[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":547},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,15,50,1193,[13,34,46,56,68,74,80,92,104,116,128,140,152,164,170,176,182,188,194,212,227,242,257,272,283,289,301,315,327,333,345,354,369,375,387,399,409,421,433,445,457,467,473,479,485,491,497,503,518,532],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1261379,1,"单选题","窗帘轨安装时，当窗宽大于（ ）m时，窗帘轨中间应断开，断开处应槭弯错开，弯曲度应平缓。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","0.9",false,{"key":24,"text":25,"correct":26},"B","1.2",true,{"key":28,"text":29,"correct":22},"C","1.5",{"key":31,"text":32,"correct":22},"D","1.8","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1261380,"下列窗帘盒施工流程，正确的顺序是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"材料准备→安装木基层→窗帘盒安装→定位放线一窗帘轨固定一验收",{"key":24,"text":41,"correct":22},"材料准备一安装木基层一定位放线一窗帘盒安装一窗帘轨固定一验收",{"key":28,"text":43,"correct":26},"材料准备→定位放线→安装木基层→窗帘盒安装→窗帘轨固定一验收",{"key":31,"text":45,"correct":22},"材料准备→定位放线一安装木基层一窗帘轨固定一窗帘盒安装一验收",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":53,"analysis":33},1261381,3,"判断题","根据《民用建筑设计通则》GB50352规定，临空高度在24m以下时，栏杆高度不应低于1.05m。",[52,54],{"key":20,"text":53,"correct":26},"正确",{"key":24,"text":55,"correct":22},"错误",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":31,"analysis":33},1261382,"墙面砖工程质量控制点中不包括（ ）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"墙面砖出现小窄边",{"key":24,"text":63,"correct":22},"墙面出现高低差，平整度",{"key":28,"text":65,"correct":22},"面砖空鼓、断裂",{"key":31,"text":67,"correct":26},"瓷砖报价",{"id":69,"libraryId":5,"type":48,"typeLabel":49,"stem":70,"options":71,"answer":53,"analysis":33},1261383,"窗帘轨安装时，当窗宽大于1.2m时，窗帘轨中间应断开，断开处应煨弯错开，弯曲度应平缓。",[72,73],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":75,"libraryId":5,"type":48,"typeLabel":49,"stem":76,"options":77,"answer":53,"analysis":33},1261384,"在面积超过100㎡房间进行实木地板铺设时，应预留伸缩缝。",[78,79],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":28,"analysis":33},1261385,"建筑装饰门窗工程隐蔽项目中不包括（ ）。",[84,86,88,90],{"key":20,"text":85,"correct":22},"预埋件",{"key":24,"text":87,"correct":22},"锚固件",{"key":28,"text":89,"correct":26},"五金配件",{"key":31,"text":91,"correct":22},"预埋木砖的防腐处理",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1261386,"石膏板标志法观测裂缝，用（ ）的石膏板，固定在裂缝两侧。",[96,98,100,102],{"key":20,"text":97,"correct":22},"厚40mm，宽20~50mm",{"key":24,"text":99,"correct":26},"厚30mm，宽30~60mm",{"key":28,"text":101,"correct":22},"厚20mm,宽40~70mm",{"key":31,"text":103,"correct":22},"厚10mm,宽50~80mm",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":28,"analysis":33},1261387,"以下水准仪中哪一种型号的精度最高。（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"DS1O",{"key":24,"text":111,"correct":22},"DS3",{"key":28,"text":113,"correct":26},"DS0.5",{"key":31,"text":115,"correct":22},"DS1",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":33},1261388,"水准点的数目不得少于（ ）个点。",[120,122,124,126],{"key":20,"text":121,"correct":22},"1",{"key":24,"text":123,"correct":22},"2",{"key":28,"text":125,"correct":26},"3",{"key":31,"text":127,"correct":22},"4",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":28,"analysis":33},1261389,"一测站水准测量基本操作中的读数之前的操作是（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"必须做好安置仪器，粗略整平，瞄准标尺的工作",{"key":24,"text":135,"correct":22},"必须做好安置仪器，瞄准标尺，精确整平的工作",{"key":28,"text":137,"correct":26},"必须做好精确整平的工作",{"key":31,"text":139,"correct":22},"必须做好粗略整平的工作",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1261390,"水准仪与经纬仪应用脚螺旋的不同是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":26},"经纬仪脚螺旋应用于对中、精确整平，水准仪脚螺旋应用于粗略整平",{"key":24,"text":147,"correct":22},"经纬仪脚螺旋应用于粗略整平、精确整平，水准仪脚螺旋应用于粗略整平",{"key":28,"text":149,"correct":22},"经纬仪脚螺旋应用于对中、精确整平，水准仪脚螺旋应用于精确整平",{"key":31,"text":151,"correct":22},"经纬仪脚螺旋应用于粗略整平、精确整平，水准仪脚螺旋应用于精确整平",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1261391,"距离测量按（ ）即可得到测量结果。",[156,158,160,162],{"key":20,"text":157,"correct":22},"选择键",{"key":24,"text":159,"correct":26},"测距键两次",{"key":28,"text":161,"correct":22},"测距键",{"key":31,"text":163,"correct":22},"切换键",{"id":165,"libraryId":5,"type":48,"typeLabel":49,"stem":166,"options":167,"answer":55,"analysis":33},1261392,"白钢板标志法观测裂缝，用两块同样大小的钢板固定在裂缝两侧。",[168,169],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":26},{"id":171,"libraryId":5,"type":48,"typeLabel":49,"stem":172,"options":173,"answer":53,"analysis":33},1261393,"水准仪粗略整平的目的是使圆气泡居中。",[174,175],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":177,"libraryId":5,"type":48,"typeLabel":49,"stem":178,"options":179,"answer":55,"analysis":33},1261394,"全站仪只能够测角、测距和测高差。",[180,181],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":26},{"id":183,"libraryId":5,"type":48,"typeLabel":49,"stem":184,"options":185,"answer":53,"analysis":33},1261395,"用钢尺丈量出激光垂直面与轴线之间的距离，以此距离即可以控制本楼层的施工。",[186,187],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":189,"libraryId":5,"type":48,"typeLabel":49,"stem":190,"options":191,"answer":55,"analysis":33},1261396,"经纬仪的安置中，垂球对中的精度高，目前主要采用垂球对中。",[192,193],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":26},{"id":195,"libraryId":5,"type":196,"typeLabel":197,"stem":198,"options":199,"answer":211,"analysis":33},1261397,2,"多选题","经纬仪对中的基本方法有（ ）。",[200,202,204,206,208],{"key":20,"text":201,"correct":26},"光学对点器对中",{"key":24,"text":203,"correct":26},"垂球对中",{"key":28,"text":205,"correct":22},"目估对中",{"key":31,"text":207,"correct":22},"物镜对中",{"key":209,"text":210,"correct":22},"E","目镜对中","AB",{"id":213,"libraryId":5,"type":196,"typeLabel":197,"stem":214,"options":215,"answer":226,"analysis":33},1261398,"全站仪除能自动测距、测角外，还能快速完成的工作，包括（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":26},"计算平距、高差",{"key":24,"text":219,"correct":22},"计算二维坐标",{"key":28,"text":221,"correct":22},"按垂直角和距离进行放样测量",{"key":31,"text":223,"correct":26},"按坐标进行放样",{"key":209,"text":225,"correct":26},"将任一方向的水平角置为0°00′00′′","ADE",{"id":228,"libraryId":5,"type":196,"typeLabel":197,"stem":229,"options":230,"answer":241,"analysis":33},1261399,"水平位移观测的方法包括（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"角度前方交会法",{"key":24,"text":234,"correct":22},"石膏板标志法",{"key":28,"text":236,"correct":22},"白钢板标志法",{"key":31,"text":238,"correct":26},"基准线法",{"key":209,"text":240,"correct":22},"水准测量法","AD",{"id":243,"libraryId":5,"type":196,"typeLabel":197,"stem":244,"options":245,"answer":256,"analysis":33},1261400,"沉降观测时，沉降观测点的点位宜选设在（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":26},"每隔2-3根柱基上",{"key":24,"text":249,"correct":26},"高低层建筑物纵横墙交接处的两侧",{"key":28,"text":251,"correct":26},"建筑物的四角",{"key":31,"text":253,"correct":26},"大转角处",{"key":209,"text":255,"correct":22},"建筑物沿外墙每2-5m处","ABCD",{"id":258,"libraryId":5,"type":196,"typeLabel":197,"stem":259,"options":260,"answer":271,"analysis":33},1261401,"水准仪的使用步骤包括（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":26},"仪器的安置",{"key":24,"text":264,"correct":22},"对中",{"key":28,"text":266,"correct":26},"粗略整平",{"key":31,"text":268,"correct":26},"瞄准目标",{"key":209,"text":270,"correct":26},"精平","ACDE",{"id":273,"libraryId":5,"type":196,"typeLabel":197,"stem":274,"options":275,"answer":226,"analysis":33},1261402,"经纬仪的使用步骤包括（ ）。",[276,277,278,279,281],{"key":20,"text":262,"correct":26},{"key":24,"text":264,"correct":22},{"key":28,"text":266,"correct":22},{"key":31,"text":280,"correct":26},"照准目标",{"key":209,"text":282,"correct":26},"读数",{"id":284,"libraryId":5,"type":48,"typeLabel":49,"stem":285,"options":286,"answer":53,"analysis":33},1261403,"自动安平水准仪需要使水准仪达到精平状态。",[287,288],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":24,"analysis":33},1261404,"每层墙体砌筑到一定高度后，常在各层墙面上测设出（ ）m的水平标高线。",[293,295,297,299],{"key":20,"text":294,"correct":22},"+0.00",{"key":24,"text":296,"correct":26},"+0.50",{"key":28,"text":298,"correct":22},"+0.80",{"key":31,"text":300,"correct":22},"+1.50",{"id":302,"libraryId":5,"type":196,"typeLabel":197,"stem":303,"options":304,"answer":256,"analysis":33},1261405,"观测周期和观测时间应根据（ ）的变化情况而定。",[305,307,309,311,313],{"key":20,"text":306,"correct":26},"工程的性质",{"key":24,"text":308,"correct":26},"施工进度",{"key":28,"text":310,"correct":26},"地基基础",{"key":31,"text":312,"correct":26},"基础荷载",{"key":209,"text":314,"correct":22},"地基变形特征",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},1261406,"在调节水准仪粗平时，要求气泡移动的方向与左手大拇指转动脚螺旋的方向（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"相反",{"key":24,"text":322,"correct":26},"相同",{"key":28,"text":324,"correct":22},"不能确定",{"key":31,"text":326,"correct":22},"无关",{"id":328,"libraryId":5,"type":48,"typeLabel":49,"stem":329,"options":330,"answer":55,"analysis":33},1261407,"测距仪可以完成测角、测距和测高差等测量工作。",[331,332],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":26},{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1261408,"水准仪的粗略整平是通过调节（ ）来实现的。",[337,339,341,343],{"key":20,"text":338,"correct":22},"微倾螺旋",{"key":24,"text":340,"correct":26},"脚螺旋",{"key":28,"text":342,"correct":22},"对光螺旋",{"key":31,"text":344,"correct":22},"测微轮",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},1261409,"经纬仪的粗略整平是通过调节（ ）来实现的。",[349,350,352,353],{"key":20,"text":338,"correct":22},{"key":24,"text":351,"correct":26},"三脚架腿",{"key":28,"text":342,"correct":22},{"key":31,"text":344,"correct":22},{"id":355,"libraryId":5,"type":196,"typeLabel":197,"stem":356,"options":357,"answer":368,"analysis":33},1261410,"解析：5.