[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,10,50,1193,[13,28,34,40,46,52,72,87,102,117,132,146,160,174,188,202,217,230,244,259,272,286,300,314,329,343,357,372,384,396,402,408,420,432,444,456,468,474,489,495,501,513,527,536,550,556,568,574,588,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1261124,3,"判断题","项目的整体利益和施工方本身的利益是对立统一关系，两者有其统一的一面，有其对立的一面。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1261125,"工程造价的直意就是工程的建造所需的费用。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1261126,"施工预算就是施工图预算。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1261127,"合同文件和成本计划时成本控制的目标，进度报告和工程变更与索赔资料时成本控制过程中的静态资料。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1261128,"一般来说，一个施工项目成本计划应包括从开工到竣工所必需的施工成本。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":54,"typeLabel":55,"stem":56,"options":57,"answer":71,"analysis":27},1261129,2,"多选题","分包工程成本核算要求包括（ ）。",[58,60,62,65,68],{"key":20,"text":59,"correct":22},"包清工工程，纳入人工费一外包人工费内核算",{"key":24,"text":61,"correct":26},"对机械作业分包产值统计的范围，不仅统计分包费用，还包括物耗价值",{"key":63,"text":64,"correct":26},"C","部分分项分包工程，纳入结构件费内核算",{"key":66,"text":67,"correct":22},"D","双包工程，是指将整幢建筑物以包工包料的形式分包给外单位施工的工程。可根据承包合同取费情况和发包（双包）合同支付情况，即上下合同差，测足目标盈利率",{"key":69,"text":70,"correct":26},"E","以收定支，人为调节成本","AD",{"id":73,"libraryId":5,"type":54,"typeLabel":55,"stem":74,"options":75,"answer":86,"analysis":27},1261130,"施工成本分析的基本方法包括（ ）等。",[76,78,80,82,84],{"key":20,"text":77,"correct":22},"比较法",{"key":24,"text":79,"correct":22},"因素分析法",{"key":63,"text":81,"correct":26},"判断法",{"key":66,"text":83,"correct":26},"偏差分析法",{"key":69,"text":85,"correct":22},"比率法","ABE",{"id":88,"libraryId":5,"type":54,"typeLabel":55,"stem":89,"options":90,"answer":101,"analysis":27},1261131,"某施工项目，拟对施工成本进行预测，预测得到的成本估算可以用做该施工项目（ ）的依据。",[91,93,95,97,99],{"key":20,"text":92,"correct":22},"成本决策",{"key":24,"text":94,"correct":22},"成本计划",{"key":63,"text":96,"correct":26},"成本控制",{"key":66,"text":98,"correct":26},"成本管理",{"key":69,"text":100,"correct":26},"成本考核","AB",{"id":103,"libraryId":5,"type":54,"typeLabel":55,"stem":104,"options":105,"answer":116,"analysis":27},1261132,"下列费用属于建筑安装工程施工措施费用的是（ ）。",[106,108,110,112,114],{"key":20,"text":107,"correct":22},"大型机械进出场及安装拆除费",{"key":24,"text":109,"correct":26},"职工工伤保险费",{"key":63,"text":111,"correct":22},"材料二次搬运费用",{"key":66,"text":113,"correct":22},"施工排水降水费用",{"key":69,"text":115,"correct":26},"施工现场办公费","ACD",{"id":118,"libraryId":5,"type":54,"typeLabel":55,"stem":119,"options":120,"answer":131,"analysis":27},1261133,"工程量清单计价模式下的工程造价的内容组成有（ ）。",[121,123,125,127,129],{"key":20,"text":122,"correct":22},"分部分项工程费",{"key":24,"text":124,"correct":22},"措施项目费",{"key":63,"text":126,"correct":22},"规费",{"key":66,"text":128,"correct":22},"其他项目费",{"key":69,"text":130,"correct":26},"利润","ABCD",{"id":133,"libraryId":5,"type":54,"typeLabel":55,"stem":134,"options":135,"answer":131,"analysis":27},1261134,"施工员的成本管理责任有（ ）。",[136,138,140,142,144],{"key":20,"text":137,"correct":22},"根据项目施工的计划进度，及时组织材料、构件的供应，保证项目施工的顺利进行，防止因停工待料造成的损失",{"key":24,"text":139,"correct":22},"严格执行工程技术规范和以预防为主的方针，确保工程质量，减少零星修补，消灭质量事故，不断降低质量成本",{"key":63,"text":141,"correct":22},"根据工程特点和设计要求，运用自身的技术优势，采取实用、有效的技术组织措施和合理化建议",{"key":66,"text":143,"correct":22},"严格执行安全操作规程，减少一般安全事故，消灭重大人身伤亡事故和设备事故，确保安全生产，将事故减少到最低限度",{"key":69,"text":145,"correct":26},"采用低价材料代替原合同中规定的材料",{"id":147,"libraryId":5,"type":54,"typeLabel":55,"stem":148,"options":149,"answer":131,"analysis":27},1261135,"工程变更包括（ ）。",[150,152,154,156,158],{"key":20,"text":151,"correct":22},"工程量变更",{"key":24,"text":153,"correct":22},"工程项目变更",{"key":63,"text":155,"correct":22},"进度计划的变更",{"key":66,"text":157,"correct":22},"施工条件的变更",{"key":69,"text":159,"correct":26},"预算定额的变更",{"id":161,"libraryId":5,"type":54,"typeLabel":55,"stem":162,"options":163,"answer":131,"analysis":27},1261136,"施工成本计划应满足的要求有（ ）。",[164,166,168,170,172],{"key":20,"text":165,"correct":22},"合同规定的项目质量和工期要求。",{"key":24,"text":167,"correct":22},"组织对项目成本管理目标的要求。",{"key":63,"text":169,"correct":22},"以经济合理的项目实施方案为基础的要求。",{"key":66,"text":171,"correct":22},"有关定额及市场价格的要求。",{"key":69,"text":173,"correct":26},"高于社会平均收益率",{"id":175,"libraryId":5,"type":54,"typeLabel":55,"stem":176,"options":177,"answer":116,"analysis":27},1261137,"计划成本对于（ ），具有十分重要的作用。",[178,180,182,184,186],{"key":20,"text":179,"correct":22},"降低施工项目成本",{"key":24,"text":181,"correct":26},"建立和健全施工项目成本管理责任制",{"key":63,"text":183,"correct":22},"控制施工过程中生产费用",{"key":66,"text":185,"correct":22},"加强企业的经济核算",{"key":69,"text":187,"correct":26},"加强项目经理部的经济核算",{"id":189,"libraryId":5,"type":54,"typeLabel":55,"stem":190,"options":191,"answer":101,"analysis":27},1261138,"对竣工工程的成本核算，应区分为（ ）。",[192,194,196,198,200],{"key":20,"text":193,"correct":22},"竣工工程现场成本",{"key":24,"text":195,"correct":22},"竣工工程完全成本",{"key":63,"text":197,"correct":26},"竣工工程核算成本",{"key":66,"text":199,"correct":26},"竣工工程预算成本",{"key":69,"text":201,"correct":26},"竣工工程计划成本",{"id":203,"libraryId":5,"type":54,"typeLabel":55,"stem":204,"options":205,"answer":216,"analysis":27},1261139,"属于施工措施费的有（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":22},"模板使用费",{"key":24,"text":209,"correct":22},"施工降排水费",{"key":63,"text":211,"correct":22},"脚手架工程费",{"key":66,"text":213,"correct":26},"工伤保险费",{"key":69,"text":215,"correct":26},"教育附加费","ABC",{"id":218,"libraryId":5,"type":54,"typeLabel":55,"stem":219,"options":220,"answer":131,"analysis":27},1261140,"直接成本包括内容有（ ）。",[221,223,225,227,229],{"key":20,"text":222,"correct":22},"人工费",{"key":24,"text":224,"correct":22},"材料费",{"key":63,"text":226,"correct":22},"施工机械使用费",{"key":66,"text":228,"correct":22},"施工措施费",{"key":69,"text":126,"correct":26},{"id":231,"libraryId":5,"type":54,"typeLabel":55,"stem":232,"options":233,"answer":71,"analysis":27},1261141,"施工成本计划是确定和编制施工项目在计划期内的（ ）等的书面方案。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"生产费用",{"key":24,"text":237,"correct":26},"预算成本",{"key":63,"text":239,"correct":26},"固定成本",{"key":66,"text":241,"correct":22},"成本水平",{"key":69,"text":243,"correct":26},"可变成本",{"id":245,"libraryId":5,"type":54,"typeLabel":55,"stem":246,"options":247,"answer":258,"analysis":27},1261142,"以下属施工成本管理任务的是（ ）。",[248,250,252,254,256],{"key":20,"text":249,"correct":26},"施工成本策划",{"key":24,"text":251,"correct":22},"成本预测",{"key":63,"text":253,"correct":22},"施工成本计划",{"key":66,"text":255,"correct":22},"施工成本控制",{"key":69,"text":257,"correct":22},"施工成本核算与分析","BCDE",{"id":260,"libraryId":5,"type":54,"typeLabel":55,"stem":261,"options":262,"answer":271,"analysis":27},1261143,"施工成本管理的任务和环节主要包括（ ）。",[263,264,266,267,269],{"key":20,"text":253,"correct":22},{"key":24,"text":265,"correct":26},"施工成本经营",{"key":63,"text":255,"correct":22},{"key":66,"text":268,"correct":22},"施工成本核算",{"key":69,"text":270,"correct":22},"施工成本分析与考核","ACDE",{"id":273,"libraryId":5,"type":54,"typeLabel":55,"stem":274,"options":275,"answer":216,"analysis":27},1261144,"施工成本控制需按（ ）进行有效控制。