[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,16,50,1193,[13,38,53,68,82,92,104,119,134,148,160,166,180,192,198,204,216,228,240,252,264,276,288,300,306,312,318,324,330,336,342,348,363,377,392,407,422,437,449,455,461,475,487,502,517,531,543,555,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1261429,2,"多选题","某项目施工需进行木门的安装施工，其中，普通木门200樘，甲级防火门30樘，乙级防火门100樘，丙级防火门80樘。试回答以下问题： 下列关于防火门的说法，正确的有（ ）。（多项选择题）",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","设置在建筑内经常有人通行处的防火门宜采用常闭防火门",false,{"key":24,"text":25,"correct":26},"B","防火门用合页板厚应不少于3mm",true,{"key":28,"text":29,"correct":22},"C","门扇上带防火玻璃的防火门代号为bl",{"key":31,"text":32,"correct":26},"D","双扇防火门设置盖缝板的应安装顺序器",{"key":34,"text":35,"correct":22},"E","防火门可不安装防火门闭门器","BD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1261430,"下列属于确定施工顺序的基本原则的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"施工成本的要求",{"key":24,"text":45,"correct":26},"房间的使用功能和施工方法要协调一致",{"key":28,"text":47,"correct":26},"考虑施工工期的要求",{"key":31,"text":49,"correct":26},"考虑施工的安全因素",{"key":34,"text":51,"correct":26},"设备对施工流向的影响","BCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1261431,"甩下列关于流水施工特点的说法，正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"使劳动力使用均衡",{"key":24,"text":60,"correct":22},"增加闲置施工作业面",{"key":28,"text":62,"correct":26},"资源消耗均衡",{"key":31,"text":64,"correct":26},"提高施工机械的利用率",{"key":34,"text":66,"correct":22},"增加设备和费用","ACD",{"id":69,"libraryId":5,"type":70,"typeLabel":71,"stem":72,"options":73,"answer":31,"analysis":37},1261432,1,"单选题","下列确定流水步距时不需要考虑的因素是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"应保证相邻两个施工过程之间工艺上有合理的顺序",{"key":24,"text":77,"correct":22},"应使各个施工过程的专业工作队连续施工",{"key":28,"text":79,"correct":22},"应考虑各个施工过程之间的间歇时间",{"key":31,"text":81,"correct":26},"劳动力人数或施工机械台班数",{"id":83,"libraryId":5,"type":84,"typeLabel":85,"stem":86,"options":87,"answer":89,"analysis":37},1261433,3,"判断题","吊顶内的给水管道须经试压、验收合格后并注水，再施工下道工序。如施工中有给水管道损坏现象，可及时发现，以免造成更大的损失。",[88,90],{"key":20,"text":89,"correct":26},"正确",{"key":24,"text":91,"correct":22},"错误",{"id":93,"libraryId":5,"type":70,"typeLabel":71,"stem":94,"options":95,"answer":28,"analysis":37},1261434,"某项目施工需进行木门的安装施工，其中，普通木门200樘，甲级防火门30樘，乙级防火门100樘，丙级防火门80樘。试回答以下问题： 该项目特种门窗应划分为几个检验批（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":22},"1",{"key":24,"text":99,"correct":22},"3",{"key":28,"text":101,"correct":26},"5",{"key":31,"text":103,"correct":22},"10",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":118,"analysis":37},1261435,"下列成品保护的一般措施中，属于“防护”措施的有（ ）。",[108,110,112,114,116],{"key":20,"text":109,"correct":22},"铝合金门窗可用塑料布包扎保护",{"key":24,"text":111,"correct":26},"门扇安装后可加楔固定",{"key":28,"text":113,"correct":22},"预制水磨石或大理石楼梯可用模板覆盖加以保护",{"key":31,"text":115,"correct":26},"对清水楼梯踏步，可以采取护棱角铁上下连接固定",{"key":34,"text":117,"correct":26},"对于进出口台阶可垫砖或方木搭脚手板供人通过的方法来保护台阶","BDE",{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":133,"analysis":37},1261436,"下列关于室内装饰装修工程施工顺序基本原则的说法，正确的有（ ）。",[123,125,127,129,131],{"key":20,"text":124,"correct":26},"先湿作业，后干作业",{"key":24,"text":126,"correct":22},"先干作业，后湿作业",{"key":28,"text":128,"correct":26},"先管线、后饰面",{"key":31,"text":130,"correct":22},"先饰面、后管线",{"key":34,"text":132,"correct":26},"先墙顶、后地面","ACE",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":52,"analysis":37},1261437,"下列关于细部工程成品保护的做法，正确的有（ ）。",[138,140,142,144,146],{"key":20,"text":139,"correct":22},"对楼梯栏杆、阳台护栏有污点的部位用干净不褪色的抹布或毛巾蘸弱碱或弱酸擦拭干净即可",{"key":24,"text":141,"correct":26},"安装不锈钢扶手时，要注意保护楼梯栏杆和踏步面层，踏步面层要采用麻袋片或细木工板制模进行保护，在扶手焊接时，麻袋片局部要进行湿润",{"key":28,"text":143,"correct":26},"对已经装饰完成的电梯轿厢的立面均用细木工板等材料进行保护",{"key":31,"text":145,"correct":26},"花饰安装后应用覆盖物封闭，以保持洁净、保护色调",{"key":34,"text":147,"correct":26},"现场制作的家具，饰面用的木制品进场后及时刷底油一道。铁制品应满刷防锈漆",{"id":149,"libraryId":5,"type":70,"typeLabel":71,"stem":150,"options":151,"answer":28,"analysis":37},1261438,"组织流水施工时，流水步距是指（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"第一个专业队与其他专业队开始施工的最小间隔时间",{"key":24,"text":155,"correct":22},"第一个专业队与最后一个专业队开始施工的最小间隔时间",{"key":28,"text":157,"correct":26},"相邻专业队相继开始施工的最小间隔时间",{"key":31,"text":159,"correct":22},"相邻专业队相继开始施工的最大时间间隔",{"id":161,"libraryId":5,"type":84,"typeLabel":85,"stem":162,"options":163,"answer":89,"analysis":37},1261439,"安装灯具、通风罩等须在顶部采用加固措施，避免安装时顶部局部受力造成成品破坏。",[164,165],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":118,"analysis":37},1261440,"下列关于施工平面布置设计的原则，说法正确的有（ ）。",[170,172,174,176,178],{"key":20,"text":171,"correct":22},"尽量增大场内运输量",{"key":24,"text":173,"correct":26},"要符合劳动保护、技术安全及防火的要求",{"key":28,"text":175,"correct":22},"为使场内施工方便，尽可能扩大施工用地",{"key":31,"text":177,"correct":26},"方便生产生活",{"key":34,"text":179,"correct":26},"少用地",{"id":181,"libraryId":5,"type":70,"typeLabel":71,"stem":182,"options":183,"answer":28,"analysis":37},1261441,"下列关于电梯石材门套成品保护的说法中，错误的是（ ）。",[184,186,188,190],{"key":20,"text":185,"correct":22},"用成品瓦楞纸板根据石材造型满贴，高度2m",{"key":24,"text":187,"correct":22},"验收合格后清除石材拼缝及拼角部位的垃圾杂物，用干净棉布清除石材表面灰尘",{"key":28,"text":189,"correct":26},"避免使用有颜色和酸的清洁剂清洁石材，但可以使用碱性清洁剂",{"key":31,"text":191,"correct":22},"应在转角部位用稍硬板条加强保护，防止材料进出电梯时损坏石材",{"id":193,"libraryId":5,"type":84,"typeLabel":85,"stem":194,"options":195,"answer":89,"analysis":37},1261442,"工序交接采用下道工序作业人员和成品保护负责人同时签字确认方式，并保存工序饰面材料，下道工序作业人员对防止成品的污染、损坏或丢失负直接责任，成品保护专人对成品保护负监督、检查责任。",[196,197],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":199,"libraryId":5,"type":84,"typeLabel":85,"stem":200,"options":201,"answer":89,"analysis":37},1261443,"建筑装饰工程的施工程序应根据工期要求、劳动力配备情况、气候条件、脚手架类型等因素综合考虑。",[202,203],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":205,"libraryId":5,"type":70,"typeLabel":71,"stem":206,"options":207,"answer":24,"analysis":37},1261444,"进度计划中各项工作在某一单位时间内所需某种资源数量之和称为（ ）。",[208,210,212,214],{"key":20,"text":209,"correct":22},"资源强度",{"key":24,"text":211,"correct":26},"资源需用量",{"key":28,"text":213,"correct":22},"资源限量",{"key":31,"text":215,"correct":22},"资源饱和度",{"id":217,"libraryId":5,"type":70,"typeLabel":71,"stem":218,"options":219,"answer":24,"analysis":37},1261445,"在施工中遇到恶劣天气等不利因素的严重影响，施工进度计划跟踪检查间隔时间可临时（ ）。",[220,222,224,226],{"key":20,"text":221,"correct":22},"增长",{"key":24,"text":223,"correct":26},"缩短",{"key":28,"text":225,"correct":22},"不变",{"key":31,"text":227,"correct":22},"随意调整",{"id":229,"libraryId":5,"type":70,"typeLabel":71,"stem":230,"options":231,"answer":28,"analysis":37},1261446,"施工进度计划跟踪检查时，检查和收集资料的方式一般采用进度报表方式或（ ）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"加强现场巡查",{"key":24,"text":235,"correct":22},"统计施工作业人数",{"key":28,"text":237,"correct":26},"定期召开进度工作汇报会",{"key":31,"text":239,"correct":22},"班组每日班前交底会",{"id":241,"libraryId":5,"type":70,"typeLabel":71,"stem":242,"options":243,"answer":20,"analysis":37},1261447,"资源平衡是在不影响工期的条件下，利用（ ）的时差资源需求进行的调整。",[244,246,248,250],{"key":20,"text":245,"correct":26},"关键工作",{"key":24,"text":247,"correct":22},"非关键工作",{"key":28,"text":249,"correct":22},"持续时间最长的工作",{"key":31,"text":251,"correct":22},"持续时间最短的工作",{"id":253,"libraryId":5,"type":70,"typeLabel":71,"stem":254,"options":255,"answer":24,"analysis":37},1261448,"资源平衡计算的最终目的是（ ）。",[256,258,260,262],{"key":20,"text":257,"correct":22},"实现工期目标",{"key":24,"text":259,"correct":26},"均衡施工",{"key":28,"text":261,"correct":22},"安全生产",{"key":31,"text":263,"correct":22},"实现盈利",{"id":265,"libraryId":5,"type":70,"typeLabel":71,"stem":266,"options":267,"answer":28,"analysis":37},1261449,"某礼堂在图纸上位于H~K轴及6~9轴之间。该礼堂现进行地面找平层施工前进行基层检查发现混凝土表面有0.2mm左右的裂缝，经分析研究后认为该裂缝不影响结构的安全和使用功能。地面找平层施工工艺步骤如下：材料准备一基层清理→测量与标高控制→铺找平层→刷素水泥浆结合层→养护→验收。试回答以下问题： 找平层施工步骤错误的是（ ）。",[268,270,272,274],{"key":20,"text":269,"correct":22},"材料准备→基层清理",{"key":24,"text":271,"correct":22},"基层清理→测量与标高控制",{"key":28,"text":273,"correct":26},"铺找平层→刷素水泥浆结合层",{"key":31,"text":275,"correct":22},"养护→验收",{"id":277,"libraryId":5,"type":70,"typeLabel":71,"stem":278,"options":279,"answer":28,"analysis":37},1261450,"双代号网络图的三要素是指（ ）。",[280,282,284,286],{"key":20,"text":281,"correct":22},"节点、箭杆、工作作业时间",{"key":24,"text":283,"correct":22},"紧前工作、紧后工作、关键线路",{"key":28,"text":285,"correct":26},"工作、节点、线路",{"key":31,"text":287,"correct":22},"工期、关键线路、非关键线路",{"id":289,"libraryId":5,"type":70,"typeLabel":71,"stem":290,"options":291,"answer":20,"analysis":37},1261451,"网络计划中，工作最早开始时间应为（ ）。",[292,294,296,298],{"key":20,"text":293,"correct":26},"所有紧前工作最早完成时间的最大值",{"key":24,"text":295,"correct":22},"所有紧前工作最早完成时间的最小值",{"key":28,"text":297,"correct":22},"所有紧前工作最迟完成时间的最大值",{"key":31,"text":299,"correct":22},"所有紧前工作最迟完成时间的最小值",{"id":301,"libraryId":5,"type":84,"typeLabel":85,"stem":302,"options":303,"answer":89,"analysis":37},1261452,"采用先进的施工机械是进度计划调整中的技术措施。",[304,305],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":307,"libraryId":5,"type":84,"typeLabel":85,"stem":308,"options