[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,3,50,1193,[13,27,33,39,45,51,57,77,92,107,120,135,150,165,180,194,208,220,234,244,259,274,288,302,314,326,341,353,365,371,383,398,410,416,422,436,448,454,465,475,487,499,511,523,535,547,561,567,579,588],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":20,"analysis":26},1260772,"判断题","建筑装饰装修工程方案的内容，主要包括施工方法和施工机械的选择、施工段的划分、施工开展的顺序以及流水施工的组织安排。",[18,22],{"key":19,"text":20,"correct":21},"A","正确",true,{"key":23,"text":24,"correct":25},"B","错误",false,"",{"id":28,"libraryId":5,"type":9,"typeLabel":15,"stem":29,"options":30,"answer":20,"analysis":26},1260773,"将基体或基层表面的污垢、尘土清除干净，基层面不得有飞刺、麻点、砂粒和裂缝。",[31,32],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":25},{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":20,"analysis":26},1260774,"技术交底应根据工程规模和技术复杂程度不同采取相应的方法。",[37,38],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":25},{"id":40,"libraryId":5,"type":9,"typeLabel":15,"stem":41,"options":42,"answer":20,"analysis":26},1260775,"进入现场的卫生器具、配件必须具有中文质量合格证明文件、规格、型号及性能检测报告，应符合国家技术标准或设计要求。",[43,44],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":25},{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":20,"analysis":26},1260776,"对于达到一定规模、危险性较大的工程，需要单独编制专项施工方案。",[49,50],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":25},{"id":52,"libraryId":5,"type":9,"typeLabel":15,"stem":53,"options":54,"answer":20,"analysis":26},1260777,"整体楼地面垫层施工工艺要求：用混凝土搅拌机进行强制搅拌，搅拌时间不小于2min。",[55,56],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":25},{"id":58,"libraryId":5,"type":59,"typeLabel":60,"stem":61,"options":62,"answer":76,"analysis":26},1260778,2,"多选题","项目部施工员配合项目经理编制施工组织设计的内容有（ ）。",[63,65,67,70,73],{"key":19,"text":64,"correct":21},"安全",{"key":23,"text":66,"correct":25},"成本",{"key":68,"text":69,"correct":21},"C","进度",{"key":71,"text":72,"correct":21},"D","技术",{"key":74,"text":75,"correct":21},"E","施工方案","ACDE",{"id":78,"libraryId":5,"type":59,"typeLabel":60,"stem":79,"options":80,"answer":91,"analysis":26},1260779,"装饰工程的质量管理计划应包含的内容有（ ）。",[81,83,85,87,89],{"key":19,"text":82,"correct":25},"创优质工程计划",{"key":23,"text":84,"correct":21},"质量目标",{"key":68,"text":86,"correct":21},"质量管理组织机构",{"key":71,"text":88,"correct":21},"技术保障和资源保障措施",{"key":74,"text":90,"correct":25},"质量检查制度和质量保修管理计划","BCD",{"id":93,"libraryId":5,"type":59,"typeLabel":60,"stem":94,"options":95,"answer":106,"analysis":26},1260780,"确定施工顺序的基本原则有（ ）。",[96,98,100,102,104],{"key":19,"text":97,"correct":21},"符合施工工艺的要求",{"key":23,"text":99,"correct":21},"房间的使用功能和施工方法要协调一致",{"key":68,"text":101,"correct":21},"考虑施工组织的要求",{"key":71,"text":103,"correct":21},"考虑施工的安全因素",{"key":74,"text":105,"correct":21},"考虑气候条件","ABCDE",{"id":108,"libraryId":5,"type":59,"typeLabel":60,"stem":109,"options":110,"answer":106,"analysis":26},1260781,"关于单位工程装饰装修工程施工组织设计的内容一般应包括（ ）。",[111,113,114,116,118],{"key":19,"text":112,"correct":21},"工程概况",{"key":23,"text":75,"correct":21},{"key":68,"text":115,"correct":21},"施工进度计划",{"key":71,"text":117,"correct":21},"施工准备工作及各项资源需要量计划",{"key":74,"text":119,"correct":21},"施工平面图",{"id":121,"libraryId":5,"type":59,"typeLabel":60,"stem":122,"options":123,"answer":134,"analysis":26},1260782,"编制装饰工程施工组织设计的依据有（ ）。",[124,126,128,130,132],{"key":19,"text":125,"correct":21},"合同",{"key":23,"text":127,"correct":21},"施工图纸及有关说明",{"key":68,"text":129,"correct":21},"施工预算文件",{"key":71,"text":131,"correct":21},"施工现场条件",{"key":74,"text":133,"correct":25},"设计变更通知","ABCD",{"id":136,"libraryId":5,"type":59,"typeLabel":60,"stem":137,"options":138,"answer":149,"analysis":26},1260783,"技术交底分为（ ）。",[139,141,143,145,147],{"key":19,"text":140,"correct":21},"口头交底",{"key":23,"text":142,"correct":25},"设计变更交底",{"key":68,"text":144,"correct":21},"书面交底",{"key":71,"text":146,"correct":25},"施工组织设计交底",{"key":74,"text":148,"correct":21},"样板交底","ACE",{"id":151,"libraryId":5,"type":59,"typeLabel":60,"stem":152,"options":153,"answer":164,"analysis":26},1260784,"卫生洁具安装施工验收主控项目：（ ）。",[154,156,158,160,162],{"key":19,"text":155,"correct":21},"排水栓和地漏的安装应平正、牢固，低于排水表面，周边无渗漏，地漏水封高度不得小于50mm",{"key":23,"text":157,"correct":21},"卫生器具交工前应满水和通水试验",{"key":68,"text":159,"correct":25},"有饰面的浴盆，应留有通向浴盆排水口的检修门",{"key":71,"text":161,"correct":25},"小便槽冲洗管，应采用镀锌钢管或硬质塑料管。冲洗孔应斜向下方安装，冲洗水流同墙面成45°角。镀锌钢管钻孔后应进行二次镀锌",{"key":74,"text":163,"correct":25},"卫生器具的支、托架必须防腐良好，安装平整、牢固，与器具接触紧密、平稳","AB",{"id":166,"libraryId":5,"type":59,"typeLabel":60,"stem":167,"options":168,"answer":179,"analysis":26},1260785,"属于建筑装饰装修工程施工的有哪些（ ）。",[169,171,173,175,177],{"key":19,"text":170,"correct":21},"墙面装饰",{"key":23,"text":172,"correct":21},"门窗工程",{"key":68,"text":174,"correct":21},"楼地面工程",{"key":71,"text":176,"correct":25},"主体工程",{"key":74,"text":178,"correct":25},"基础工程","ABC",{"id":181,"libraryId":5,"type":59,"typeLabel":60,"stem":182,"options":183,"answer":134,"analysis":26},1260786,"软包施工验收主控项目：（ ）。",[184,186,188,190,192],{"key":19,"text":185,"correct":21},"软包面料、内衬材料及边框的材质、颜色、图案、燃烧性能等级和木材的含水率应符合设计要求及国家现行标准的有关规定",{"key":23,"text":187,"correct":21},"软包工程的安装位置及构造做法应符合设计要求",{"key":68,"text":189,"correct":21},"软包工程的龙骨、衬板、边框应安装牢固，无翘曲，拼缝应平直",{"key":71,"text":191,"correct":21},"单块软包面料不应有接缝，四周应绷压严密",{"key":74,"text":193,"correct":25},"软包工程表面应平整、洁净，无凹凸不平及皱折；图案应清晰、无色差，整体应协调美观",{"id":195,"libraryId":5,"type":59,"typeLabel":60,"stem":196,"options":197,"answer":179,"analysis":26},1260787,"实木地板地面主控项目有（ ）。",[198,200,202,204,206],{"key":19,"text":199,"correct":21},"实木地板面层所采用的材质和铺设时的木材含水率必须符合设计要求；木格栅（木龙骨基架）、垫木及胶合板等必须做防腐、防蛀处理",{"key":23,"text":201,"correct":21},"木搁栅（木龙骨基架及基层板）安装应牢固、平直",{"key":68,"text":203,"correct":21},"实木地板面层铺设应牢固；粘结无空鼓",{"key":71,"text":205,"correct":25},"实木地板面层应刨平磨光，无明显刨痕和毛刺等现象；图案清晰，颜色均匀一致",{"key":74,"text":207,"correct":25},"面层缝隙应严密；接头位置应错开、表面洁净",{"id":209,"libraryId":5,"type":59,"typeLabel":60,"stem":210,"options":211,"answer":76,"analysis":26},1260788,"技术交底的内容包括哪些（ ）。",[212,214,216,217,218],{"key":19,"text":213,"correct":21},"图纸交底",{"key":23,"text":215,"correct":25},"安全交底",{"key":68,"text":146,"correct":21},{"key":71,"text":142,"correct":21},{"key":74,"text":219,"correct":21},"分项工程技术交底",{"id":221,"libraryId":5,"type":59,"typeLabel":60,"stem":222,"options":223,"answer":149,"analysis":26},1260789,"室内装饰装修工程，施工施工顺序应根据具体条件来确定，基本原则有（ ）。",[224,226,228,230,232],{"key":19,"text":225,"correct":21},"先湿作业、后于作业",{"key":23,"text":227,"correct":25},"先下后上",{"key":68,"text":229,"correct":21},"先墙顶、后地面",{"key":71,"text":231,"correct":25},"先外后内",{"key":74,"text":233,"correct":21},"先管线、后饰面",{"id":235,"libraryId":5,"type":59,"typeLabel":60,"stem":236,"options":237,"answer":243,"analysis":26},1260790,"室内装饰装修工程，施工施工顺序应根据具体条件来确定，基本原则不包括（ ）。",[238,239,240,241,242],{"key":19,"text":225,"correct":25},{"key":23,"text":227,"correct":21},{"key":68,"text":229,"correct":25},{"key":71,"text":231,"correct":21},{"key":74,"text":233,"correct":25},"BD",{"id":245,"libraryId":5,"type":59,"typeLabel":60,"stem":246,"options":247,"answer":258,"analysis":26},1260791,"建筑装饰工程的施工程序一般有哪几种程序（ ）。",[248,250,252,254,256],{"key":19,"text":249,"correct":21},"先室外后室内",{"key":23,"text":251,"correct":21},"先室内后室外",{"key":68,"text":253,"correct":25},"先上后下",{"key":71,"text":255,"correct":21},"室内外同时",{"key":74,"text":257,"correct":25},"上下同时进行","ABD",{"id":260,"libraryId":5,"type":59,"typeLabel":60,"stem":261,"options":262,"answer":273,"analysis":26},1260792,"单位的装饰装修工程施工组织设计编制时，必须编制的措施有（ ）。",[263,265,267,269,271],{"key":19,"text":264,"correct":21},"质量保证措施",{"key":23,"text":266,"correct":21},"安全、文明施工措施",{"key":68,"text":268,"correct":25},"材料加工翻样",{"key":71,"text":270,"correct":21},"降低成本措施",{"key":74,"text":272,"correct":21},"成品保护措施","ABDE",{"id":275,"libraryId":5,"type":59,"typeLabel":60,"stem":276,"options":277,"answer":164,"analysis":26},1260793,"板块地面主控项目有（ ）。",[278,280,282,284,286],{"key":19,"text":279,"correct":21},"砖面层材料的品种、规格、颜色、质量必须符合设计要求",{"key":23,"text":281,"correct":21},"面层与下一层的结合（粘结）应牢固，无空鼓",{"key":68,"text":283,"correct":25},"砖面层应洁净，图案清晰，色泽一致，接缝平整，深浅一致，周边顺直。