度偏差，责任由施工单位承担。",[134,135],{"key":20,"text":85,"correct":32},{"key":24,"text":87,"correct":22},{"id":137,"libraryId":5,"type":80,"typeLabel":81,"stem":138,"options":139,"answer":87,"analysis":33},1260886,"控制性施工进度计划是以单位工程作为施工项目划分对象。",[140,141],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":143,"libraryId":5,"type":80,"typeLabel":81,"stem":144,"options":145,"answer":85,"analysis":33},1260887,"编制控制性施工进度计划的工程，当各分部工程的施工条件基本落实之后，在施工之前还应编制各分部工程的指导性施工进度计划。",[146,147],{"key":20,"text":85,"correct":32},{"key":24,"text":87,"correct":22},{"id":149,"libraryId":5,"type":80,"typeLabel":81,"stem":150,"options":151,"answer":87,"analysis":33},1260888,"若出现进度偏差的工作为非关键工作，而该工作的进度偏差小于其总时差，则对后续工作和总工期均不产生影响。",[152,153],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":155,"libraryId":5,"type":80,"typeLabel":81,"stem":156,"options":157,"answer":87,"analysis":33},1260889,"所谓网络图是指由箭头和节点组成的、用来表示工作流程的复杂的、无序的网状图形。",[158,159],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":161,"libraryId":5,"type":80,"typeLabel":81,"stem":162,"options":163,"answer":87,"analysis":33},1260890,"项目概要及进度报告是以单位工程为对象说明进度计划执行情况的报告。",[164,165],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":167,"libraryId":5,"type":168,"typeLabel":169,"stem":170,"options":171,"answer":183,"analysis":33},1260891,2,"多选题","下列选项中，属于综合网络计划编制对象的有（ ）。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"分部工程",{"key":24,"text":175,"correct":22},"单位工程",{"key":27,"text":177,"correct":22},"单项工程",{"key":30,"text":179,"correct":32},"建设项目",{"key":181,"text":182,"correct":32},"E","建筑群","DE",{"id":185,"libraryId":5,"type":168,"typeLabel":169,"stem":186,"options":187,"answer":198,"analysis":33},1260892,"在项目实施过程中，应定期地跟踪检查施工实际进度情况，确定实际进度与计划进度之间的关系，其主要工作包括（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"分析计划进度",{"key":24,"text":191,"correct":32},"跟踪检查工程实际进度",{"key":27,"text":193,"correct":32},"整理统计跟踪检查数据",{"key":30,"text":195,"correct":32},"对比实际进度与计划进度",{"key":181,"text":197,"correct":32},"工程项目进度检查结果的处理","BCDE",{"id":200,"libraryId":5,"type":168,"typeLabel":169,"stem":201,"options":202,"answer":210,"analysis":33},1260893,"当进度出现偏差时，应考虑有关因素，分析产生的原因，其主观因素有（ ）。",[203,204,206,207,208],{"key":20,"text":51,"correct":32},{"key":24,"text":205,"correct":22},"发生公共事件",{"key":27,"text":53,"correct":22},{"key":30,"text":55,"correct":32},{"key":181,"text":209,"correct":22},"遇到暴雪天气","AD",{"id":212,"libraryId":5,"type":168,"typeLabel":169,"stem":213,"options":214,"answer":225,"analysis":33},1260894,"下列选项中，属于横道图进度计划优点的有（ ）。",[215,217,219,221,223],{"key":20,"text":216,"correct":32},"简单、明了、直观，易懂",{"key":24,"text":218,"correct":22},"能全面反映工作之间的逻辑关系",{"key":27,"text":220,"correct":22},"能客观地突出重点",{"key":30,"text":222,"correct":22},"能从图中看出计划的潜力",{"key":181,"text":224,"correct":32},"便于统计资源","AE",{"id":227,"libraryId":5,"type":168,"typeLabel":169,"stem":228,"options":229,"answer":240,"analysis":33},1260895,"编制施工进度计划的工具有很多，主要有（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"控制性计划",{"key":24,"text":233,"correct":32},"横道图计划",{"key":27,"text":235,"correct":32},"网络计划",{"key":30,"text":237,