":309,"answer":89,"analysis":37},1261453,"施工作业计划是基层施工单位进行施工的直接依据。",[310,311],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":313,"libraryId":5,"type":84,"typeLabel":85,"stem":314,"options":315,"answer":89,"analysis":37},1261454,"建筑装饰工程施工，施工任务书包括施工任务单、限额领料单和考勤表。",[316,317],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":319,"libraryId":5,"type":84,"typeLabel":85,"stem":320,"options":321,"answer":89,"analysis":37},1261455,"施工进度计划报审一般采用报审表的形式。",[322,323],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":325,"libraryId":5,"type":84,"typeLabel":85,"stem":326,"options":327,"answer":91,"analysis":37},1261456,"构配件配置计划是根据施工预算、施工方案施工进度计划和机械台班定额编制的。",[328,329],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":26},{"id":331,"libraryId":5,"type":84,"typeLabel":85,"stem":332,"options":333,"answer":89,"analysis":37},1261457,"资源优化是指通过改变工作的时间，使资源按照时间的分布来合理优化目标，进而达到均衡施工的目的。",[334,335],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":337,"libraryId":5,"type":84,"typeLabel":85,"stem":338,"options":339,"answer":89,"analysis":37},1261458,"建筑装饰工程施工中，实际施工进度的检查方法一般分为日常检查和定期检查两",[340,341],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":343,"libraryId":5,"type":84,"typeLabel":85,"stem":344,"options":345,"answer":91,"analysis":37},1261459,"劳动力均衡系数K越接近2，说明劳动力安排越合理。",[346,347],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":26},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":362,"analysis":37},1261460,"资源配置平衡计算时，均衡施工的指标一般有（ ）。",[352,354,356,358,360],{"key":20,"text":353,"correct":26},"不均衡系数",{"key":24,"text":355,"correct":26},"极差值",{"key":28,"text":357,"correct":26},"均方差值",{"key":31,"text":359,"correct":22},"均衡系数",{"key":34,"text":361,"correct":22},"平均差值","ABC",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":133,"analysis":37},1261461,"某礼堂在图纸上位于H~K轴及6~9轴之间。该礼堂现进行地面找平层施工前进行基层检查发现混凝土表面有0.2mm左右的裂缝，经分析研究后认为该裂缝不影响结构的安全和使用功能。地面找平层施工工艺步骤如下：材料准备一基层清理→测量与标高控制→铺找平层→刷素水泥浆结合层→养护→验收。试回答以下问题： 下列关于地面找平层的说法，正确的有（ ）。（多项选择题）",[367,369,371,373,375],{"key":20,"text":368,"correct":26},"当找平层厚度小于30mm时，宜用水泥砂浆做找平层",{"key":24,"text":370,"correct":22},"当找平层厚度不小于30mm时，宜用水泥砂浆做找平层",{"key":28,"text":372,"correct":26},"找平层采用碎石或卵石的粒径不应大于其厚度的2\u002F3",{"key":31,"text":374,"correct":22},"找平层采用的砂为中粗砂，其含泥量不应大于5％",{"key":34,"text":376,"correct":26},"采用水泥砂浆时，水泥砂浆体积比不应小于1：3",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":391,"analysis":37},1261462,"网络计划时间参数的计算方法包括（ ）。",[381,383,385,387,389],{"key":20,"text":382,"correct":26},"分析计算法",{"key":24,"text":384,"correct":26},"图上计算法",{"key":28,"text":386,"correct":26},"矩阵计算法",{"key":31,"text":388,"correct":22},"时钟测时法",{"key":34,"text":390,"correct":26},"电算计算法","ABCE",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":406,"analysis":37},1261463,"编制建设工程施工总进度计划，主要用来确认下列（ ）工作。",[396,398,400,402,404],{"key":20,"text":397,"correct":22},"各单项工程或单位工程的工期定额",{"key":24,"text":399,"correct":22},"建设的要求工期和计算工期",{"key":28,"text":401,"correct":26},"各单项工程或单位工程的施工期限",{"key":31,"text":403,"correct":22},"各单项工程或单位工程的实物工程量",{"key":34,"text":405,"correct":26},"各单项工程或单位工程的相互搭接关系","CE",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":421,"analysis":37},1261464,"工程项目进度计划调整时，应考虑（ ）限制条件，确保要求的进度目标得到实现。",[411,413,415,417,419],{"key":20,"text":412,"correct":26},"后续工作",{"key":24,"text":414,"correct":22},"项目经理部的管理力量",{"key":28,"text":416,"correct":26},"总工期",{"key":31,"text":418,"correct":22},"已完工作",{"key":34,"text":420,"correct":22},"安全管理要求","AC",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":436,"analysis":37},1261465,"工程实际进度偏差影响到总工期时，可采用（ ）等方法调整进度计划。",[426,428,430,432,434],{"key":20,"text":427,"correct":26},"将顺序施工改为搭接施工",{"key":24,"text":429,"correct":26},"将部分任务转移且增加资源投入",{"key":28,"text":431,"correct":26},"增加劳动力，提高劳动效率",{"key":31,"text":433,"correct":26},"增加资源投入",{"key":34,"text":435,"correct":22},"将平行作业改为顺序作业","ABCD",{"id":438,"libraryId":5,"type":70,"typeLabel":71,"stem":439,"options":440,"answer":31,"analysis":37},1261466,"下列关于工期的说法，错误的是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"任何工程都有规定工期、计划工期和计算工期",{"key":24,"text":444,"correct":22},"计划工期可以小于规定工期",{"key":28,"text":446,"correct":22},"计划工期可以等于规定工期",{"key":31,"text":448,"correct":26},"计划工期有时可等于计算工期",{"id":450,"libraryId":5,"type":84,"typeLabel":85,"stem":451,"options":452,"answer":91,"analysis":37},1261467,"建筑装饰施工中，施工任务书应由项目技术负责人按班组编制并下达。",[453,454],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":26},{"id":456,"libraryId":5,"type":84,"typeLabel":85,"stem":457,"options":458,"answer":89,"analysis":37},1261468,"施工进度计划中可以改变某些工作之间的逻辑关系，以达到缩短工期的目的。",[459,460],{"key":20,"text":89,"correct":26},{"key":24,"text":91,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":36,"analysis":37},1261469,"在建筑装饰工程施工过程中，加快施工进度的组织措施有（ ）。",[465,467,469,471,473],{"key":20,"text":466,"correct":22},"采用先进的施工方法以减少施工过程的数量",{"key":24,"text":468,"correct":26},"增加工作面，组织更多的专业工作队",{"key":28,"text":470,"correct":22},"改善劳动条件和外部配合条件",{"key":31,"text":472,"correct":26},"增加劳动力和施工机械的数量",{"key":34,"text":474,"correct":22},"改进施工工艺",{"id":476,"libraryId":5,"type":70,"typeLabel":71,"stem":477,"options":478,"answer":20,"analysis":37},1261470,"分析进度计划偏差影响时，若工作的进度偏差大于该工作的总时差，则此偏差（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":26},"对后续工作和总工期都有影响",{"key":24,"text":482,"correct":22},"对后续工作有影响，对总工期无影响",{"key":28,"text":484,"correct":22},"对后续工作无影响，对总工期有影响",{"key":31,"text":486,"correct":22},"对后续工作和总工期都无影响",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":501,"analysis":37},1261471,"下列选项中，属于在工程网络计划中进行资源优化目的的有（",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"资源强度最低",{"key":24,"text":494,"correct":26},"总费用最低",{"key":28,"text":496,"correct":26},"资源需用量尽可能低",{"key":31,"text":498,"correct":22},"资源需用量最少",{"key":34,"text":500,"correct":26},"计算工期满足要求工期","BCE",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