[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,4,50,1193,[13,37,51,66,78,90,105,117,129,141,152,164,174,186,192,204,216,222,234,246,258,270,282,294,300,311,323,334,345,360,372,384,398,410,422,437,449,462,474,482,494,502,514,522,528,540,554,562,573,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":35,"analysis":36},1260822,2,"多选题","确定施工流向时，一般应考虑以下那些因素（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","施工方法",true,{"key":24,"text":25,"correct":22},"B","工程各部位的繁简程度",{"key":27,"text":28,"correct":22},"C","选用的材料",{"key":30,"text":31,"correct":22},"D","用户对生产和使用的需要",{"key":33,"text":34,"correct":22},"E","设备管道的布置系统","ABCDE","",{"id":38,"libraryId":5,"type":15,"typeLabel":16,"stem":39,"options":40,"answer":35,"analysis":36},1260823,"混凝土、水泥砂浆整体楼地面面层施工步骤有（ ）。",[41,43,45,47,49],{"key":20,"text":42,"correct":22},"搅拌",{"key":24,"text":44,"correct":22},"基底处理",{"key":27,"text":46,"correct":22},"浇筑",{"key":30,"text":48,"correct":22},"压实",{"key":33,"text":50,"correct":22},"养护",{"id":52,"libraryId":5,"type":53,"typeLabel":54,"stem":55,"options":56,"answer":20,"analysis":36},1260824,1,"单选题","按龙骨吊顶的施工顺序为：（ ）。",[57,59,62,64],{"key":20,"text":58,"correct":22},"弹线找平→安装吊杆→安装主龙骨→安装次龙骨及横撑龙骨→安装饰面板",{"key":24,"text":60,"correct":61},"弹线找平→安装主龙骨→安装吊杆→安装次龙骨及横撑龙骨→安装饰面板",false,{"key":27,"text":63,"correct":61},"弹线找平→安装吊杆→安装次龙骨及横撑龙骨→安装主龙骨→安装饰面板",{"key":30,"text":65,"correct":61},"弹线找平→安装吊杆→安装主龙骨→安装饰面板",{"id":67,"libraryId":5,"type":53,"typeLabel":54,"stem":68,"options":69,"answer":20,"analysis":36},1260825,"混凝土、水泥砂浆整体楼地面面层施工中，等面层凝固后要及时洒水、喷水或撒锯沫浇水养护（ ）。",[70,72,74,76],{"key":20,"text":71,"correct":22},"7d",{"key":24,"text":73,"correct":61},"15d",{"key":27,"text":75,"correct":61},"20d",{"key":30,"text":77,"correct":61},"30d",{"id":79,"libraryId":5,"type":53,"typeLabel":54,"stem":80,"options":81,"answer":24,"analysis":36},1260826,"混凝土及抹灰面溶剂型涂料的施工中，作业环境温度不低于（ ），相对湿度不宜大于60%。",[82,84,86,88],{"key":20,"text":83,"correct":61},"12℃",{"key":24,"text":85,"correct":22},"10℃",{"key":27,"text":87,"correct":61},"15℃",{"key":30,"text":89,"correct":61},"20℃",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":104,"analysis":36},1260827,"不属于建筑装饰装修工程施工的有哪些（ ）。",[94,96,98,100,102],{"key":20,"text":95,"correct":22},"设备工程",{"key":24,"text":97,"correct":22},"主体工程",{"key":27,"text":99,"correct":61},"楼地面工程",{"key":30,"text":101,"correct":61},"门窗工程",{"key":33,"text":103,"correct":22},"基础工程","ABE",{"id":106,"libraryId":5,"type":53,"typeLabel":54,"stem":107,"options":108,"answer":20,"analysis":36},1260828,"穿过墙壁的线槽四周应留出（ ）mm的距离，并用防火枕进行封堵。",[109,111,113,115],{"key":20,"text":110,"correct":22},"50",{"key":24,"text":112,"correct":61},"60",{"key":27,"text":114,"correct":61},"70",{"key":30,"text":116,"correct":61},"80",{"id":118,"libraryId":5,"type":53,"typeLabel":54,"stem":119,"options":120,"answer":20,"analysis":36},1260829,"花灯的吊钩其圆钢直径不小于吊挂销钉的直径，且不得小于（ ）mm。",[121,123,125,127],{"key":20,"text":122,"correct":22},"6",{"key":24,"text":124,"correct":61},"8",{"key":27,"text":126,"correct":61},"10",{"key":30,"text":128,"correct":61},"12",{"id":130,"libraryId":5,"type":53,"typeLabel":54,"stem":131,"options":132,"answer":27,"analysis":36},1260830,"建筑装饰工程的施工程序不包括（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":61},"先室外后室内",{"key":24,"text":136,"correct":61},"先室内后室外",{"key":27,"text":138,"correct":22},"先上后下",{"key":30,"text":140,"correct":61},"室内外同时",{"id":142,"libraryId":5,"type":53,"typeLabel":54,"stem":143,"options":144,"answer":24,"analysis":36},1260831,"危险性较大及特殊危险场所，当灯具距地面高度小于2.4m时，使用额定电压为（ ）V及以下的照明灯具，或有专用保护措施。",[145,147,149,150],{"key":20,"text":146,"correct":61},"30",{"key":24,"text":148,"correct":22},"36",{"key":27,"text":110,"correct":61},{"key":30,"text":151,"correct":61},"100",{"id":153,"libraryId":5,"type":53,"typeLabel":54,"stem":154,"options":155,"answer":27,"analysis":36},1260832,"排水主立管及水平干管管道均应做通球试验，通球径不小于排水管道管径的（ ），通球率必须到达100%。",[156,158,160,162],{"key":20,"text":157,"correct":61},"1\u002F3",{"key":24,"text":159,"correct":61},"1\u002F2",{"key":27,"text":161,"correct":22},"2\u002F3",{"key":30,"text":163,"correct":61},"3\u002F4",{"id":165,"libraryId":5,"type":166,"typeLabel":167,"stem":168,"options":169,"answer":171,"analysis":36},1260833,3,"判断题","安装隔墙施工作业前施工现场条板隔墙安装部位的结构应已验收完毕现场杂物应已清理场地应平整。",[170,172],{"key":20,"text":171,"correct":22},"正确",{"key":24,"text":173,"correct":61},"错误",{"id":175,"libraryId":5,"type":53,"typeLabel":54,"stem":176,"options":177,"answer":24,"analysis":36},1260834,"金属排水管道上的吊钩或卡箍应固定在承重结构上。固定件间距：横管不大于（ ）m；立管不大于（ ）m。",[178,180,182,184],{"key":20,"text":179,"correct":61},"22",{"key":24,"text":181,"correct":22},"23",{"key":27,"text":183,"correct":61},"33",{"key":30,"text":185,"correct":61},"32",{"id":187,"libraryId":5,"type":166,"typeLabel":167,"stem":188,"options":189,"answer":173,"analysis":36},1260835,"施工顺序是指在建筑装饰工程施工中，不同施工阶段的不同工作内容按照其可变的、在一般情况下不可违背的先后次序。",[190,191],{"key":20,"text":171,"correct":61},{"key":24,"text":173,"correct":22},{"id":193,"libraryId":5,"type":53,"typeLabel":54,"stem":194,"options":195,"answer":20,"analysis":36},1260836,"选择（ ）是施工方案中的关键问题，它直接影响施工质量、进度、安全以及工程成本，因此在编制施工组织设计时必须加以重视。",[196,198,200,202],{"key":20,"text":197,"correct":22},"施工方法和施工机械",{"key":24,"text":199,"correct":61},"施工工序和施工方法",{"key":27,"text":201,"correct":61},"施工工序和施工机械",{"key":30,"text":203,"correct":61},"施工程序和施工方法",{"id":205,"libraryId":5,"type":53,"typeLabel":54,"stem":206,"options":207,"answer":24,"analysis":36},1260837,"根据室内高度和抹灰现场的具体情况，提前搭好抹灰操作用的高凳和架子，架子要离开墙面及墙角（ ），以便于操作。",[208,210,212,214],{"key":20,"text":209,"correct":61},"100～250mm",{"key":24,"text":211,"correct":22},"200～250mm",{"key":27,"text":213,"correct":61},"200～300mm",{"key":30,"text":215,"correct":61},"150～250mm",{"id":217,"libraryId":5,"type":166,"typeLabel":167,"stem":218,"options":219,"answer":171,"analysis":36},1260838,"编制施工组织设计在考虑安全、文明施工及成品保护措施的同时，应同步考虑消防措施。",[220,221],{"key":20,"text":171,"correct":22},{"key":24,"text":173,"correct":61},{"id":223,"libraryId":5,"type":53,"typeLabel":54,"stem":224,"options":225,"answer":30,"analysis":36},1260839,"（ ）在接受交底后，应组织工人讨论，按要求施工。",[226,228,230,232],{"key":20,"text":227,"correct":61},"公司总工程师",{"key":24,"text":229,"correct":61},"分公司主任工程师或项目部的技术负责人",{"key":27,"text":231,"correct":61},"工长",{"key":30,"text":233,"correct":22},"班组长",{"id":235,"libraryId":5,"type":53,"typeLabel":54,"stem":236,"options":237,"answer":27,"analysis":36},1260840,"混凝土及抹灰面溶剂型涂料的施工中，基层干燥，含水率不大于（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":61},"15%",{"key":24,"text":241,"correct":61},"10%",{"key":27,"text":243,"correct":22},"8%",{"key":30,"text":245,"correct":61},"6%",{"id":247,"libraryId":5,"type":53,"typeLabel":54,"stem":248,"options":249,"answer":30,"analysis":36},1260841,"编制施工组织设计的原则有多种，可不考虑的原则是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":61},"工程的组织对施工的作用",{"key":24,"text":253,"correct":61},"施工的工业化程度",{"key":27,"text":255,"correct":61},"管理创新和技术创新",{"key":30,"text":257,"correct":22},"工程施工的设计创新",{"id":259,"libraryId":5,"type":53,"typeLabel":54,"stem":260,"options":261,"answer":24,"analysis":36},1260842,"建筑装饰工程的施工程序是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":61},"一般有先室外后室内及室内外同时进行两种情况",{"key":24,"text":265,"correct":22},"一般有先室外后室内、先室内后室外及室内外同时进行三种情况",{"key":27,"text":267,"correct":61},"一般有先室内后室外及室内外同时进行两种情况",{"key":30,"text":269,"correct":61},"一般有先室外后室内、先上后下及室内外同时进行三种情况",{"id":271,"libraryId":5,"type":53,"typeLabel":54,"stem":272,"options":273,"answer":27,"analysis":36},1260843,"关于分部（分项）工程作业计划，以下表述正确的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":61},"是以群体工程为施工组织对象进行编制的",{"key":24,"text":277,"correct":61},"是以单位工程为对象编制的",{"key":27,"text":279,"correct":22},"以某些主要的或新结构、技术复杂的或缺乏施工经验的分部（分项）工程为对象编制的",{"key":30,"text":281,"correct":61},"设计单位和总分包单位参加共同编制",{"id":283,"libraryId":5,"type":53,"typeLabel":54,"stem":284,"options":285,"answer":27,"analysis":36},1260844,"板材隔墙安装的允许偏差，立面垂直度，石膏空心板为（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":61},"5mm",{"key":24,"text":289,"correct":61},"2mm",{"key":27,"text":291,"correct":22},"3mm",{"key":30,"text":293,"correct":61},"15mm",{"id":295,"libraryId":5,"type":166,"typeLabel":167,"stem":296,"options":297,"answer":173,"analysis":36},1260845,"民用建筑护栏高度不应小于有关规范要求的数值，高层建筑的护栏高度应再适当提高，但不宜超过1.0m。",[298,299],{"key":20,"text":171,"correct":61},{"key":24,"text":173,"correct":22},{"id":301,"libraryId":5,"type":53,"typeLabel":54,"stem":302,"options":303,"answer":24,"analysis":36},1260846,"抹灰工程应分层进行。