[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":563},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,19,50,1193,[13,34,52,66,78,88,103,109,124,136,150,165,177,183,195,201,215,227,233,245,257,269,281,293,305,317,329,341,353,359,365,371,377,383,398,412,418,432,438,450,462,477,483,497,509,521,533,545,551,557],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1261579,1,"单选题","在一个施工项目中，（ ）是安全管理工作的第一责任人。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工程师",false,{"key":24,"text":25,"correct":26},"B","项目经理",true,{"key":28,"text":29,"correct":22},"C","安全员",{"key":31,"text":32,"correct":22},"D","班组长","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1261580,2,"多选题","施工准备阶段现场准备的安全技术措施包括（ ）的内容。",[40,42,44,46,48],{"key":20,"text":41,"correct":26},"按施工总平面图要求做好现场施工准备",{"key":24,"text":43,"correct":26},"电器线路，配电设备符合安全要求，有安全用电防护措施",{"key":28,"text":45,"correct":26},"场内道路畅通，设交通标志，危险地带设危险信号及禁止通行标志",{"key":31,"text":47,"correct":26},"保证特殊工种使用工具、器械质量合格，技术性能良好",{"key":49,"text":50,"correct":22},"E","现场定期检查","ABCD",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":51,"analysis":33},1261581,"专项方案编制应当包括（ ）等内容。",[56,58,60,62,64],{"key":20,"text":57,"correct":26},"工程概况",{"key":24,"text":59,"correct":26},"编制依据",{"key":28,"text":61,"correct":26},"施工计划",{"key":31,"text":63,"correct":26},"施工安全保证措施",{"key":49,"text":65,"correct":22},"施工总平面图",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":31,"analysis":33},1261582,"（ ）对建设工程项目的安全施工负责。",[70,72,74,76],{"key":20,"text":71,"correct":22},"专职安全管理人员",{"key":24,"text":73,"correct":22},"施工单位负责人",{"key":28,"text":75,"correct":22},"项目负责人",{"key":31,"text":77,"correct":26},"项目技术负责人",{"id":79,"libraryId":5,"type":80,"typeLabel":81,"stem":82,"options":83,"answer":87,"analysis":33},1261583,3,"判断题","”U”螺栓应在钢丝绳的尾端（短绳一侧），不得正反交错。绳卡初次固定后，应待钢丝绳受力后再度紧固，并宜拧紧到使两绳直径的高度压扁1\u002F2.",[84,86],{"key":20,"text":85,"correct":22},"正确",{"key":24,"text":87,"correct":26},"错误",{"id":89,"libraryId":5,"type":36,"typeLabel":37,"stem":90,"options":91,"answer":102,"analysis":33},1261584,"所谓安全生产就是指生产经营活动中，（ ）而采取的一系列措施和行动的总称。",[92,94,96,98,100],{"key":20,"text":93,"correct":26},"为保证人身健康与生命安全",{"key":24,"text":95,"correct":22},"防止财产不受损失",{"key":28,"text":97,"correct":26},"确保生产经营活动得以顺利进行",{"key":31,"text":99,"correct":26},"促进社会经济发展",{"key":49,"text":101,"correct":22},"降低成本","ACD",{"id":104,"libraryId":5,"type":80,"typeLabel":81,"stem":105,"options":106,"answer":85,"analysis":33},1261585,"在房屋高差较大或荷载差异较大的情况下，当未留设沉降缝时，容易在交接部位产生较大的不均匀沉降裂缝。",[107,108],{"key":20,"text":85,"correct":26},{"key":24,"text":87,"correct":22},{"id":110,"libraryId":5,"type":36,"typeLabel":37,"stem":111,"options":112,"answer":123,"analysis":33},1261586,"（ ）等实行分包的，其专项方案可由专业承包单位组织编制。",[113,115,117,119,121],{"key":20,"text":114,"correct":26},"起重机械安装工程",{"key":24,"text":116,"correct":26},"起重机械拆卸工程",{"key":28,"text":118,"correct":22},"建设工程主体工程",{"key":31,"text":120,"correct":26},"附着式升降脚手架搭设",{"key":49,"text":122,"correct":26},"深基坑工程","ABDE",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":31,"analysis":33},1261587,"我国安全生产的方针是（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":22},"安全责任重于泰山",{"key":24,"text":131,"correct":22},"安全第一、质量第一",{"key":28,"text":133,"correct":22},"管生产必须管安全",{"key":31,"text":135,"correct":26},"安全第一、预防为主、综合治理",{"id":137,"libraryId":5,"type":36,"typeLabel":37,"stem":138,"options":139,"answer":51,"analysis":33},1261588,"模板工程安全技术交底包括（ ）。",[140,142,144,146,148],{"key":20,"text":141,"correct":26},"不得在脚手架上堆放大批模板等材料",{"key":24,"text":143,"correct":26},"禁止使用20mmx40mrn木料作顶撑",{"key":28,"text":145,"correct":26},"支撑、牵杠等不得搭在门窗框和脚手架上",{"key":31,"text":147,"correct":26},"支模过程中，如需中途停歇应将支撑、搭头、柱头板等钉牢，拆模间歇时应将已活动的弹板、牵杠、支撑等运走或妥善堆放，防止因踏空、扶空而坠落",{"key":49,"text":149,"correct":22},"通路中间的斜撑、拉杆等应设在1m高以上",{"id":151,"libraryId":5,"type":36,"typeLabel":37,"stem":152,"options":153,"answer":164,"analysis":33},1261589,"一般工程施工阶段的安全技术措施包括（ ）。",[154,156,158,160,162],{"key":20,"text":155,"correct":22},"安全技术应与施工生产技术统一，各项安全技术措施必须在相应的工序施工前落实好",{"key":24,"text":157,"correct":26},"安全技术措施中应注明设计依据，并附有计算、详图和文字说明",{"key":28,"text":159,"correct":26},"操作者严格遵守相应的操作规程，实行标准化作业",{"key":31,"text":161,"correct":26},"针对采用的新工艺、新技术、新设备、新结构制定专门的施工安全技术措施",{"key":49,"text":163,"correct":26},"在明火作业现场有防火防爆措施","BCDE",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":28,"analysis":33},1261590,"焊把线长度一般不超过（ ），并不准有接头。",[169,171,173,175],{"key":20,"text":170,"correct":22},"10m",{"key":24,"text":172,"correct":22},"20m",{"key":28,"text":174,"correct":26},"30m",{"key":31,"text":176,"correct":22},"40m",{"id":178,"libraryId":5,"type":80,"typeLabel":81,"stem":179,"options":180,"answer":85,"analysis":33},1261591,"按规定设置拉撑点，剪刀撑用钢管，接头搭接不小于50cm。",[181,182],{"key":20,"text":85,"correct":26},{"key":24,"text":87,"correct":22},{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":31,"analysis":33},1261592,"安全教育和培训要体现（ ）的原则，覆盖施工现场的所有人员，贯穿于从施工准备、工程施工到竣工交付的各个阶段和方面，通过动态控制，确保只有经过安全教育的人员才能上岗。",[187,189,191,193],{"key":20,"text":188,"correct":22},"安全第一，预防为主",{"key":24,"text":190,"correct":22},"安全保证体系",{"key":28,"text":192,"correct":22},"安全生产责任制",{"key":31,"text":194,"correct":26},"全面、全员、全过程",{"id":196,"libraryId":5,"type":80,"typeLabel":81,"stem":197,"options":198,"answer":87,"analysis":33},1261593,"拆立杆时，先抱住立杆再拆开后两个扣；拆除大横杆、斜撑、剪刀撑时，应先拆中间扣，然后托住中间，再解端头扣。",[199,200],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":26},{"id":202,"libraryId":5,"type":36,"typeLabel":37,"stem":203,"options":204,"answer":51,"analysis":33},1261594,"编制施工安全技术措施应符合下列（ ）的要求。",[205,207,209,211,213],{"key":20,"text":206,"correct":26},"根据不同分部分项工程的施工方法和施工工艺可能给施工带来的不安全因素，相应的施工安全技术措施，真正做到从技术上采取措施保证其安全实施",{"key":24,"text":208,"correct":26},"使用的各种机械动力设备、用电设备等给施工人员可能带来危险因素，从安全保险装置等方面采取的技术措施",{"key":28,"text":210,"correct":26},"针对施工现场及周围环境，可能给施工人员或周围居民带来危害，以及材料、设备运输带来的不安全因素，从技术上采取措施，予以保护",{"key":31,"text":212,"correct":26},"施工中有毒有害、易燃易爆等作业，可能给施工人员造成的危害，从技术上采取措施，防止伤害事故",{"key":49,"text":214,"correct":22},"制定的施工安全技术措施需符合节约成本、降低使用要求的方法",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":24,"analysis":33},1261595,"安全立网面应与水平面垂直，并与作业边缘最大间缝不超过（ ）。",[219,221,223,225],{"key":20,"text":220,"correct":22},"5cm",{"key":24,"text":222,"correct":26},"10cm",{"key":28,"text":224,"correct":22},"15cm",{"key":31,"text":226,"correct":22},"20cm",{"id":228,"libraryId":5,"type":80,"typeLabel":81,"stem":229,"options":230,"answer":87,"analysis":33},1261596,"单项工程、单位工程均有安全技术措施，分部分项工程有安全技术具体措施，施工前由项目经理向参加施工的有关人员进行安全技术交底，并应逐级和保存“安全交底任务单'",[231,232],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":26},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1261597,"（ ）是依据国家法律法规制定的，项目全体员工在生产经营活动中心必须贯彻执行同时也是企业规章制度的重要组成部分。",[237,239,241,243],{"key":20,"text":238,"correct":22},"项目经理聘任制度",{"key":24,"text":240,"correct":26},"安全生产责任制度",{"key":28,"text":242,"correct":22},"项目管理考核评价制度",{"key":31,"text":244,"correct":22},"材料及设备的采购制度",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},1261598,"安全检查的主要内容是（ ）。①查思想；②查管理；③查隐患；④查整改；⑤查事故处理。",[249,251,253,255],{"key":20,"text":250,"correct":22},"②③④",{"key":24,"text":252,"correct":22},"①②③④",{"key":28,"text":254,"correct":22},"①②③⑤",{"key":31,"text":256,"correct":26},"①②③④⑤",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},1261599,"抹灰施工时，当采用加强网对不同材料基体交接处进行加强时，加强网与各基体的搭接宽度不应小于（ ）mm。",[261,263,265,267],{"key":20,"text":262,"correct":22},"50",{"key":24,"text":264,"correct":26},"100",{"key":28,"text":266,"correct":22},"150",{"key":31,"text":268,"correct":22},"200",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1261600,"抹灰完工后，室内墙面、柱面和门洞口等处应采用配合比（ ）水泥砂浆制作阳角护角。",[273,275,277,279],{"key":20,"text":274,"correct":22},"1：1",{"key":24,"text":276,"correct":26},"1:2",{"key":28,"text":278,"correct":22},"1：2.5",{"key":31,"text":280,"correct":22},"1:3",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},1261601,"当吊顶施工时，吊杆长于1.5m时，需要设置反支撑。