[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":525},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,2,50,1193,[13,34,46,58,70,82,94,106,117,129,140,151,162,174,186,198,210,220,232,240,252,264,276,285,297,308,320,332,344,356,368,376,388,400,408,420,428,439,449,459,465,471,477,483,489,495,501,507,513,519],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1260722,1,"单选题","当灯具距地面高度小于（ ）m时，灯具的可接近裸露导体必须接地（P E）或接零（PEN）可靠，并应有专用接地螺栓，且有标识。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","2",false,{"key":24,"text":25,"correct":22},"B","2.2",{"key":27,"text":28,"correct":29},"C","2.4",true,{"key":31,"text":32,"correct":22},"D","2.8","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1260723,"设计变更交底指（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"使施工人员了解工程的设计特点、构造做法及要求、使用功能等，以便掌握设计关键，按图施工",{"key":24,"text":41,"correct":22},"使施工人员掌握工程特点、施工方案、任务划分、施工进度、平面布置及各项管理措施等。用先进的技术手段和科学的组织手段完成施工任务",{"key":27,"text":43,"correct":29},"将设计变更的结果及时向管理人员和施工人员说明，避免施工差错，便于经济核算",{"key":31,"text":45,"correct":22},"施工工艺、规范和规程要求、材料使用、质量标准及技术安全措施等。对新技术、新材料、新结构、新工艺、关键部位及特殊要求，要着重交代，必要时做示范",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1260724,"外墙贴面砖工程的施工中，用面砖做灰饼，找出墙面、柱面、门窗套等横竖标准，阳角处要双面排直，灰饼间距不应大于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"2m",{"key":24,"text":53,"correct":22},"3m",{"key":27,"text":55,"correct":29},"1.5m",{"key":31,"text":57,"correct":22},"2.5m",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1260725,"抹灰工程中，加气混凝土砌块、混凝土空心砌块墙体双面满铺钢丝网，并与梁、柱、剪力墙界面搭接宽（ ）mm。",[62,64,66,68],{"key":20,"text":63,"correct":22},"200",{"key":24,"text":65,"correct":22},"300",{"key":27,"text":67,"correct":29},"100",{"key":31,"text":69,"correct":22},"250",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1260726,"单芯线并接头：首先将导线绝缘台并齐合拢。然后在距绝缘台约（ ）mm处用其中一根线芯在其连接端缠绕5～7圈后剪断，把余头并齐折回压在缠绕线上。",[74,76,78,80],{"key":20,"text":75,"correct":22},"8",{"key":24,"text":77,"correct":22},"10",{"key":27,"text":79,"correct":29},"12",{"key":31,"text":81,"correct":22},"14",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1260727,"确定室内装饰主要项目施工顺序，说法错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"先湿作业后装饰",{"key":24,"text":89,"correct":22},"先楼上后楼下",{"key":27,"text":91,"correct":29},"先近后远",{"key":31,"text":93,"correct":22},"先顶、墙面后地面",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1260728,"编制施工组织设计应首先进行的工作是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"了解投标报价",{"key":24,"text":101,"correct":22},"现场准备",{"key":27,"text":103,"correct":29},"熟悉施工图纸",{"key":31,"text":105,"correct":22},"熟悉施工合同",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1260729,"照明灯具使用的导线其电压等级不应低于交流（ ）V，其最小线芯截面应符合规定。",[110,111,113,115],{"key":20,"text":65,"correct":22},{"key":24,"text":112,"correct":22},"400",{"key":27,"text":114,"correct":29},"500",{"key":31,"text":116,"correct":22},"600",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1260730,"（ ）接受交底后，必要时，需做示范操作或做样板。",[121,123,125,127],{"key":20,"text":122,"correct":22},"公司总工程师",{"key":24,"text":124,"correct":22},"分公司主任工程师或项目部的技术负责人",{"key":27,"text":126,"correct":29},"工长",{"key":31,"text":128,"correct":22},"班组长",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":27,"analysis":33},1260731,"在转角小于（ ）度的污水横管上，应设置检查口或清扫口。",[133,134,136,138],{"key":20,"text":67,"correct":22},{"key":24,"text":135,"correct":22},"120",{"key":27,"text":137,"correct":29},"135",{"key":31,"text":139,"correct":22},"150",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":27,"analysis":33},1260732,"给水管应铺在排水管上面，若给水管必须铺在排水管的下面时，给水管应加套管，其长度不得小于排水管管径的（ ）倍。",[144,146,147,149],{"key":20,"text":145,"correct":22},"1",{"key":24,"text":21,"correct":22},{"key":27,"text":148,"correct":29},"3",{"key":31,"text":150,"correct":22},"4",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},1260733,"当钢管做灯杆时，钢管内径不小于（ ）mm，钢管厚度不应小于（ ）mm。",[155,157,159,161],{"key":20,"text":156,"correct":22},"81.5",{"key":24,"text":158,"correct":22},"101.8",{"key":27,"text":160,"correct":29},"101.5",{"key":31,"text":156,"correct":22},{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":27,"analysis":33},1260734,"滴水线（槽）应整齐顺直，滴水线应内高外低，滴水槽的宽度和深度均不应小于（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"8mm",{"key":24,"text":169,"correct":22},"9mm",{"key":27,"text":171,"correct":29},"10mm",{"key":31,"text":173,"correct":22},"11mm",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":27,"analysis":33},1260735,"主龙骨应从吊顶中心向两边分，最大间距为（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"800mm",{"key":24,"text":181,"correct":22},"900mm",{"key":27,"text":183,"correct":29},"1000mm",{"key":31,"text":185,"correct":22},"1100mm",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":27,"analysis":33},1260736,"当抹灰总厚度大于或等于（ ）时，应采取加强措施。",[190,192,194,196],{"key":20,"text":191,"correct":22},"25mm",{"key":24,"text":193,"correct":22},"30mm",{"key":27,"text":195,"correct":29},"35mm",{"key":31,"text":197,"correct":22},"40mm",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},1260737,"下列哪项符合裱糊工程施工工艺的要求（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"要先进行面层的处理，再实施裱糊",{"key":24,"text":205,"correct":22},"要先实施裱糊，再进行面层的处理",{"key":27,"text":207,"correct":29},"要先进行基层的处理，再实施裱糊",{"key":31,"text":209,"correct":22},"要先进行基层的处理，再实施喷涂",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},1260738,"电线在线槽内有一定余量，不得有接头。电线按回路编号分段绑扎，绑扎点间距不应大于（ ）m。",[214,215,217,218],{"key":20,"text":145,"correct":22},{"key":24,"text":216,"correct":22},"1.5",{"key":27,"text":21,"correct":29},{"key":31,"text":219,"correct":22},"2.5",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":27,"analysis":33},1260739,"管道支架安装方法：（ ）多用于角形横梁在混凝土结构上的安装。",[224,226,228,230],{"key":20,"text":225,"correct":22},"裁埋法",{"key":24,"text":227,"correct":22},"膨胀螺栓法",{"key":27,"text":229,"correct":29},"射钉法",{"key":31,"text":231,"correct":22},"抱柱法",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":27,"analysis":33},1260740,"由室内通向室外排水检查井的排水管，井内引入管应高于排出管或两管顶相平，并有不小于90度的水流转角，如跌落差大于（ ）mm可不受角度限制。",[236,237,238,239],{"key":20,"text":67,"correct":22},{"key":24,"text":63,"correct":22},{"key":27,"text":65,"correct":29},{"key":31,"text":112,"correct":22},{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":27,"analysis":33},1260741,"下列哪项属于建筑装饰装修工程施工（ ）。",[244,246,248,250],{"key":20,"text":245,"correct":22},"基础工程",{"key":24,"text":247,"correct":22},"设备工程",{"key":27,"text":249,"correct":29},"楼地面工程",{"key":31,"text":251,"correct":22},"主体工程",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":27,"analysis":33},1260742,"装饰装修工程施工组织设计是（ ）的一项重要准备工作，也是施工企业实现生产科学管理的重要手段。",[256,258,260,262],{"key":20,"text":257,"correct":22},"施工中",{"key":24,"text":259,"correct":22},"施工后",{"key":27,"text":261,"correct":29},"施工前",{"key":31,"text":263,"correct":22},"进场前",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":27,"analysis":33},1260743,"施工现场平面图应按照有关规范规定并结合（ ），按照不同施工阶段分别进行绘制。",[268,270,272,274],{"key":20,"text":269,"correct":22},"施工组织设计",{"key":24,"text":271,"correct":22},"施工专项方案",{"key":27,"text":273,"correct":29},"施工组织总设计",{"key":31,"text":275,"correct":22},"施工进度计划",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":31,"analysis":33},1260744,"土建模板已拆除，操作场地清理干净，管道安装高度超过（ ）m应搭好架子。",[280,281,282,283],{"key":20,"text":21,"correct":22},{"key":24,"text":219,"correct":22},{"key":27,"text":148,"correct":22},{"key":31,"text":284,"correct":29},"3.5",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},1260745,"确定施工流向时，工程各部位的繁简程度，哪些部位应适当靠后施工（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"技术复杂",{"key":24,"text":292,"correct":22},"施工进度较慢",{"key":27,"text":294,"correct":22},"工期较长",{"key":31,"text":296,"correct":29},"体型复杂",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},1260746,"爆炸危险环境照明线路的电线额定电压不得低于（ ）V，且电线必须穿于钢导管内。",[301,302,304,306],{"key":20,"text":116,"correct":22},{"key":24,"text":303,"correct":22},"650",{"key":27,"text":305,"correct":22},"700",{"key":31,"text":307,"correct":29},"750",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},1260747,"施工组织总设计是以（ ）为施工组织对象进行编制的。",[312,314,316,318],{"key":20,"text":313,"correct":22},"单位",{"key":24,"text":315,"correct":22},"分部（分项）工程",{"key":27,"text":317,"correct":22},"土建工程",{"key":31,"text":319,"correct":29},"群体工程",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},1260748,"整体地面中，水泥砂浆面层的强度不小于（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"M25",{"key":24,"text":327,"correct":22},"M20",{"key":27,"text":329,"correct":22},"M30",{"key":31,"text":331,"correct":29},"M15",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},1260749,"室内普通灯具安装工艺流程：（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"组装灯具→灯具检查→灯具安装→通电试运行",{"key":24,"text":339,"correct":22},"灯具检查→灯具安装→组装灯具→通电试运行",{"key":27,"text":341,"correct":22},"灯具安装→组装灯具→灯具检查→通电试运行",{"key":31,"text":343,"correct":29},"灯具检查→组装灯具→灯具安装→通电试运行",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},1260750,"条板隔墙的门、窗框的安装应在条板隔墙安装完成（ ）后进行。",[348,350,352,354],{"key":20,"text":349,"correct":22},"3天",{"key":24,"text":351,"correct":22},"5天",{"key":27,"text":353,"correct":22},"10天",{"key":31,"text":355,"correct":29},"7天",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},1260751,"外墙贴面砖工程的施工中，石灰膏用于罩面灰，熟化时间不应小于（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"20d",{"key":24,"text":363,"correct":22},"15d",{"key":27,"text":365,"correct":22},"10d",{"key":31,"text":367,"correct":29},"30d",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},1260752,"安装沿顶龙骨和沿地龙骨：按已放好的隔墙位置线，按线安装顶龙骨和地龙骨，用射钉固定于主体上，其射钉钉距为（ ）mm。",[372,373,374,375],{"key":20,"text":65,"correct":22},{"key":24,"text":112,"correct":22},{"key":27,"text":114,"correct":22},{"key":31,"text":116,"correct":29},{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":31,"analysis":33},1260753,"线槽内，导线面积总和（包括绝缘在内）不应超过线槽截面积的（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"10％",{"key":24,"text":383,"correct":22},"20％",{"key":27,"text":385,"correct":22},"30％",{"key":31,"text":387,"correct":29},"40％",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},1260754,"下列哪项不是施工组织设计的编制依据（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":22},"建设项目装饰装修工程施工组织设计",{"key":24,"text":395,"correct":22},"装饰装修工程施工的预算文件及有关定额",{"key":27,"text":397,"correct":22},"装饰装修工程的施工条件",{"key":31,"text":399,"correct":29},"监理单位对工程的意图和要求",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},1260755,"石材钻孔时，将已编好号的饰面板放在操作支架上，用钻在板材上、下两个侧边上钻孔。通常每个侧边打两个孔，当板材宽度较大时，应增加孔数，孔间距应不大于（ ）mm。",[404,405,406,407],{"key":20,"text":65,"correct":22},{"key":24,"text":112,"correct":22},{"key":27,"text":114,"correct":22},{"key":31,"text":116,"correct":29},{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},1260756,"整体地面中，混凝土垫层强度不低于（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"C25",{"key":24,"text":415,"correct":22},"C20",{"key":27,"text":417,"correct":22},"C30",{"key":31,"text":419,"correct":29},"C15",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":31,"analysis":33},1260757,"若污水管起点设置堵头代替清扫口时，与墙面距离不得小于（ ）mm。",[424,425,426,427],{"key":20,"text":67,"correct":22},{"key":24,"text":63,"correct":22},{"key":27,"text":65,"correct":22},{"key":31,"text":112,"correct":29},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1260758,"安装螺翼式水表，表前与阀门应有不小于（ ）倍水表接口直径的直线管段。",[432,434,436,438],{"key":20,"text":433,"correct":22},"5",{"key":24,"text":435,"correct":22},"6",{"key":27,"text":437,"correct":22},"7",{"key":31,"text":75,"correct":29},{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},1260759,"下列哪项不属于建筑装饰装修工程施工（ ）。",[443,445,447,448],{"key":20,"text":444,"correct":22},"墙面装饰",{"key":24,"text":446,"correct":22},"门窗工程",{"key":27,"text":249,"correct":22},{"key":31,"text":251,"correct":29},{"id":450,"libraryId":5,"type":451,"typeLabel":452,"stem":453,"options":454,"answer":458,"analysis":33},1260760,3,"判断题","技术交底是指开工之前由各级技术负责人将有关工程的各项技术要求直接传达到施工现场。",[455,457],{"key":20,"text":456,"correct":22},"正确",{"key":24,"text":458,"correct":29},"错误",{"id":460,"libraryId":5,"type":451,"typeLabel":452,"stem":461,"options":462,"answer":458,"analysis":33},1260761,"当用自攻螺丝钉安装板材时，板材接缝处必须安装在宽度不小于30mm的次龙骨上。",[463,464],{"key":20,"text":456,"correct":22},{"key":24,"text":458,"correct":29},{"id":466,"libraryId":5,"type":451,"typeLabel":452,"stem":467,"options":468,"answer":458,"analysis":33},1260762,"编制装饰装修工程施工组织设计，应根据工程的特点，编制的内容简明扼要，深度、广度要求相同，能真正指导施工即可。",[469,470],{"key":20,"text":456,"correct":22},{"key":24,"text":458,"correct":29},{"id":472,"libraryId":5,"type":451,"typeLabel":452,"stem":473,"options":474,"answer":458,"analysis":33},1260763,"单位工程施工组织设计是以单位工程为对象，是由总包单位编制的。",[475,476],{"key":20,"text":456,"correct":22},{"key":24,"text":458,"correct":29},{"id":478,"libraryId":5,"type":451,"typeLabel":452,"stem":479,"options":480,"answer":458,"analysis":33},1260764,"已放大样并做出粘贴面砖样板墙，经设计部门鉴定合格，经设计及业主共同认可，施工工艺及操作要点已向操作者交底，可进行大面积施工。",[481,482],{"key":20,"text":456,"correct":22},{"key":24,"text":458,"correct":29},{"id":484,"libraryId":5,"type":451,"typeLabel":452,"stem":485,"options":486,"answer":458,"analysis":33},1260765,"装饰装修工程因施工周期较短且在室内施工，在单位工程施工组织设计的编制中，可以不含或简化雨期施工方案。",[487,488],{"key":20,"text":456,"correct":22},{"key":24,"text":458,"correct":29},{"id":490,"libraryId":5,"type":451,"typeLabel":452,"stem":491,"options":492,"answer":458,"analysis":33},1260766,"根据室内高度和抹灰现场的具体情况，提前搭好抹灰操作用的高凳和架子，架子要离开墙面及墙角100～150mm，以便于操作。",[493,494],{"key":20,"text":456,"correct":22},{"key":24,"text":458,"correct":29},{"id":496,"libraryId":5,"type":451,"typeLabel":452,"stem":497,"options":498,"answer":458,"analysis":33},1260767,"编制装饰装修工程现场准备计划时，应根据施工条件和工程实际需要，编制现场生产和临时用水用电设施计划，可不编制临时生活设施的计划。",[499,500],{"key":20,"text":456,"correct":22},{"key":24,"text":458,"correct":29},{"id":502,"libraryId":5,"type":451,"typeLabel":452,"stem":503,"options":504,"answer":458,"analysis":33},1260768,"软包底板所用材料应符合设计要求，一般使用10mm厚胶合板。",[505,506],{"key":20,"text":456,"correct":22},{"key":24,"text":458,"correct":29},{"id":508,"libraryId":5,"type":451,"typeLabel":452,"stem":509,"options":510,"answer":456,"analysis":33},1260769,"分部（分项）工程作业计划是以某些主要的新结构、技术复杂的或缺乏施工经验的分部（分项）工程为对象编制的，直接指导现场施工的专项方案。",[511,512],{"key":20,"text":456,"correct":29},{"key":24,"text":458,"correct":22},{"id":514,"libraryId":5,"type":451,"typeLabel":452,"stem":515,"options":516,"answer":456,"analysis":33},1260770,"现代装饰装修工程中，除包括墙、顶、地面、门窗工程等分部（子分部）工程外，还应考虑家具、陈设、厨餐用具等。",[517,518],{"key":20,"text":456,"correct":29},{"key":24,"text":458,"correct":22},{"id":520,"libraryId":5,"type":451,"typeLabel":452,"stem":521,"options":522,"answer":456,"analysis":33},1260771,"混凝土或抹灰基层涂刷溶剂型涂料时，含水率不得大于8%。",[523,524],{"key":20,"text":456,"correct":29},{"key":24,"text":458,"correct":22},[526,529,532,535,538,541],{"id":15,"name":527,"category":7,"favorite":528},"领导干部任职前廉政法规知识测试题",92,{"id":530,"name":531,"category":7,"favorite":15},595,"建筑结构与设备",{"id":533,"name":534,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":536,"name":537,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":539,"name":540,"category":7,"favorite":8},534,"BIM工程师",{"id":542,"name":540,"category":7,"favorite":8},535]