测距仪可以完成（ ）等测量工作。",[358,360,362,364,366],{"key":20,"text":359,"correct":26},"距离",{"key":24,"text":361,"correct":26},"面积",{"key":28,"text":363,"correct":22},"高度",{"key":31,"text":365,"correct":22},"角度",{"key":209,"text":367,"correct":26},"体积","ABE",{"id":370,"libraryId":5,"type":48,"typeLabel":49,"stem":371,"options":372,"answer":53,"analysis":33},1261411,"角度前方交会法是利用两点之间的坐标差值，计算该点的水平位移量。",[373,374],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":28,"analysis":33},1261412,"某项目施工需进行木门的安装施工，其中，普通木门200樘，甲级防火门30樘，乙级防火门100樘，丙级防火门80樘。试回答以下问题： 使用发泡剂安装门套时，门套与墙体间的留缝限值应控制在（ ）mm左右。",[379,381,383,385],{"key":20,"text":380,"correct":22},"5",{"key":24,"text":382,"correct":22},"10",{"key":28,"text":384,"correct":26},"20",{"key":31,"text":386,"correct":22},"50",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":28,"analysis":33},1261413,"下列关于门窗工程成品保护说法中，错误的是（ ）。",[391,393,395,397],{"key":20,"text":392,"correct":22},"门框完成后，在1.2m以下用9层板将框周围包钉好，防止碰撞，门窗套与墙面交接处贴纸胶带",{"key":24,"text":394,"correct":22},"铝合金门窗在安装前必须粘贴塑料保护胶带，以防止水泥砂浆的腐蚀和污染",{"key":28,"text":396,"correct":26},"在进行铝合金门窗与墙体的接缝处打密封胶时，应等待胶完全晾干后清理多余的胶",{"key":31,"text":398,"correct":22},"在风天施工时要及时将门窗关闭好，以防止门窗玻璃打碎和门窗框松动、变形",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":31,"analysis":33},1261414,"某工程地面浇筑混凝土找平层所需劳动量为1200个工日，可分为劳动量相等的3个施工段组织流水施工，每天采用两班制，每段投入的人工数为40个工日，其流水节拍值为（ ）d。",[403,405,406,408],{"key":20,"text":404,"correct":22},"15",{"key":24,"text":382,"correct":22},{"key":28,"text":407,"correct":22},"8",{"key":31,"text":380,"correct":26},{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":28,"analysis":33},1261415,"某室内装饰工程项目部关于施工顺序的安排，正确的是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"风管安装→墙面涂饰→吊顶安装→地面铺贴",{"key":24,"text":416,"correct":22},"吊顶安装→风管安装→墙面涂饰→地面铺贴",{"key":28,"text":418,"correct":26},"风管安装→吊顶安装→地面铺贴→墙面涂饰",{"key":31,"text":420,"correct":22},"地面铺贴→吊顶安装→风管安装→墙面涂饰",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":28,"analysis":33},1261416,"墙、地面抹灰与安装木门框、木门扇之间的施工顺序应为（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"抹灰→安装门框→安装门扇",{"key":24,"text":428,"correct":22},"安装门框→抹灰→安装门扇",{"key":28,"text":430,"correct":26},"安装门框→安装门扇→抹灰",{"key":31,"text":432,"correct":22},"地面抹灰一安装门框→墙面抹灰→安装门扇",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},1261417,"下列关于施工段的划分要求，说法错误的是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"施工段的分界同施工对象的结构界限尽量一致",{"key":24,"text":440,"correct":22},"各施工段上所消耗的劳动量尽量相近",{"key":28,"text":442,"correct":22},"要有足够的工作面",{"key":31,"text":444,"correct":26},"分层又分段时，每层施工段数应少于施工过程数",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},1261418,"下列成品保护措施的说法，错误的是（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":26},"管道保温、灯具、面板、风口防污染处理，暖气管道上的阀门应经常开关",{"key":24,"text":452,"correct":22},"整体完工后应及时断水、断电",{"key":28,"text":454,"correct":22},"门扇应及时落锁，如锁具未安装时应使用特殊处理将门扇固定，禁止随意进人",{"key":31,"text":456,"correct":22},"对样板间进行挑选，当外来人员参观时应固定房间，全面保护、专人陪同",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":31,"analysis":33},1261419,"某分项工程的工程量为1000m3，该分项工程的人工时间定额为0.1工日\u002Fm3，计划每天安排两班人施工，每班5人，则其持续时间为（ ）。",[461,463,464,466],{"key":20,"text":462,"correct":22},"100",{"key":24,"text":386,"correct":22},{"key":28,"text":465,"correct":22},"40",{"key":31,"text":382,"correct":26},{"id":468,"libraryId":5,"type":48,"typeLabel":49,"stem":469,"options":470,"answer":53,"analysis":33},1261420,"施工段的划分应尽量与工程对象平面特点相适应，尽量维护结构整体性，利用结构界限，如，沉降缝、抗震缝、温度缝、单元分界处、转角处等。",[471,472],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":474,"libraryId":5,"type":48,"typeLabel":49,"stem":475,"options":476,"answer":53,"analysis":33},1261421,"施工段划分应能保证工程量大或者技术上关键的主导施工过程连续施工。",[477,478],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":480,"libraryId":5,"type":48,"typeLabel":49,"stem":481,"options":482,"answer":55,"analysis":33},1261422,"室内装饰装修采用自上而下的施工起点流向，其优点是工期短，可提前获得经济效益。",[483,484],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":26},{"id":486,"libraryId":5,"type":48,"typeLabel":49,"stem":487,"options":488,"answer":53,"analysis":33},1261423,"施工段划分的数目应当符合最小劳动组合和最小工作面的要求。",[489,490],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":492,"libraryId":5,"type":48,"typeLabel":49,"stem":493,"options":494,"answer":53,"analysis":33},1261424,"各施工段的劳动量应尽量相等，以保证各施工过程连续施工、均衡施工。若不相同时，应将先施工的施工段划得大一些，以免从第二个施工过程开始产生“阻塞”。",[495,496],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":498,"libraryId":5,"type":48,"typeLabel":49,"stem":499,"options":500,"answer":53,"analysis":33},1261425,"楼梯踏步面层采用麻袋片进行保护，在焊接扶手时，麻袋片局部要进行湿润。",[501,502],{"key":20,"text":53,"correct":26},{"key":24,"text":55,"correct":22},{"id":504,"libraryId":5,"type":196,"typeLabel":197,"stem":505,"options":506,"answer":517,"analysis":33},1261426,"下列关于细部工程中装饰花格成品保护的说法，正确的有（ ）。",[507,509,511,513,515],{"key":20,"text":508,"correct":26},"半成品、成品要防晒、防潮处理",{"key":24,"text":510,"correct":26},"半成品、成品要防火处理",{"key":28,"text":512,"correct":26},"半成品未涂饰前，应保持表面洁净",{"key":31,"text":514,"correct":22},"小型花格到现场后必须现场拼装，然后再安装",{"key":209,"text":516,"correct":26},"安装后的花格表面应洁净，宜用塑料薄膜遮护","ABCE",{"id":519,"libraryId":5,"type":196,"typeLabel":197,"stem":520,"options":521,"answer":226,"analysis":33},1261427,"下列关于施工组织的说法，正确的有（ ）。",[522,524,526,528,530],{"key":20,"text":523,"correct":26},"根据施工方案的要求，可将一些相同的施工工艺合并为一个施工过程",{"key":24,"text":525,"correct":22},"工程量小的施工过程不能与其他施工过程合并",{"key":28,"text":527,"correct":22},"砂浆、混凝土的制备过程可以划入流水施工过程，进入流水施工计划",{"key":31,"text":529,"correct":26},"对于小型工程，施工过程的划分可以细一些",{"key":209,"text":531,"correct":26},"划分施工段时，应注意主要专业工种在各个施工段上的工程量大致相等，相差幅度不宜超过15％",{"id":533,"libraryId":5,"type":196,"typeLabel":197,"stem":534,"options":535,"answer":546,"analysis":33},1261428,"下列关于室内顶棚、墙面及地面施工顺序的说法，正确的有（ ）。",[536,538,540,542,544],{"key":20,"text":537,"correct":26},"可采用顶棚→墙面→地面的顺序施工",{"key":24,"text":539,"correct":22},"可采用墙面→顶棚→地面的顺序施工",{"key":28,"text":541,"correct":22},"可采用墙面→地面→顶棚的顺序施工",{"key":31,"text":543,"correct":22},"可采用顶棚→地面→墙面的顺序",{"key":209,"text":545,"correct":26},"施工可采用地面一墙面→顶棚的顺序施工","AE",[548,551,554,557,560,563],{"id":15,"name":549,"category":7,"favorite":550},"领导干部任职前廉政法规知识测试题",92,{"id":552,"name":553,"category":7,"favorite":15},595,"建筑结构与设备",{"id":555,"name":556,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":558,"name":559,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":561,"name":562,"category":7,"favorite":8},534,"BIM工程师",{"id":564,"name":562,"category":7,"favorite":8},535]