反支撑的间隔不得大于（ ）m。",[285,287,289,291],{"key":20,"text":286,"correct":22},"1.2",{"key":24,"text":288,"correct":22},"1.8",{"key":28,"text":290,"correct":22},"2.4",{"key":31,"text":292,"correct":26},"3.6",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},1261602,"门窗框周边是砖墙时，砌墙时可（ ）以便与连接件连接。",[297,299,301,303],{"key":20,"text":298,"correct":26},"砌人混凝土預制块",{"key":24,"text":300,"correct":22},"砌人小型碎砖块",{"key":28,"text":302,"correct":22},"在砂浆中加人减水剂",{"key":31,"text":304,"correct":22},"使用高强度砌块砖",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1261603,"有防水要求的厕浴间进行防水施工，饰面层完工后应进行第二次蓄水试验，第二次蓄水试验不得低于（ ）h。",[309,311,313,315],{"key":20,"text":310,"correct":22},"12",{"key":24,"text":312,"correct":26},"24",{"key":28,"text":314,"correct":22},"36",{"key":31,"text":316,"correct":22},"48",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1261604,"内墙涂料喷涂时，应事先检查喷涂设备，喷涂压力不得大于（ ）MP A",[321,323,325,327],{"key":20,"text":322,"correct":22},"0.2",{"key":24,"text":324,"correct":26},"0.3",{"key":28,"text":326,"correct":22},"0.4",{"key":31,"text":328,"correct":22},"0.5",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},1261605,"窗台抹灰一般常在窗台中间部位出现一条或多条裂缝，其主要原因是（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":22},"窗口处长期受到阳光照射，抹灰层由于受热不均匀造成开裂现象",{"key":24,"text":336,"correct":26},"窗口处墙身与窗间墙自重大小不同，因基础刚度不足引起的沉降差使窗台抹灰裂缝",{"key":28,"text":338,"correct":22},"冬期施工时，窗口处冷热交替频繁，抹灰层在反复的冻融循环过程中产生开裂",{"key":31,"text":340,"correct":22},"窗口处抹灰施工结束后，第二天未进行浇水养护，且养护时间不足7d",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":28,"analysis":33},1261606,"下列关于门窗玻璃安装的说法正确的是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"门窗玻璃可直接接触型材",{"key":24,"text":348,"correct":22},"单面镀膜玻璃的镀膜层应朝向室外",{"key":28,"text":350,"correct":26},"磨砂玻璃的磨砂应朝向室内",{"key":31,"text":352,"correct":22},"中空玻璃的单层镀膜玻璃应在最内层",{"id":354,"libraryId":5,"type":80,"typeLabel":81,"stem":355,"options":356,"answer":87,"analysis":33},1261607,"抹灰施工时，可以罩面石膏灰抹在水泥砂浆层上。",[357,358],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":26},{"id":360,"libraryId":5,"type":80,"typeLabel":81,"stem":361,"options":362,"answer":87,"analysis":33},1261608,"饰面板砖粘贴施工用的水泥砂浆配合比应准确，施工人员需要根据具体情况，随时加水或加灰调节。",[363,364],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":26},{"id":366,"libraryId":5,"type":80,"typeLabel":81,"stem":367,"options":368,"answer":85,"analysis":33},1261609,"厕浴间采用聚合物水泥防水涂料进行防水施工时，垂直面的涂膜防水厚度不应小于1.2mm。",[369,370],{"key":20,"text":85,"correct":26},{"key":24,"text":87,"correct":22},{"id":372,"libraryId":5,"type":80,"typeLabel":81,"stem":373,"options":374,"answer":85,"analysis":33},1261610,"门窗框安装过程中，应根据不同的墙体材料采用不同的锚固方法，砖墙上不得采用射钉锚固。",[375,376],{"key":20,"text":85,"correct":26},{"key":24,"text":87,"correct":22},{"id":378,"libraryId":5,"type":80,"typeLabel":81,"stem":379,"options":380,"answer":87,"analysis":33},1261611,"铺设地面瓷砖时，单块砖允许有空鼓，但空鼓面积不得超过该瓷砖面积的5％。",[381,382],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":26},{"id":384,"libraryId":5,"type":36,"typeLabel":37,"stem":385,"options":386,"answer":397,"analysis":33},1261612,"某项目防水涂层厚度的设计要求为1.5mm厚，下列检验数据，符合验收要求的有（ ）。",[387,389,391,393,395],{"key":20,"text":388,"correct":26},"1.5mm",{"key":24,"text":390,"correct":26},"1.45mm",{"key":28,"text":392,"correct":26},"1.35mm",{"key":31,"text":394,"correct":22},"1.25mm",{"key":49,"text":396,"correct":22},"1.2mm","ABC",{"id":399,"libraryId":5,"type":36,"typeLabel":37,"stem":400,"options":401,"answer":51,"analysis":33},1261613,"下列需要进行材料见证取样复验的材料有（ ）。",[402,404,406,408,410],{"key":20,"text":403,"correct":26},"防水涂料",{"key":24,"text":405,"correct":26},"防水卷材",{"key":28,"text":407,"correct":26},"防水砂浆",{"key":31,"text":409,"correct":26},"密封胶",{"key":49,"text":411,"correct":22},"拌合用水",{"id":413,"libraryId":5,"type":80,"typeLabel":81,"stem":414,"options":415,"answer":87,"analysis":33},1261614,"门窗框安装过程中，应推广使用含沥青的软质材料，以免PVC腐蚀。",[416,417],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":26},{"id":419,"libraryId":5,"type":36,"typeLabel":37,"stem":420,"options":421,"answer":397,"analysis":33},1261615,"抹灰施工中，分格缝不直不平，缺棱错缝的主要原因有（ ）。",[422,424,426,428,430],{"key":20,"text":423,"correct":26},"没有拉通线，统一在底灰上弹水平和垂直分格线",{"key":24,"text":425,"correct":26},"木分格条浸水不透，使用后变形",{"key":28,"text":427,"correct":26},"粘贴分格条和起分格条时操作不当，造成缝口两边缺棱角或错缝",{"key":31,"text":429,"correct":22},"墙面分格过大",{"key":49,"text":431,"correct":22},"基层处理不好，墙面浇水不透",{"id":433,"libraryId":5,"type":80,"typeLabel":81,"stem":434,"options":435,"answer":85,"analysis":33},1261616,"采用湿作业法施工的饰面板工程，石材应进行防碱背涂处理。",[436,437],{"key":20,"text":85,"correct":26},{"key":24,"text":87,"correct":22},{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},1261617,"吊顶格栅四周为抹灰墙面时，周边的吊顶格栅应离开墙面一定距离，以防止面层变形并便于安装吊顶面板及压条。下列留置的距离正确的是（ ）mm。",[442,444,446,448],{"key":20,"text":443,"correct":22},"5",{"key":24,"text":445,"correct":22},"15",{"key":28,"text":447,"correct":26},"25",{"key":31,"text":449,"correct":22},"35",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1261618,"厕浴间防水层施工完毕后，检查防水隔离层应采用（ ）方法。",[454,456,458,460],{"key":20,"text":455,"correct":26},"蓄水",{"key":24,"text":457,"correct":22},"洒水",{"key":28,"text":459,"correct":22},"注浆",{"key":31,"text":461,"correct":22},"破坏试验",{"id":463,"libraryId":5,"type":36,"typeLabel":37,"stem":464,"options":465,"answer":476,"analysis":33},1261619,"为防止内墙涂料涂层色淡且该处易掉粉末，采取的措施有（ ）。",[466,468,470,472,474],{"key":20,"text":467,"correct":26},"施工气温不宜过低，应在10℃以上",{"key":24,"text":469,"correct":22},"基层须干燥，含水率应小于12%",{"key":28,"text":471,"correct":22},"混凝土龄期应不小于14d",{"key":31,"text":473,"correct":22},"涂料随时加水，保持配合比稳定",{"key":49,"text":475,"correct":26},"根据基层选择不同的腻子","AE",{"id":478,"libraryId":5,"type":80,"typeLabel":81,"stem":479,"options":480,"answer":85,"analysis":33},1261620,"多彩内墙涂料产生流挂现象的主要原因是喷涂涂料太厚，自重较大，涂料不能很好挂住。",[481,482],{"key":20,"text":85,"correct":26},{"key":24,"text":87,"correct":22},{"id":484,"libraryId":5,"type":36,"typeLabel":37,"stem":485,"options":486,"answer":123,"analysis":33},1261621,"纤维板吊顶面层装钉后，部分板块逐渐产生凹凸变形现象的原因有（ ）。",[487,489,491,493,495],{"key":20,"text":488,"correct":26},"纤维板在使用中吸收水分",{"key":24,"text":490,"correct":26},"装钉时，从四角或四周向中心排钉装钉",{"key":28,"text":492,"correct":22},"吊顶格栅造型不对称、布局不合理",{"key":31,"text":494,"correct":26},"装钉板块时，板块接头未留空隙",{"key":49,"text":496,"correct":26},"吊顶分格过大",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},1261622,"低温热水辐射供暖地面填充层的豆石混凝土强度等级不宜小于（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"C15",{"key":24,"text":504,"correct":26},"C20",{"key":28,"text":506,"correct":22},"C25",{"key":31,"text":508,"correct":22},"C30",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":20,"analysis":33},1261623,"对于裂缝与空鼓同时产生而房间外观质量要求不高时，可用凿子凿成一条浅槽后，用屋面用胶泥嵌补。凿槽的规格为（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":26},"宽约10mm，深约20mm",{"key":24,"text":516,"correct":22},"宽约20mm,深约10mm",{"key":28,"text":518,"correct":22},"宽约30m，深约50mm",{"key":31,"text":520,"correct":22},"宽约50mm,深约30mm",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},1261624,"施工温度是造成楼地面面层出现裂缝的原因之一。下列关于建筑地面工程施工时，各层环境温度控制的说法，错误的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"采用掺有水泥、石灰的拌合料铺设以及用石油沥青胶结料铺贴时，不应低于5℃",{"key":24,"text":528,"correct":22},"采用有机胶粘剂粘贴时，不应低于10℃",{"key":28,"text":530,"correct":22},"采用砂、石材料铺设时，不应低于0℃",{"key":31,"text":532,"correct":26},"采用自流平、涂料铺设时，不应低于5℃，也不应高于35℃",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},1261625,"轻钢龙骨隔墙表面封纸面石膏板的表面平整度允许偏差为（ ）mm。",[537,539,541,543],{"key":20,"text":538,"correct":22},"1",{"key":24,"text":540,"correct":22},"2",{"key":28,"text":542,"correct":26},"3",{"key":31,"text":544,"correct":22},"4",{"id":546,"libraryId":5,"type":80,"typeLabel":81,"stem":547,"options":548,"answer":87,"analysis":33},1261626,"该工程吊顶工程矿棉板与轻钢龙骨的搭接宽度应大于龙骨受力面宽度的1\u002F3。",[549,550],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":26},{"id":552,"libraryId":5,"type":80,"typeLabel":81,"stem":553,"options":554,"answer":85,"analysis":33},1261627,"低温热水地面辐射供暖施工前，底层地面或楼层有防水要求的，必须做防水隔离（ ）",[555,556],{"key":20,"text":85,"correct":26},{"key":24,"text":87,"correct":22},{"id":558,"libraryId":5,"type":80,"typeLabel":81,"stem":559,"options":560,"answer":87,"analysis":33},1261628,"浅色水磨石面层，宜采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥制作。",[561,562],{"key":20,"text":85,"correct":22},{"key":24,"text":87,"correct":26},[564,567,570,573,576,579],{"id":15,"name":565,"category":7,"favorite":566},"领导干部任职前廉政法规知识测试题",92,{"id":568,"name":569,"category":7,"favorite":15},595,"建筑结构与设备",{"id":571,"name":572,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":574,"name":575,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":577,"name":578,"category":7,"favorite":8},534,"BIM工程师",{"id":580,"name":578,"category":7,"favorite":8},535]