地面砖无裂纹、无缺棱掉角等缺陷，套割粘贴严密、美观",{"key":71,"text":285,"correct":25},"地砖留缝宽度、深度、勾缝材料颜色均应符合设计要求及规范的有关规定",{"key":74,"text":287,"correct":25},"踢脚线表面应洁净，高度一致，结合牢固，出墙厚度一致",{"id":289,"libraryId":5,"type":290,"typeLabel":291,"stem":292,"options":293,"answer":71,"analysis":26},1260794,1,"单选题","管道支架安装方法：管道沿柱子安装时，可用（ ）安装支架。",[294,296,298,300],{"key":19,"text":295,"correct":25},"裁埋法",{"key":23,"text":297,"correct":25},"膨胀螺栓法",{"key":68,"text":299,"correct":25},"射钉法",{"key":71,"text":301,"correct":21},"抱柱法",{"id":303,"libraryId":5,"type":290,"typeLabel":291,"stem":304,"options":305,"answer":68,"analysis":26},1260795,"裱糊工程基体或基层的含水率：混凝土和抹灰不得大于（ ）。",[306,308,310,312],{"key":19,"text":307,"correct":25},"10%",{"key":23,"text":309,"correct":25},"15%",{"key":68,"text":311,"correct":21},"8%",{"key":71,"text":313,"correct":25},"12%",{"id":315,"libraryId":5,"type":290,"typeLabel":291,"stem":316,"options":317,"answer":23,"analysis":26},1260796,"接线盒内的导线预留长度不应超过（ ）mm，盘、箱内的导线预留长度应为其周长的1\u002F2。",[318,320,322,324],{"key":19,"text":319,"correct":25},"100",{"key":23,"text":321,"correct":21},"150",{"key":68,"text":323,"correct":25},"200",{"key":71,"text":325,"correct":25},"250",{"id":327,"libraryId":5,"type":59,"typeLabel":60,"stem":328,"options":329,"answer":340,"analysis":26},1260797,"属于装饰抹灰的有（ ）。",[330,332,334,336,338],{"key":19,"text":331,"correct":25},"纸筋灰面层",{"key":23,"text":333,"correct":21},"水刷石",{"key":68,"text":335,"correct":21},"斩假石",{"key":71,"text":337,"correct":21},"干粘石",{"key":74,"text":339,"correct":21},"假面砖","BCDE",{"id":342,"libraryId":5,"type":290,"typeLabel":291,"stem":343,"options":344,"answer":23,"analysis":26},1260798,"施工组织设计交底错误的是（ ）。",[345,347,349,351],{"key":19,"text":346,"correct":25},"使施工人员了解工程的设计特点、构造做法及要求、使用功能等，以便掌握设计关键，按图施工",{"key":23,"text":348,"correct":21},"使施工人员掌握工程特点、施工方案、任务划分、施工进度、平面布置及各项管理措施等。用先进的技术手段和科学的组织手段完成施工任务",{"key":68,"text":350,"correct":25},"将设计变更的结果及时向管理人员和施工人员说明，避免施工差错，便于经济核算",{"key":71,"text":352,"correct":25},"施工工艺、规范和规程要求、材料使用、质量标准及技术安全措施等。对新技术、新材料、新结构、新工艺、关键部位及特殊要求，要着重交代，必要时做示范",{"id":354,"libraryId":5,"type":290,"typeLabel":291,"stem":355,"options":356,"answer":68,"analysis":26},1260799,"上人吊顶一般采用UC50中龙骨，吊点间距（ ）mm。",[357,359,361,363],{"key":19,"text":358,"correct":25},"800mm",{"key":23,"text":360,"correct":25},"1000mm",{"key":68,"text":362,"correct":21},"900~1200mm",{"key":71,"text":364,"correct":25},"1000～1500mm",{"id":366,"libraryId":5,"type":9,"typeLabel":15,"stem":367,"options":368,"answer":20,"analysis":26},1260800,"装饰装修工程施工组织设计是规划和指导拟建工程从施工准备到竣工验收全过程施工的技术经济文件。",[369,370],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":25},{"id":372,"libraryId":5,"type":290,"typeLabel":291,"stem":373,"options":374,"answer":68,"analysis":26},1260801,"技术交底时，遇到重要的、难度大的工程项目应该（ ）。",[375,377,379,381],{"key":19,"text":376,"correct":25},"书面交底和口头交底相结合",{"key":23,"text":378,"correct":25},"以样板交底和口头交底相结合",{"key":68,"text":380,"correct":21},"以样板交底、书面交底和口头交底相结合",{"key":71,"text":382,"correct":25},"以样板交底和书面交底相结合",{"id":384,"libraryId":5,"type":59,"typeLabel":60,"stem":385,"options":386,"answer":397,"analysis":26},1260802,"涂饰工程验收中，下列属于主控项目：（ ）。",[387,389,391,393,395],{"key":19,"text":388,"correct":21},"涂料的品种、型号和性能应符合设计要求。",{"key":23,"text":390,"correct":21},"涂料的颜色、图案需符合设计要求。",{"key":68,"text":392,"correct":21},"涂料的涂刷应均匀、粘结牢固，不得漏涂、透底、起皮和掉粉。",{"key":71,"text":394,"correct":25},"涂层与其他装修材料和设备衔接处应吻合，界面应清晰。",{"key":74,"text":396,"correct":21},"基层处理应符合现行国家标准《建筑装饰装修工程质量验收规范》GB50210—2001的规定","ABCE",{"id":399,"libraryId":5,"type":290,"typeLabel":291,"stem":400,"options":401,"answer":23,"analysis":26},1260803,"水表外壳距墙表面净距为（ ）mm。",[402,404,406,408],{"key":19,"text":403,"correct":25},"5～10",{"key":23,"text":405,"correct":21},"10～30",{"key":68,"text":407,"correct":25},"10～20",{"key":71,"text":409,"correct":25},"20～30",{"id":411,"libraryId":5,"type":9,"typeLabel":15,"stem":412,"options":413,"answer":24,"analysis":26},1260804,"涂刷顺序是先刷顶棚后刷墙面，墙面是先上后下，先右后左操作。",[414,415],{"key":19,"text":20,"correct":25},{"key":23,"text":24,"correct":21},{"id":417,"libraryId":5,"type":9,"typeLabel":15,"stem":418,"options":419,"answer":20,"analysis":26},1260805,"特种门每个检验批应至少抽查50%，并不得少于10樘，不足10樘时应全数检查。",[420,421],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":25},{"id":423,"libraryId":5,"type":59,"typeLabel":60,"stem":424,"options":425,"answer":179,"analysis":26},1260806,"轻钢龙骨隔断施工，纸面石膏板接缝做法有（ ）。",[426,428,430,432,434],{"key":19,"text":427,"correct":21},"平缝",{"key":23,"text":429,"correct":21},"凹缝",{"key":68,"text":431,"correct":21},"压条缝",{"key":71,"text":433,"correct":25},"焊接",{"key":74,"text":435,"correct":25},"机械连接",{"id":437,"libraryId":5,"type":290,"typeLabel":291,"stem":438,"options":439,"answer":19,"analysis":26},1260807,"一般抹灰工艺为（ ）。",[440,442,444,446],{"key":19,"text":441,"correct":21},"基层处理→吊直、套方、找规矩、贴灰饼→墙面冲筋（设置标筋）→抹底灰→抹中层灰→抹面层灰",{"key":23,"text":443,"correct":25},"基层处理→墙面冲筋（设置标筋）→抹底灰→抹中层灰→抹面层灰",{"key":68,"text":445,"correct":25},"基层处理→吊直、套方、找规矩、贴灰饼→抹底灰→抹中层灰→抹面层灰",{"key":71,"text":447,"correct":25},"基层处理→吊直、套方、找规矩、贴灰饼→墙面冲筋（设置标筋）→抹中层灰→抹面层灰",{"id":449,"libraryId":5,"type":9,"typeLabel":15,"stem":450,"options":451,"answer":24,"analysis":26},1260808,"相邻两根立柱安装标高偏差不应大于3mm，同层立柱的最大标高偏差不应大于3mm。",[452,453],{"key":19,"text":20,"correct":25},{"key":23,"text":24,"correct":21},{"id":455,"libraryId":5,"type":290,"typeLabel":291,"stem":456,"options":457,"answer":71,"analysis":26},1260809,"室内电气系统金属线槽敷设及其配线工程施工工艺流程：（ ）。",[458,460,462,463],{"key":19,"text":459,"correct":25},"测量定位→预留孔洞→支、吊架制作及安装→→线槽安装→保护地线安装→槽内配线→线路绝缘遥测→导线连接",{"key":23,"text":461,"correct":25},"预留孔洞→测量定位→支、吊架制作及安装→→保护地线安装→线槽安装→槽内配线→线路绝缘遥测→导线连接",{"key":68,"text":459,"correct":25},{"key":71,"text":464,"correct":21},"预留空洞→测量定位→支、吊架制作及安装→→线槽安装→保护地线安装→槽内配线→线路绝缘遥测→导线连接",{"id":466,"libraryId":5,"type":290,"typeLabel":291,"stem":467,"options":468,"answer":68,"analysis":26},1260810,"轻钢龙骨隔断施工，石膏板一般用自攻螺钉固定，板边钉距板中间距为（ ）mm。",[469,470,471,473],{"key":19,"text":323,"correct":25},{"key":23,"text":325,"correct":25},{"key":68,"text":472,"correct":21},"300",{"key":71,"text":474,"correct":25},"400",{"id":476,"libraryId":5,"type":290,"typeLabel":291,"stem":477,"options":478,"answer":23,"analysis":26},1260811,"建设项目的装饰装修工程施工组织设计是（ ）。",[479,481,483,485],{"key":19,"text":480,"correct":25},"分部（分项）工程作业计划",{"key":23,"text":482,"correct":21},"单位工程施工组织设计",{"key":68,"text":484,"correct":25},"专项施工方案",{"key":71,"text":486,"correct":25},"施工组织总设计",{"id":488,"libraryId":5,"type":290,"typeLabel":291,"stem":489,"options":490,"answer":19,"analysis":26},1260812,"管道穿越的墙洞和楼板洞，应及时安放套管，并用（ ）水泥砂浆或细石混凝土填塞密实。",[491,493,495,497],{"key":19,"text":492,"correct":21},"1:3",{"key":23,"text":494,"correct":25},"1:2",{"key":68,"text":496,"correct":25},"1:2.5",{"key":71,"text":498,"correct":25},"1:1",{"id":500,"libraryId":5,"type":290,"typeLabel":291,"stem":501,"options":502,"answer":23,"analysis":26},1260813,"室内给水管道的水压试验必须符合设计要求。当设计未注明时，各种材质的给水管道系统试验压力位工作压力的1.5倍，但不得小于（ ）MP A",[503,505,507,509],{"key":19,"text":504,"correct":25},"0.5",{"key":23,"text":506,"correct":21},"0.6",{"key":68,"text":508,"correct":25},"0.7",{"key":71,"text":510,"correct":25},"0.8",{"id":512,"libraryId":5,"type":290,"typeLabel":291,"stem":513,"options":514,"answer":19,"analysis":26},1260814,"采用钢管作为灯具的吊管时，钢管内径一般不小于（ ）mm。",[515,517,519,521],{"key":19,"text":516,"correct":21},"10",{"key":23,"text":518,"correct":25},"12",{"key":68,"text":520,"correct":25},"14",{"key":71,"text":522,"correct":25},"16",{"id":524,"libraryId":5,"type":290,"typeLabel":291,"stem":525,"options":526,"answer":19,"analysis":26},1260815,"室内排水管道及配件安装施工工艺流程：（ ）。",[527,529,531,533],{"key":19,"text":528,"correct":21},"安装准备→预制加工→支架安装→干管安装→立管安装→支管安装→封口堵洞→闭水实验",{"key":23,"text":530,"correct":25},"预制加工→安装准备→支架安装→干管安装→立管安装→支管安装→封口堵洞→闭水实验",{"key":68,"text":532,"correct":25},"预制加工→安装准备→干管安装→支架安装→立管安装→支管安装→封口堵洞→闭水实验",{"key":71,"text":534,"correct":25},"预制加工→安装准备→支架安装→立管安装→干管安装→支管安装→封口堵洞→闭水实验",{"id":536,"libraryId":5,"type":290,"typeLabel":291,"stem":537,"options":538,"answer":23,"analysis":26},1260816,"室内装饰装修原则包括哪种方式（ ）。",[539,541,543,545],{"key":19,"text":540,"correct":25},"自上下而中、自下而上及自中而下再自上而中三种",{"key":23,"text":542,"correct":21},"自上而下、自下而上及自中而下再自上而中三种",{"key":68,"text":544,"correct":25},"自上而下、自上下而中及自中而下再自上而中三种",{"key":71,"text":546,"correct":25},"自上下而中自上而下、自下而上及自中而下再自上而中三种",{"id":548,"libraryId":5,"type":59,"typeLabel":60,"stem":549,"options":550,"answer":273,"analysis":26},1260817,"设备安装与装饰工程中的施工顺序正确的有（ ）。",[551,553,555,557,559],{"key":19,"text":552,"correct":21},"先进行设备管线的安装，再进行建筑装饰装修工程的施工",{"key":23,"text":554,"correct":21},"在预埋阶段，先通风、后水暖管道、再电器线路",{"key":68,"text":556,"correct":25},"总的规律是封闭+预埋+装饰",{"key":71,"text":558,"correct":21},"封闭阶段，先墙面、后顶面、再地面",{"key":74,"text":560,"correct":21},"装饰阶段，先油漆、后裱糊、再面板",{"id":562,"libraryId":5,"type":9,"typeLabel":15,"stem":563,"options":564,"answer":24,"analysis":26},1260818,"根据工程的复杂程度，有些项目不可以合并或简单编写。",[565,566],{"key":19,"text":20,"correct":25},{"key":23,"text":24,"correct":21},{"id":568,"libraryId":5,"type":290,"typeLabel":291,"stem":569,"options":570,"answer":23,"analysis":26},1260819,"单位工程施工组织设计是（ ）。",[571,573,575,577],{"key":19,"text":572,"correct":25},"以单项工程为对象编制的",{"key":23,"text":574,"correct":21},"以单位工程为对象编制的",{"key":68,"text":576,"correct":25},"以分部工程为对象编制的",{"key":71,"text":578,"correct":25},"以分项工程为对象编制的",{"id":580,"libraryId":5,"type":290,"typeLabel":291,"stem":581,"options":582,"answer":23,"analysis":26},1260820,"除敞开式灯具外，其他各类灯具灯泡容量在（ ）W及以上者采用瓷质灯头。",[583,585,586,587],{"key":19,"text":584,"correct":25},"50",{"key":23,"text":319,"correct":21},{"key":68,"text":321,"correct":25},{"key":71,"text":323,"correct":25},{"id":589,"libraryId":5,"type":9,"typeLabel":15,"stem":590,"options":591,"answer":20,"analysis":26},1260821,"单位工程施工组织设计是施工单位编制分部（分项）工程施工组织设计和季、月、旬施工计划的依据。",[592,593],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":25},[595,598,601,604,607,610],{"id":290,"name":596,"category":7,"favorite":597},"领导干部任职前廉政法规知识测试题",92,{"id":599,"name":600,"category":7,"favorite":290},595,"建筑结构与设备",{"id":602,"name":603,"category":7,"favorite":290},715,"招标采购专业知识与法律法规",{"id":605,"name":606,"category":7,"favorite":290},848,"市政方向-通用基础",{"id":608,"name":609,"category":7,"favorite":8},534,"BIM工程师",{"id":611,"name":609,"category":7,"favorite":8},535]