当抹灰总厚度大于或等于（ ）mm时，应采取加强措施。",[304,306,308,309],{"key":20,"text":305,"correct":61},"20",{"key":24,"text":307,"correct":22},"35",{"key":27,"text":126,"correct":61},{"key":30,"text":310,"correct":61},"40",{"id":312,"libraryId":5,"type":53,"typeLabel":54,"stem":313,"options":314,"answer":24,"analysis":36},1260847,"施工组织设计的“施工部署”内容里，对于工程的施工重点、难点应进行分析，包括组织管理和施工（ ）两个方面。",[315,317,319,321],{"key":20,"text":316,"correct":61},"管理",{"key":24,"text":318,"correct":22},"技术",{"key":27,"text":320,"correct":61},"质量",{"key":30,"text":322,"correct":61},"顺序",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":333,"analysis":36},1260848,"建筑装饰工程的施工程序的一般程序不包括哪些（ ）。",[327,328,329,330,331],{"key":20,"text":134,"correct":61},{"key":24,"text":136,"correct":61},{"key":27,"text":138,"correct":22},{"key":30,"text":140,"correct":61},{"key":33,"text":332,"correct":22},"上下同时进行","CE",{"id":335,"libraryId":5,"type":53,"typeLabel":54,"stem":336,"options":337,"answer":27,"analysis":36},1260849,"线槽水平或垂直敷设时的平直度和垂直度允许偏差不应超过全长的（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":61},"3%",{"key":24,"text":341,"correct":61},"4%",{"key":27,"text":343,"correct":22},"5％",{"key":30,"text":245,"correct":61},{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":359,"analysis":36},1260850,"设备安装与装饰工程中的施工顺序不正确的有（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":61},"先进行设备管线的安装，再进行建筑装饰装修工程的施工",{"key":24,"text":352,"correct":22},"在预埋阶段，先通风、后电器线路、再水暖管道",{"key":27,"text":354,"correct":22},"总的规律是封闭+预埋+装饰",{"key":30,"text":356,"correct":61},"封闭阶段，先墙面、后顶面、再地面",{"key":33,"text":358,"correct":61},"装饰阶段，先油漆、后裱糊、再面板","BC",{"id":361,"libraryId":5,"type":53,"typeLabel":54,"stem":362,"options":363,"answer":27,"analysis":36},1260851,"装饰装修工程的施工条件包括（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":61},"人文条件和施工现场条件",{"key":24,"text":367,"correct":61},"自然条件和人工条件",{"key":27,"text":369,"correct":22},"自然条件和施工现场条件",{"key":30,"text":371,"correct":61},"地质条件和施工现场条件",{"id":373,"libraryId":5,"type":53,"typeLabel":54,"stem":374,"options":375,"answer":27,"analysis":36},1260852,"确定施工流向时，工程各部位的繁简程度，哪些部位应先施工（ ）。",[376,378,380,382],{"key":20,"text":377,"correct":61},"技术简单",{"key":24,"text":379,"correct":61},"施工进度较快",{"key":27,"text":381,"correct":22},"工期较长",{"key":30,"text":383,"correct":61},"体型简单",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":35,"analysis":36},1260853,"室内电气系统金属线槽敷设及其配线工程施工验收标准一般项目：（ ）。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"线槽应安装牢固，无扭曲变形，紧固件的螺母应在线槽外侧",{"key":24,"text":391,"correct":22},"线槽在建筑物变形缝处，应设补偿装置",{"key":27,"text":393,"correct":22},"当采用多相供电时，同一建筑物、构筑物的电线绝缘层颜色选择应一致，即保护地线（PE线）应是黄绿相间色，零线用淡蓝色；相线用：A相一黄色、B相一绿色、C相一红色",{"key":30,"text":395,"correct":22},"线槽应紧贴建筑物表面，固定牢靠，横平竖直，布置合理，盖板无翘角，接口严密整齐",{"key":33,"text":397,"correct":22},"线槽水平或垂直敷设时的平直度和垂直度允许偏差不应超过全长的5%",{"id":399,"libraryId":5,"type":53,"typeLabel":54,"stem":400,"options":401,"answer":30,"analysis":36},1260854,"绝缘导线的额定电压不低于（ ）V。",[402,404,406,408],{"key":20,"text":403,"correct":61},"200",{"key":24,"text":405,"correct":61},"300",{"key":27,"text":407,"correct":61},"400",{"key":30,"text":409,"correct":22},"500",{"id":411,"libraryId":5,"type":53,"typeLabel":54,"stem":412,"options":413,"answer":24,"analysis":36},1260855,"加气混凝土、混凝土空心砌块墙体双面满铺钢丝网，并与梁、柱、剪力墙界面搭接宽（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":61},"80mm",{"key":24,"text":417,"correct":22},"100mm",{"key":27,"text":419,"correct":61},"150mm",{"key":30,"text":421,"correct":61},"200mm",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":436,"analysis":36},1260856,"下列属于外墙面砖施工验收主控项目的有（ ）。