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"事先控制",{"key":24,"text":279,"correct":22},"事中控制",{"key":63,"text":281,"correct":22},"事后控制",{"key":66,"text":283,"correct":26},"全面控制",{"key":69,"text":285,"correct":26},"全员控制",{"id":287,"libraryId":5,"type":54,"typeLabel":55,"stem":288,"options":289,"answer":216,"analysis":27},1261145,"施工项目成本核算的第一个基本环节是按照规定的成本开支范围，分阶段地对施工费用进行归集，计算出施工费用的额定发生额和实际发生额，核算所提供的各种成本信息，（ ），作为反馈信息指导下一步成本控制。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"是成本预测、成本计划的结果",{"key":24,"text":293,"correct":22},"是成本计划、成本控制的结果",{"key":63,"text":295,"correct":22},"又成为成本分析和成本考核等环节的依据",{"key":66,"text":297,"correct":26},"又成为成本分析和成本计划等环节的依据",{"key":69,"text":299,"correct":26},"又成为成本计划和成本考核等环节的依据",{"id":301,"libraryId":5,"type":54,"typeLabel":55,"stem":302,"options":303,"answer":216,"analysis":27},1261146,"施工成本计划指标有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"数量指标",{"key":24,"text":307,"correct":22},"质量指标",{"key":63,"text":309,"correct":22},"效益指标",{"key":66,"text":311,"correct":26},"进度指标",{"key":69,"text":313,"correct":26},"产量指标",{"id":315,"libraryId":5,"type":54,"typeLabel":55,"stem":316,"options":317,"answer":328,"analysis":27},1261147,"有效控制建设工程造价的组织措施包括（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":26},"重视工程设计多方案的选择",{"key":24,"text":321,"correct":22},"明确工程造价管理职能分工",{"key":63,"text":323,"correct":26},"严格审查施工组织设计",{"key":66,"text":325,"correct":26},"采取对节约投资有利的奖励措施",{"key":69,"text":327,"correct":22},"明确造价控制者及其任务","BE",{"id":330,"libraryId":5,"type":54,"typeLabel":55,"stem":331,"options":332,"answer":131,"analysis":27},1261148,"成本偏差的控制，分析是关键，纠偏是核心。成本纠偏的措施包括（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"组织措施",{"key":24,"text":336,"correct":22},"合同措施",{"key":63,"text":338,"correct":22},"经济措施",{"key":66,"text":340,"correct":22},"技术措施",{"key":69,"text":342,"correct":26},"环境措施",{"id":344,"libraryId":5,"type":345,"typeLabel":346,"stem":347,"options":348,"answer":66,"analysis":27},1261149,1,"单选题","下列不属于工程造价特点的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":26},"大额性",{"key":24,"text":352,"correct":26},"单件性",{"key":63,"text":354,"correct":26},"层次性",{"key":66,"text":356,"correct":22},"复杂性",{"id":358,"libraryId":5,"type":54,"typeLabel":55,"stem":359,"options":360,"answer":371,"analysis":27},1261150,"下列关于分部分项工程成本分析的表述正确的是（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":26},"分部分项工程成本分析的对象是拟完成的分部分项工程",{"key":24,"text":364,"correct":22},"分析的方法是进行预算成本、目标成本和实际成本的“三算”对比",{"key":63,"text":366,"correct":22},"预算成本来自投标报价成本",{"key":66,"text":368,"correct":22},"目标成本来自施工预算",{"key":69,"text":370,"correct":26},"施工成本分析的基本方法包括比较法、统计分析法、等价计算法、比率法等","BCD",{"id":373,"libraryId":5,"type":345,"typeLabel":346,"stem":374,"options":375,"answer":63,"analysis":27},1261151,"不属于施工组织总设计技术经济指标的是（ ）。",[376,378,380,382],{"key":20,"text":377,"correct":26},"劳动生产率",{"key":24,"text":379,"correct":26},"投资利润率",{"key":63,"text":381,"correct":22},"项目施工成本",{"key":66,"text":383,"correct":26},"机械化程度",{"id":385,"libraryId":5,"type":345,"typeLabel":346,"stem":386,"options":387,"answer":24,"analysis":27},1261152,"SV＝BCWP—ACWP，由于两项参数均以预算值（计划值）作为计算基准，所以两项参数之差，反映项目进展的（ ）。",[388,390,392,394],{"key":20,"text":389,"correct":26},"费用偏差",{"key":24,"text":391,"correct":22},"进度偏差",{"key":63,"text":393,"correct":26},"费用绝对偏差",{"key":66,"text":395,"correct":26},"进度相对偏差",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":25,"analysis":27},1261153,"偏差分析可采用不同的表达方法，常用的有横道图法、差值法和赢得值评价曲线法。",[400,401],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":21,"analysis":27},1261154,"施工项目成本是指建筑企业以施工项目作为成本核算对象的施工过程中所消耗的生产资料转移价值和劳动者的必要劳动所创造的价值的数字形式。",[406,407],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":409,"libraryId":5,"type":345,"typeLabel":346,"stem":410,"options":411,"answer":66,"analysis":27},1261155,"施工成本控制中最具实质性的一步是（ ），因为通过它最终达到有效控制施工成本的目的。",[412,414,416,418],{"key":20,"text":413,"correct":26},"比较",{"key":24,"text":415,"correct":26},"检查",{"key":63,"text":417,"correct":26},"预测",{"key":66,"text":419,"correct":22},"纠偏",{"id":421,"libraryId":5,"type":345,"typeLabel":346,"stem":422,"options":423,"answer":63,"analysis":27},1261156,"下列哪项资料属于施工成本计划的编制依据。（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":26},"设计概算",{"key":24,"text":427,"correct":26},"投资估算",{"key":63,"text":429,"correct":22},"合同报价书",{"key":66,"text":431,"correct":26},"竣工决算",{"id":433,"libraryId":5,"type":345,"typeLabel":346,"stem":434,"options":435,"answer":20,"analysis":27},1261157,"内容分为事前的成本预测分析、（ ）、事后的成本监控。",[436,438,440,442],{"key":20,"text":437,"correct":22},"事中的成本分析",{"key":24,"text":439,"correct":26},"过程中的成本分析",{"key":63,"text":441,"correct":26},"日常的成本分析",{"key":66,"text":443,"correct":26},"施工中的成本分析",{"id":445,"libraryId":5,"type":345,"typeLabel":346,"stem":446,"options":447,"answer":63,"analysis":27},1261158,"施工成本管理合同措施的主要内容之一是处理合同执行过程中的（ ），以控制施工成本。",[448,450,452,454],{"key":20,"text":449,"correct":26},"违约问题",{"key":24,"text":451,"correct":26},"控制问题",{"key":63,"text":453,"correct":22},"索赔问题",{"key":66,"text":455,"correct":26},"纠纷问题",{"id":457,"libraryId":5,"type":345,"typeLabel":346,"stem":458,"options":459,"answer":63,"analysis":27},1261159,"施工项目成本计划是（ ）编制的项目经理部对项目施工成本进行计划管理的指导性文件。",[460,462,464,466],{"key":20,"text":461,"correct":26},"施工开始阶段",{"key":24,"text":463,"correct":26},"施工筹备阶段",{"key":63,"text":465,"correct":22},"施工准备阶段",{"key":66,"text":467,"correct":26},"施工进行阶段成本分析的",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":21,"analysis":27},1261160,"完全成本法是把企业生产经营发生的一切费用全部吸收到产品成本之中。",[472,473],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":475,"libraryId":5,"type":54,"typeLabel":55,"stem":476,"options":477,"answer":488,"analysis":27},1261161,"提高价值的途径有（ ）。",[478,480,482,484,486],{"key":20,"text":479,"correct":22},"功能提高，成本不变",{"key":24,"text":481,"correct":22},"功能不变，成本降低",{"key":63,"text":483,"correct":22},"功能提高，成本降低",{"key":66,"text":485,"correct":22},"降低辅助功能，大幅度降低成本",{"key":69,"text":487,"correct":22},"成本稍有提高，大大提高功能","ABCDE",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":21,"analysis":27},1261162,"施工阶段是控制建设工程项目成本发生的主要阶段。",[493,494],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":25,"analysis":27},1261163,"施工成本分析是在施工成本预测的基础上，对成本的形成过程和影响因素进行分析。",[499,500],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":502,"libraryId":5,"type":345,"typeLabel":346,"stem":503,"options":504,"answer":20,"analysis":27},1261164,"某项目进行成本偏差分析，结果为：已完工作预算成本（BCWP）—已完工作实际成本（ACWP）0。