":516,"analysis":37},1261472,"在编制施工进度计划的初始方案后，对施工进度计划进行检查的依据有（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":26},"合同规定",{"key":24,"text":509,"correct":26},"经济效益",{"key":28,"text":511,"correct":22},"班组人数",{"key":31,"text":513,"correct":26},"施工条件",{"key":34,"text":515,"correct":22},"资金状况","ABD",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":406,"analysis":37},1261473,"在施工进度计划的调整中，压缩关键工作持续时间的技术措施有（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"增加劳动力",{"key":24,"text":524,"correct":22},"增加施工机械数量",{"key":28,"text":526,"correct":26},"改进施工技术和工艺",{"key":31,"text":528,"correct":22},"采用工程分包方式",{"key":34,"text":530,"correct":26},"采用先进的施工机械",{"id":532,"libraryId":5,"type":70,"typeLabel":71,"stem":533,"options":534,"answer":20,"analysis":37},1261474,"某礼堂在图纸上位于H~K轴及6~9轴之间。该礼堂现进行地面找平层施工前进行基层检查发现混凝土表面有0.2mm左右的裂缝，经分析研究后认为该裂缝不影响结构的安全和使用功能。地面找平层施工工艺步骤如下：材料准备一基层清理→测量与标高控制→铺找平层→刷素水泥浆结合层→养护→验收。试回答以下问题： 项目质量管理中影响因素包括人的因素、机械因素、材料因素、方法因素、环境因素，下列起决定性因素的是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":26},"人的因素",{"key":24,"text":538,"correct":22},"机械因素",{"key":28,"text":540,"correct":22},"材料因素",{"key":31,"text":542,"correct":22},"方法因素",{"id":544,"libraryId":5,"type":70,"typeLabel":71,"stem":545,"options":546,"answer":28,"analysis":37},1261475,"和横道图相比较，网络计划的缺点是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"不能反映工作问题的逻辑",{"key":24,"text":550,"correct":22},"不能反映出关键工作",{"key":28,"text":552,"correct":26},"计算资源消耗量不便",{"key":31,"text":554,"correct":22},"不能实现电算化",{"id":556,"libraryId":5,"type":70,"typeLabel":71,"stem":557,"options":558,"answer":31,"analysis":37},1261476,"在根据《建设工程工程量清单计价规范》GB50500-2013规定，建设工程工程量清单中的其他项目清单不包括（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":22},"暂列金额",{"key":24,"text":562,"correct":22},"总承包服务费",{"key":28,"text":564,"correct":22},"计日工",{"key":31,"text":566,"correct":26},"规费",{"id":568,"libraryId":5,"type":70,"typeLabel":71,"stem":569,"options":570,"answer":20,"analysis":37},1261477,"根据工程量清单计价规则，综合单价中由承包人完全承担的风险是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":26},"管理费、利润",{"key":24,"text":574,"correct":22},"材料价格风险",{"key":28,"text":576,"correct":22},"法律法规",{"key":31,"text":578,"correct":22},"机械使用费",{"id":580,"libraryId":5,"type":70,"typeLabel":71,"stem":581,"options":582,"answer":28,"analysis":37},1261478,"某住宅楼为6层砌体结构，建筑面积1200㎡，现需进行抹灰施工。某施工企业承揽该工程抹灰施工。关于该工程的定额与计价有如下问题： 现某抹灰班13名工人，抹白灰砂浆墙面，施工25d完成抹灰任务，个人产量定额为10.2㎡\u002F工日，则该抹灰班应完成的抹灰面积为（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"255㎡",{"key":24,"text":586,"correct":22},"19.6㎡",{"key":28,"text":588,"correct":26},"3315㎡",{"key":31,"text":590,"correct":22},"1331㎡",[592,595,598,601,604,607],{"id":70,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":70},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":70},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":70},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]