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"饰面砖的品种、规格、颜色和性能应符合设计要求",{"key":24,"text":429,"correct":22},"饰面砖粘贴工程的找平、防水、粘结和勾缝材料及施工方法应符合设计要求及国家现行产品标准和工程技术标准的规定",{"key":27,"text":431,"correct":22},"饰面砖粘贴必须牢固",{"key":30,"text":433,"correct":22},"满粘法施工的饰面砖工程应无空鼓、裂缝",{"key":33,"text":435,"correct":61},"饰面砖表面应平整、洁净、色泽一致，无裂痕和缺损","ABCD",{"id":438,"libraryId":5,"type":53,"typeLabel":54,"stem":439,"options":440,"answer":20,"analysis":36},1260857,"图纸交底指（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"使施工人员了解工程的设计特点、构造做法及要求、使用功能等，以便掌握设计关键，按图施工",{"key":24,"text":444,"correct":61},"使施工人员掌握工程特点、施工方案、任务划分、施工进度、平面布置及各项管理措施等。用先进的技术手段和科学的组织手段完成施工任务",{"key":27,"text":446,"correct":61},"将设计变更的结果及时向管理人员和施工人员说明，避免施工差错，便于经济核算",{"key":30,"text":448,"correct":61},"施工工艺、规范和规程要求、材料使用、质量标准及技术安全措施等。对新技术、新材料、新结构、新工艺、关键部位及特殊要求，要着重交代，必要时做示范",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":461,"analysis":36},1260858,"确定施工流向时，工程各部位的繁简程度，哪些部位应优先施工（ ）。",[453,455,457,458,460],{"key":20,"text":454,"correct":22},"技术复杂",{"key":24,"text":456,"correct":22},"施工进度较慢",{"key":27,"text":381,"correct":22},{"key":30,"text":459,"correct":61},"体型复杂",{"key":33,"text":377,"correct":61},"ABC",{"id":463,"libraryId":5,"type":53,"typeLabel":54,"stem":464,"options":465,"answer":30,"analysis":36},1260859,"室内装饰装修原则不包括哪种方式（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":61},"有自上而下",{"key":24,"text":469,"correct":61},"自下而上",{"key":27,"text":471,"correct":61},"自中而下再自上而中",{"key":30,"text":473,"correct":22},"自上下而中",{"id":475,"libraryId":5,"type":53,"typeLabel":54,"stem":476,"options":477,"answer":27,"analysis":36},1260860,"通风口应高出屋面（ ）mm，但必须大于最大积雪厚度。",[478,479,480,481],{"key":20,"text":151,"correct":61},{"key":24,"text":403,"correct":61},{"key":27,"text":405,"correct":22},{"key":30,"text":407,"correct":61},{"id":483,"libraryId":5,"type":53,"typeLabel":54,"stem":484,"options":485,"answer":24,"analysis":36},1260861,"外墙贴面砖工程的施工程序为（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":61},"抹底子灰→排砖、弹线分格→选砖、浸砖→镶贴面砖→擦缝。",{"key":24,"text":489,"correct":22},"基层处理、抹底子灰→排砖、弹线分格→选砖、浸砖→镶贴面砖→擦缝。",{"key":27,"text":491,"correct":61},"基层处理、抹底子灰→选砖、浸砖→镶贴面砖→擦缝。",{"key":30,"text":493,"correct":61},"基层处理、抹底子灰→排砖、弹线分格→→镶贴面砖→擦缝。",{"id":495,"libraryId":5,"type":53,"typeLabel":54,"stem":496,"options":497,"answer":24,"analysis":36},1260862,"轻钢龙骨吊顶内敷设线槽应单独设置吊具，吊杆直径不小于（ ）mm。",[498,499,500,501],{"key":20,"text":122,"correct":61},{"key":24,"text":124,"correct":22},{"key":27,"text":126,"correct":61},{"key":30,"text":128,"correct":61},{"id":503,"libraryId":5,"type":53,"typeLabel":54,"stem":504,"options":505,"answer":24,"analysis":36},1260863,"一般抹灰工程质量的允许偏差，普通抹灰表面平整度为（ ）mm。",[506,508,510,512],{"key":20,"text":507,"correct":61},"3",{"key":24,"text":509,"correct":22},"4",{"key":27,"text":511,"correct":61},"5",{"key":30,"text":513,"correct":61},"2",{"id":515,"libraryId":5,"type":53,"typeLabel":54,"stem":516,"options":517,"answer":27,"analysis":36},1260864,"建筑装饰工程的施工程序不包括下面哪项（ ）。",[518,519,520,521],{"key":20,"text":134,"correct":61},{"key":24,"text":136,"correct":61},{"key":27,"text":138,"correct":22},{"key":30,"text":140,"correct":61},{"id":523,"libraryId":5,"type":166,"typeLabel":167,"stem":524,"options":525,"answer":173,"analysis":36},1260865,"编制装饰装修施工组织设计的施工平面布置图时，不需考虑相邻的地下既有建（构）筑物。",[526,527],{"key":20,"text":171,"correct":61},{"key":24,"text":173,"correct":22},{"id":529,"libraryId":5,"type":53,"typeLabel":54,"stem":530,"options":531,"answer":24,"analysis":36},1260866,"混凝土及抹灰面溶剂型涂料的施工中，作业环境温度不低于10℃，相对湿度不宜大于（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":61},"50%",{"key":24,"text":535,"correct":22},"60%",{"key":27,"text":537,"correct":61},"75%",{"key":30,"text":539,"correct":61},"85%",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":461,"analysis":36},1260867,"抹灰工程验收中，属于主控项目的有（ ）",[544,546,548,550,552],{"key":20,"text":545,"correct":22},"抹灰前基层表面的尘土、污垢、油渍等应清除干净，并应洒水润湿",{"key":24,"text":547,"correct":22},"一般抹灰所用材料的品种和性能应符合设计要求。水泥的凝结时间和安定性复验应合格。砂浆的配合比应符合设计要求",{"key":27,"text":549,"correct":22},"抹灰层与基层之间及各抹灰层之间必须粘结牢固，抹灰层应无脱层、空鼓，面层应无爆灰和裂缝",{"key":30,"text":551,"correct":61},"普通抹灰表面应光滑、洁净、接槎平整，分格缝应清晰",{"key":33,"text":553,"correct":61},"高级抹灰表面应光滑、洁净、颜色均匀、无抹纹，分格缝和灰线应清晰美观",{"id":555,"libraryId":5,"type":53,"typeLabel":54,"stem":556,"options":557,"answer":30,"analysis":36},1260868,"分项工程技术交底指（ ）。",[558,559,560,561],{"key":20,"text":442,"correct":61},{"key":24,"text":444,"correct":61},{"key":27,"text":446,"correct":61},{"key":30,"text":448,"correct":22},{"id":563,"libraryId":5,"type":53,"typeLabel":54,"stem":564,"options":565,"answer":20,"analysis":36},1260869,"导线之间与导线对地之间的绝缘电阻值必须大于（ ）兆欧姆。",[566,568,570,572],{"key":20,"text":567,"correct":22},"0.5",{"key":24,"text":569,"correct":61},"1",{"key":27,"text":571,"correct":61},"1.5",{"key":30,"text":513,"correct":61},{"id":574,"libraryId":5,"type":53,"typeLabel":54,"stem":575,"options":576,"answer":27,"analysis":36},1260870,"待混凝土垫层强度达到（ ）Mpa后，方可进行面层施工。",[577,578,579,581],{"key":20,"text":513,"correct":61},{"key":24,"text":571,"correct":61},{"key":27,"text":580,"correct":22},"1.2",{"key":30,"text":582,"correct":61},"2.5",{"id":584,"libraryId":5,"type":53,"typeLabel":54,"stem":585,"options":586,"answer":27,"analysis":36},1260871,"下列属于实施性进度计划的是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":61},"控制性进度计划",{"key":24,"text":590,"correct":61},"施工总进度计划",{"key":27,"text":592,"correct":22},"月度施工季度计划",{"key":30,"text":594,"correct":61},"横道进度计划",[596,599,602,605,608,611],{"id":53,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":53},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":53},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":53},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]