则说明（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"成本超支，进度提前",{"key":24,"text":508,"correct":26},"成本节约，进度提前",{"key":63,"text":510,"correct":26},"成本超支，进度拖后",{"key":66,"text":512,"correct":26},"成本节约，进度拖后",{"id":514,"libraryId":5,"type":54,"typeLabel":55,"stem":515,"options":516,"answer":526,"analysis":27},1261165,"施工成本控制的依据包括：（ ）。",[517,518,520,522,524],{"key":20,"text":151,"correct":22},{"key":24,"text":519,"correct":22},"工程承包合同",{"key":63,"text":521,"correct":26},"工程竣工期限",{"key":66,"text":523,"correct":22},"进度报告",{"key":69,"text":525,"correct":22},"工程变更","ABDE",{"id":528,"libraryId":5,"type":345,"typeLabel":346,"stem":529,"options":530,"answer":24,"analysis":27},1261166,"（ ）是以货币形式编制施工项目在计划期内的生产费用、成本水平、成本降低率以及为降低成本所采取的主要措施和规划的书面方案。",[531,533,534,535],{"key":20,"text":532,"correct":26},"施上成本预测",{"key":24,"text":253,"correct":22},{"key":63,"text":255,"correct":26},{"key":66,"text":268,"correct":26},{"id":537,"libraryId":5,"type":54,"typeLabel":55,"stem":538,"options":539,"answer":258,"analysis":27},1261167,"下列有关施工成本考核的说法中，正确的是（ ）。",[540,542,544,546,548],{"key":20,"text":541,"correct":26},"揭示成本变动规律，寻找降低施工项目成本的途径",{"key":24,"text":543,"correct":22},"以施工成本降低额和降低率作为成本考核的主要指标",{"key":63,"text":545,"correct":22},"可分别考核组织管理层和项目经理部",{"key":66,"text":547,"correct":22},"是对成本指标完成情况的总结和评价",{"key":69,"text":549,"correct":22},"是实现成本目标责任制的保证",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":25,"analysis":27},1261168,"工程成本则是围绕工程而发生的资源耗费的物质体现，包括了生命周期各阶段的资源耗费。",[554,555],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":557,"libraryId":5,"type":345,"typeLabel":346,"stem":558,"options":559,"answer":20,"analysis":27},1261169,"按成本性质划分的单位工程成本汇总表，根据清单项目的造价分析，分别对人工费、材料费、机械费、措施费、（ ）进行汇总，形成单位工程成本计划表。",[560,562,564,566],{"key":20,"text":561,"correct":22},"企业管理费和税费",{"key":24,"text":563,"correct":26},"直接费和间接费",{"key":63,"text":565,"correct":26},"间接费和企业管理费",{"key":66,"text":567,"correct":26},"间接费、利润和税金",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":21,"analysis":27},1261170,"直接成本是指施工过程中直接耗费的构成工程实体或有助于工程形成的各项支出，包括人工费、材料费、机械使用费和施工措施费等。",[572,573],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":575,"libraryId":5,"type":54,"typeLabel":55,"stem":576,"options":577,"answer":488,"analysis":27},1261171,"工程建设的特殊性决定了工程造价具有大额性、单件性、多次性、层次性等特点，这些特点又决定了工程计价具有（ ）的特点。",[578,580,582,584,586],{"key":20,"text":579,"correct":22},"计价的单件性",{"key":24,"text":581,"correct":22},"计价的多样性",{"key":63,"text":583,"correct":22},"计价的组合性",{"key":66,"text":585,"correct":22},"计价依据的复杂性",{"key":69,"text":587,"correct":22},"计价的多次性",{"id":589,"libraryId":5,"type":54,"typeLabel":55,"stem":590,"options":591,"answer":488,"analysis":27},1261172,"影响工程成本的因素很多，主要有（ ）。",[592,594,596,598,600],{"key":20,"text":593,"correct":22},"政策法规性因素",{"key":24,"text":595,"correct":22},"地区性与市场性因素",{"key":63,"text":597,"correct":22},"设计因素",{"key":66,"text":599,"correct":22},"施工因素",{"key":69,"text":601,"correct":22},"人员素质因素",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":21,"analysis":27},1261173,"项目的账表和管理台账不仅可以用于项目成本的核算，还可以用于对项目成本管理工作的分析、评价和考核。",[606,607],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[609,612,615,618,621,624],{"id":345,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":345},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":345},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":345},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]