"correct":22},"实施性计划",{"key":181,"text":239,"correct":22},"专项计划","BC",{"id":242,"libraryId":5,"type":168,"typeLabel":169,"stem":243,"options":244,"answer":255,"analysis":33},1260896,"施工进度计划根据施工项目划分的粗细程度划分不包括哪些（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":32},"年进度计划",{"key":24,"text":248,"correct":22},"控制性施工进度计划",{"key":27,"text":250,"correct":32},"季进度计划",{"key":30,"text":252,"correct":22},"指导性施工进度计划",{"key":181,"text":254,"correct":32},"月进度计划","ACE",{"id":257,"libraryId":5,"type":168,"typeLabel":169,"stem":258,"options":259,"answer":265,"analysis":33},1260897,"施工进度计划根据施工项目划分的粗细程度可分为（ ）。",[260,261,262,263,264],{"key":20,"text":246,"correct":22},{"key":24,"text":248,"correct":32},{"key":27,"text":250,"correct":22},{"key":30,"text":252,"correct":32},{"key":181,"text":254,"correct":22},"BD",{"id":267,"libraryId":5,"type":168,"typeLabel":169,"stem":268,"options":269,"answer":280,"analysis":33},1260898,"控制性施工进度计划主要适用于（ ）的工程，同时还适用于虽然工程规模不大、结构不算复杂，但各种资源没有落实，或者由于装饰设计的部位、材料等可能发生变化以及其他各种情况。",[270,272,274,276,278],{"key":20,"text":271,"correct":22},"任务具体明确",{"key":24,"text":273,"correct":32},"结构较复杂",{"key":27,"text":275,"correct":32},"规模较大",{"key":30,"text":277,"correct":32},"工期较长需跨年度施工",{"key":181,"text":279,"correct":22},"施工工期不太长","BCD",{"id":282,"libraryId":5,"type":168,"typeLabel":169,"stem":283,"options":284,"answer":295,"analysis":33},1260899,"检查和调整施工进度计划不包括哪些方面（ ）。",[285,287,289,291,293],{"key":20,"text":286,"correct":22},"施工工期的检查与调整",{"key":24,"text":288,"correct":32},"施工方案的检查与调整",{"key":27,"text":290,"correct":22},"施工顺序的检查与调整",{"key":30,"text":292,"correct":22},"资源均衡性的检查与调整",{"key":181,"text":294,"correct":32},"施工组织的检查与调整","BE",{"id":297,"libraryId":5,"type":168,"typeLabel":169,"stem":298,"options":299,"answer":310,"analysis":33},1260900,"建筑装饰装修工程施工进度计划的作用表现在：（ ）。",[300,302,304,306,308],{"key":20,"text":301,"correct":32},"是控制工程施工进程和工程竣工期限等各项装饰装修工程施工活动的依据",{"key":24,"text":303,"correct":32},"确定装饰装修工程各个工序的施工顺序及需要的施工持续时间",{"key":27,"text":305,"correct":32},"组织协调各个工序之间的衔接、穿插、平行搭接、协作配合等关系",{"key":30,"text":307,"correct":32},"指导现场施工安排，控制施工进度和确保施工任务的按期完成",{"key":181,"text":309,"correct":32},"为制定各项资源需用量计划和编制施工准备工作计划提供依据","ABCDE",{"id":312,"libraryId":5,"type":168,"typeLabel":169,"stem":313,"options":314,"answer":320,"analysis":33},1260901,"检查和调整施工进度计划包括哪些方面（ ）。",[315,316,317,318,319],{"key":20,"text":286,"correct":32},{"key":24,"text":288,"correct":22},{"key":27,"text":290,"correct":32},{"key":30,"text":292,"correct":32},{"key":181,"text":294,"correct":22},"ACD",{"id":322,"libraryId":5,"type":168,"typeLabel":169,"stem":323,"options":324,"answer":332,"analysis":33},1260902,"指导性施工进度计划适用于（ ）的工程。",[325,326,328,329,331],{"key":20,"text":271,"correct":32},{"key":24,"text":327,"correct":32},"施工条件基本落实",{"key":27,"text":273,"correct":22},{"key":30,"text":330,"correct":32},"各项资源供应正常",{"key":181,"text":279,"correct":32},"ABDE",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1260903,"因为计划值不足，相关的实际工作量增加，出现了进度偏差，属于（ ）因素。",[337,338,339,340],{"key":20,"text":51,"correct":32},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":22},{"key":30,"text":57,"correct":22},{"id":342,"libraryId":5,"type":168,"typeLabel":169,"stem":343,"options":344,"answer":355,"analysis":33},1260904,"网络图中，按节点和箭线所代表的含义不同，可分为（ ）。",[345,347,349,351,353],{"key":20,"text":346,"correct":32},"单代号网络图",{"key":24,"text":348,"correct":32},"双代号网络图",{"key":27,"text":350,"correct":22},"横道图",{"key":30,"text":352,"correct":22},"单箭头网络图",{"key":181,"text":354,"correct":22},"双箭头网络图","AB",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1260905,"检查和调整施工进度计划不包括（ ）的检查与调整。",[360,362,364,366],{"key":20,"text":361,"correct":22},"施工工期",{"key":24,"text":363,"correct":32},"施工方案",{"key":27,"text":365,"correct":22},"施工顺序",{"key":30,"text":367,"correct":22},"资源均衡性",{"id":369,"libraryId":5,"type":80,"typeLabel":81,"stem":370,"options":371,"answer":85,"analysis":33},1260906,"进度计划检查时间通常可以确定每月、半月、旬或周进行一次。",[372,373],{"key":20,"text":85,"correct":32},{"key":24,"text":87,"correct":22},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":30,"analysis":33},1260907,"某项目进行墙面进行抹灰、涂饰施工。现由于各种原因，项目年前需要完成施工并交付验收，需要抢工作业。原计划工期如下为，抹灰施工10d，抹灰后间隔10d，涂饰施工12d。项目部原方案为增加抹灰工5人，涂饰工人5人，可使抹灰和涂饰施工时间各减少3d。但考虑到年前抹灰工人工资从原先的200元\u002Fd上涨到了300元\u002Fd，涂饰工人从原先的180元\u002Fd上涨到了250元\u002Fd，故项目部从节省成本考虑，将抹灰后的间隔时间缩短到4d以保证工期顺利完成。试回答以下问题： 在建设工程项目进度控制在管理观念方面存在的主要问题不包括（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"缺乏进度计划系统观念",{"key":24,"text":381,"correct":22},"缺乏进度计划动态控制观念",{"key":27,"text":383,"correct":22},"缺乏进度计划比较优选观念",{"key":30,"text":385,"correct":32},"缺乏进度计划简化观念",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},1260908,"出现了进度偏差，是因为业主拖欠工程款，这个原因属于以下（ ）因素。",[390,391,392,393],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":32},{"key":30,"text":57,"correct":22},{"id":395,"libraryId":5,"type":168,"typeLabel":169,"stem":396,"options":397,"answer":280,"analysis":33},1260909,"横道进度计划的缺点是（ ）。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"复杂、难编制",{"key":24,"text":401,"correct":32},"不能全面反映工作之间的逻辑关系",{"key":27,"text":403,"correct":32},"不能客观地突出重点",{"key":30,"text":405,"correct":32},"不能从图中看出计划的潜力",{"key":181,"text":407,"correct":22},"不便于统计资源",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},1260910,"某项目进行墙面进行抹灰、涂饰施工。现由于各种原因，项目年前需要完成施工并交付验收，需要抢工作业。原计划工期如下为，抹灰施工10d，抹灰后间隔10d，涂饰施工12d。项目部原方案为增加抹灰工5人，涂饰工人5人，可使抹灰和涂饰施工时间各减少3d。但考虑到年前抹灰工人工资从原先的200元\u002Fd上涨到了300元\u002Fd，涂饰工人从原先的180元\u002Fd上涨到了250元\u002Fd，故项目部从节省成本考虑，将抹灰后的间隔时间缩短到4d以保证工期顺利完成。试回答以下问题： 当进度无法满足施工要求时，应考虑加快进度的措施，这些措施不包括（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":32},"压缩某项工作的合理工期",{"key":24,"text":415,"correct":22},"增加某项工作的资源投入",{"key":27,"text":417,"correct":22},"改变工作的先后顺序",{"key":30,"text":419,"correct":22},"改变工作的持续时间",{"id":421,"libraryId":5,"type":168,"typeLabel":169,"stem":422,"options":423,"answer":434,"analysis":33},1260911,"下列选项中，确定分部分项工程的作业时间的方法有（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":32},"经验估算法",{"key":24,"text":427,"correct":32},"定额计算法",{"key":27,"text":429,"correct":32},"倒排计算法",{"key":30,"text":431,"correct":22},"累加数列法",{"key":181,"text":433,"correct":22},"预测法","ABC",{"id":436,"libraryId":5,"type":80,"typeLabel":81,"stem":437,"options":438,"answer":85,"analysis":33},1260912,"根据施工图纸、施工方案，确定拟建工程可划分哪些分部分项工程。",[439,440],{"key":20,"text":85,"correct":32},{"key":24,"text":87,"correct":22},{"id":442,"libraryId":5,"type":168,"typeLabel":169,"stem":443,"options":444,"answer":451,"analysis":33},1260913,"下列选项中，可以调整施工进度计划的方法有（ ）。",[445,446,447,448,449],{"key":20,"text":21,"correct":32},{"key":24,"text":25,"correct":32},{"key":27,"text":28,"correct":32},{"key":30,"text":31,"correct":32},{"key":181,"text":450,"correct":22},"长期延长劳动时间","ABCD",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1260914,"进度计划的基本组成单元是（ ）。",[456,458,459,461],{"key":20,"text":457,"correct":32},"施工项目",{"key":24,"text":175,"correct":22},{"key":27,"text":460,"correct":22},"分项工程",{"key":30,"text":173,"correct":22},{"id":463,"libraryId":5,"type":168,"typeLabel":169,"stem":464,"options":465,"answer":451,"analysis":33},1260915,"下列关于实施性进度计划主要作用的说法，正确的有（ ）。",[466,468,470,472,474],{"key":20,"text":467,"correct":32},"确定各分部分项工程的施工时间及其相互之间的衔接",{"key":24,"text":469,"correct":32},"确定一个月度或旬的机械需求",{"key":27,"text":471,"correct":32},"确定一个月度或旬的人工需求",{"key":30,"text":473,"correct":32},"确定一个月度或旬的建筑材料需求",{"key":181,"text":475,"correct":22},"是施工进度动态控制的依据",{"id":477,"libraryId":5,"type":80,"typeLabel":81,"stem":478,"options":479,"answer":85,"analysis":33},1260916,"进度计划检查的时间间隔与工程项目类型、规模、施工条件和对进度执行要求程度有关。",[480,481],{"key":20,"text":85,"correct":32},{"key":24,"text":87,"correct":22},{"id":483,"libraryId":5,"type":80,"typeLabel":81,"stem":484,"options":485,"answer":85,"analysis":33},1260917,"施工进度计划根据施工项目划分的粗细程度可分为指导性施工进度计划和控制性施工进度计划两类。",[486,487],{"key":20,"text":85,"correct":32},{"key":24,"text":87,"correct":22},{"id":489,"libraryId":5,"type":80,"typeLabel":81,"stem":490,"options":491,"answer":87,"analysis":33},1260918,"施工总进度计划是实施性进度计划。",[492,493],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":495,"libraryId":5,"type":80,"typeLabel":81,"stem":496,"options":497,"answer":87,"analysis":33},1260919,"指导性施工进度计划按分部过程或施工过程来划分施工项目。",[498,499],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":501,"libraryId":5,"type":80,"typeLabel":81,"stem":502,"options":503,"answer":87,"analysis":33},1260920,"网络计划的表达形式是横道图。",[504,505],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":32},{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":30,"analysis":33},1260921,"施工现场安全“五标志”，是指（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"指令标志、禁止标志、警告标志、电力安全标志、危险标志",{"key":24,"text":513,"correct":22},"指令标志、交通标志、警告标志、电力安全标志、提示标志",{"key":27,"text":515,"correct":22},"指令标志、禁止标志、警告标志、消防标志、提示标志",{"key":30,"text":517,"correct":32},"指令标志、禁止标志、警告标志、电力安全标志、提示标志",[519,522,525,528,531,534],{"id":15,"name":520,"category":7,"favorite":521},"领导干部任职前廉政法规知识测试题",92,{"id":523,"name":524,"category":7,"favorite":15},595,"建筑结构与设备",{"id":526,"name":527,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":529,"name":530,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":532,"name":533,"category":7,"favorite":8},534,"BIM工程师",{"id":535,"name":533,"category":7,"favorite":8},535]