[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-844-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":551},{"id":5,"name":6,"category":7,"favorite":8},844,"(装饰施工)专业管理实务 岗位知识","建筑工程",0,1,50,1193,[13,33,45,57,69,81,92,104,116,125,137,148,160,172,184,196,204,216,228,236,248,256,268,280,288,296,305,313,325,337,345,354,362,374,383,391,403,411,420,432,443,454,462,474,486,494,506,518,530,542],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":19,"analysis":32},1260671,"单选题","埋在地下或地板下的排水管道的检查口，应设在检查井内。井底表面标高与检查口的法兰相平，井底表面应有（ ）的坡度，坡向检查口。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","5%",true,{"key":23,"text":24,"correct":25},"B","10%",false,{"key":27,"text":28,"correct":25},"C","15％",{"key":30,"text":31,"correct":25},"D","20％","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":19,"analysis":32},1260672,"等交底双方均认可样板操作并签字后，按（ ）做法施工。",[37,39,41,43],{"key":19,"text":38,"correct":21},"样板",{"key":23,"text":40,"correct":25},"标准",{"key":27,"text":42,"correct":25},"规范",{"key":30,"text":44,"correct":25},"规程",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},1260673,"给水引入管与排水排出管的水平净距不得小于（ ）m。",[49,51,53,55],{"key":19,"text":50,"correct":21},"1",{"key":23,"text":52,"correct":25},"1.5",{"key":27,"text":54,"correct":25},"2",{"key":30,"text":56,"correct":25},"2.5",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":19,"analysis":32},1260674,"轻钢龙骨隔断施工，石膏板一般用自攻螺钉固定，板边钉距为（ ）mm。",[61,63,65,67],{"key":19,"text":62,"correct":21},"200",{"key":23,"text":64,"correct":25},"250",{"key":27,"text":66,"correct":25},"300",{"key":30,"text":68,"correct":25},"400",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":19,"analysis":32},1260675,"重点工程或规模大、技术复杂的工程，由（ ）组织有关部门向分公司和有关施工单位交底。",[73,75,77,79],{"key":19,"text":74,"correct":21},"公司总工程师",{"key":23,"text":76,"correct":25},"分公司主任工程师或项目部的技术负责人",{"key":27,"text":78,"correct":25},"工长",{"key":30,"text":80,"correct":25},"班组长",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":19,"analysis":32},1260676,"水泥砂浆整体楼地面垫层施工工艺：（ ）。",[85,87,89,90],{"key":19,"text":86,"correct":21},"混凝土（砂浆）搅拌→基底处理→浇筑→压实→养护",{"key":23,"text":88,"correct":25},"基底处理→混凝土（砂浆）搅拌→浇筑→压实→养护",{"key":27,"text":86,"correct":25},{"key":30,"text":91,"correct":25},"混凝土（砂浆）搅拌→浇筑→压实→养护",{"id":93,"libraryId":5,"type":9,"typeLabel":15,"stem":94,"options":95,"answer":19,"analysis":32},1260677,"管内导线包括绝缘层在内的总截面积应不大于管内截面积的（ ）。",[96,98,100,102],{"key":19,"text":97,"correct":21},"40%",{"key":23,"text":99,"correct":25},"45%",{"key":27,"text":101,"correct":25},"50%",{"key":30,"text":103,"correct":25},"60%",{"id":105,"libraryId":5,"type":9,"typeLabel":15,"stem":106,"options":107,"answer":19,"analysis":32},1260678,"一般敞开式灯具，室内灯头对地面距离不小于下列数值（采用安全电压时除外）（ ）。",[108,110,112,114],{"key":19,"text":109,"correct":21},"2m",{"key":23,"text":111,"correct":25},"2.5m",{"key":27,"text":113,"correct":25},"3m",{"key":30,"text":115,"correct":25},"3.5m",{"id":117,"libraryId":5,"type":9,"typeLabel":15,"stem":118,"options":119,"answer":19,"analysis":32},1260679,"外墙贴面砖工程的施工验收中，室外每个检验批每（ ）㎡应至少抽查一处，每处不得小于10㎡。",[120,122,123,124],{"key":19,"text":121,"correct":21},"100",{"key":23,"text":62,"correct":25},{"key":27,"text":66,"correct":25},{"key":30,"text":68,"correct":25},{"id":126,"libraryId":5,"type":9,"typeLabel":15,"stem":127,"options":128,"answer":19,"analysis":32},1260680,"抹灰工程中，对蜂窝、麻面、露筋等应剔到实处，后用（ ）水泥砂浆分层补平。",[129,131,133,135],{"key":19,"text":130,"correct":21},"1:3",{"key":23,"text":132,"correct":25},"1:2",{"key":27,"text":134,"correct":25},"1:2.5",{"key":30,"text":136,"correct":25},"1:1",{"id":138,"libraryId":5,"type":9,"typeLabel":15,"stem":139,"options":140,"answer":19,"analysis":32},1260681,"板材隔墙工程的检查数量应每个检验批应至少抽查（ ），并不得少于3间。",[141,142,144,146],{"key":19,"text":24,"correct":21},{"key":23,"text":143,"correct":25},"15%",{"key":27,"text":145,"correct":25},"20%",{"key":30,"text":147,"correct":25},"30%",{"id":149,"libraryId":5,"type":9,"typeLabel":15,"stem":150,"options":151,"answer":19,"analysis":32},1260682,"外墙贴面砖工程的施工验收中，检验批划分，相同材料、工艺和施工条件的室外饰面板（砖）工程每（ ）㎡应划分为一个检验批，不足500㎡也应划分为一个检验批。",[152,154,156,158],{"key":19,"text":153,"correct":21},"500～1000",{"key":23,"text":155,"correct":25},"600～1200",{"key":27,"text":157,"correct":25},"1000",{"key":30,"text":159,"correct":25},"1200",{"id":161,"libraryId":5,"type":9,"typeLabel":15,"stem":162,"options":163,"answer":19,"analysis":32},1260683,"软包工程施工工艺：（ ）。",[164,166,168,170],{"key":19,"text":165,"correct":21},"基层处理→弹线→计算用料→制作安装→修整",{"key":23,"text":167,"correct":25},"弹线→计算用料→制作安装→修整",{"key":27,"text":169,"correct":25},"基层处理→弹线→制作安装→修整",{"key":30,"text":171,"correct":25},"基层处理→弹线→计算用料→制作安装",{"id":173,"libraryId":5,"type":9,"typeLabel":15,"stem":174,"options":175,"answer":19,"analysis":32},1260684,"装有白炽灯泡的吸顶灯具，灯泡不应紧贴灯罩；当灯泡与绝缘台间距离小于（ ）mm时，灯泡与绝缘台间应采取隔热措施。",[176,178,180,182],{"key":19,"text":177,"correct":21},"5",{"key":23,"text":179,"correct":25},"6",{"key":27,"text":181,"correct":25},"7",{"key":30,"text":183,"correct":25},"8",{"id":185,"libraryId":5,"type":9,"typeLabel":15,"stem":186,"options":187,"answer":19,"analysis":32},1260685,"板块地面施工工艺：（ ）。",[188,190,192,194],{"key":19,"text":189,"correct":21},"基层处理→水泥砂浆找平层→测设十字控制线、标高线→排砖试铺→铺砖→养护→贴踢脚板面砖→勾缝",{"key":23,"text":191,"correct":25},"水泥砂浆找平层→测设十字控制线、标高线→排砖试铺→铺砖→养护→贴踢脚板面砖→勾缝",{"key":27,"text":193,"correct":25},"基层处理→水泥砂浆找平层→排砖试铺→铺砖→养护→贴踢脚板面砖→勾缝",{"key":30,"text":195,"correct":25},"基层处理→水泥砂浆找平层→测设十字控制线、标高线→铺砖→养护→贴踢脚板面砖→勾缝",{"id":197,"libraryId":5,"type":9,"typeLabel":15,"stem":198,"options":199,"answer":19,"analysis":32},1260686,"饮食业工艺设备引出的排水管及饮用水水箱的溢流管，不得与污水管道直接连接。并应留出不小于（ ）的隔断空间。",[200,201,202,203],{"key":19,"text":121,"correct":21},{"key":23,"text":62,"correct":25},{"key":27,"text":66,"correct":25},{"key":30,"text":68,"correct":25},{"id":205,"libraryId":5,"type":9,"typeLabel":15,"stem":206,"options":207,"answer":23,"analysis":32},1260687,"在通气管出口4m以内有门、窗时，通气管应高出门、窗顶（ ）mm或引向无门、窗一侧。",[208,210,212,214],{"key":19,"text":209,"correct":25},"500",{"key":23,"text":211,"correct":21},"600",{"key":27,"text":213,"correct":25},"700",{"key":30,"text":215,"correct":25},"800",{"id":217,"libraryId":5,"type":9,"typeLabel":15,"stem":218,"options":219,"answer":23,"analysis":32},1260688,"技术交底应根据（ ）不同采取相应的方法。",[220,222,224,226],{"key":19,"text":221,"correct":25},"工程规模和环境条件",{"key":23,"text":223,"correct":21},"工程规模和技术复杂程度",{"key":27,"text":225,"correct":25},"地质条件和技术复杂程度",{"key":30,"text":227,"correct":25},"工程规模和结构复杂程度",{"id":229,"libraryId":5,"type":9,"typeLabel":15,"stem":230,"options":231,"answer":23,"analysis":32},1260690,"金属线槽不得熔焊跨接接地线，应采用铜芯软导线压接，导线截面节不小于（ ）平方毫米。",[232,233,234,235],{"key":19,"text":177,"correct":25},{"key":23,"text":179,"correct":21},{"key":27,"text":181,"correct":25},{"key":30,"text":183,"correct":25},{"id":237,"libraryId":5,"type":9,"typeLabel":15,"stem":238,"options":239,"answer":23,"analysis":32},1260691,"管道支架安装方法：（ ）适用于角形横梁在墙上的安装。",[240,242,244,246],{"key":19,"text":241,"correct":25},"裁埋法",{"key":23,"text":243,"correct":21},"膨胀螺栓法",{"key":27,"text":245,"correct":25},"射钉法",{"key":30,"text":247,"correct":25},"抱柱法",{"id":249,"libraryId":5,"type":9,"typeLabel":15,"stem":250,"options":251,"answer":23,"analysis":32},1260692,"板材隔墙工程的检查数量应符合下列规定：每个检验批应至少抽查（ ），并不得少于3间。",[252,253,254,255],{"key":19,"text":145,"correct":25},{"key":23,"text":24,"correct":21},{"key":27,"text":143,"correct":25},{"key":30,"text":147,"correct":25},{"id":257,"libraryId":5,"type":9,"typeLabel":15,"stem":258,"options":259,"answer":23,"analysis":32},1260693,".铺实木地板施工，从墙的一边开始铺钉企口实木地板，靠墙的一块离开墙面（ ）mm左右，以后逐块排紧。",[260,262,264,266],{"key":19,"text":261,"correct":25},"20",{"key":23,"text":263,"correct":21},"10",{"key":27,"text":265,"correct":25},"15",{"key":30,"text":267,"correct":25},"25",{"id":269,"libraryId":5,"type":9,"typeLabel":15,"stem":270,"options":271,"answer":23,"analysis":32},1260694,"下列关于装饰装修工程施工准备工作内容，说法错误的是（ ）。",[272,274,276,278],{"key":19,"text":273,"correct":25},"技术准备",{"key":23,"text":275,"correct":21},"大型机械进退场准备",{"key":27,"text":277,"correct":25},"现场准备",{"key":30,"text":279,"correct":25},"资金准备",{"id":281,"libraryId":5,"type":9,"typeLabel":15,"stem":282,"options":283,"answer":23,"analysis":32},1260695,"一般敞开式灯具，厂房灯头对地面距离不小于下列数值（采用安全电压时除外）（ ）。",[284,285,286,287],{"key":19,"text":109,"correct":25},{"key":23,"text":111,"correct":21},{"key":27,"text":113,"correct":25},{"key":30,"text":115,"correct":25},{"id":289,"libraryId":5,"type":9,"typeLabel":15,"stem":290,"options":291,"answer":23,"analysis":32},1260696,"骨架隔墙工程的检查数量应符合下列规定：每个检验批应至少抽查（ ）并不得少于3间；不足3间时应全数检查。",[292,293,294,295],{"key":19,"text":145,"correct":25},{"key":23,"text":24,"correct":21},{"key":27,"text":143,"correct":25},{"key":30,"text":147,"correct":25},{"id":297,"libraryId":5,"type":9,"typeLabel":15,"stem":298,"options":299,"answer":23,"analysis":32},1260697,"吊杆距主龙骨端部的距离不得大于（ ）mm",[300,301,302,304],{"key":19,"text":68,"correct":25},{"key":23,"text":66,"correct":21},{"key":27,"text":303,"correct":25},"450",{"key":30,"text":211,"correct":25},{"id":306,"libraryId":5,"type":9,"typeLabel":15,"stem":307,"options":308,"answer":23,"analysis":32},1260698,"支、吊架安装时，固定点间距不应大于2m，距离楼顶板不应小于（ ）mm。",[309,310,311,312],{"key":19,"text":121,"correct":25},{"key":23,"text":62,"correct":21},{"key":27,"text":66,"correct":25},{"key":30,"text":68,"correct":25},{"id":314,"libraryId":5,"type":9,"typeLabel":15,"stem":315,"options":316,"answer":23,"analysis":32},1260699,"整体地面中混凝土面层的强度不低于（ ）。",[317,319,321,323],{"key":19,"text":318,"correct":25},"C25",{"key":23,"text":320,"correct":21},"C20",{"key":27,"text":322,"correct":25},"C30",{"key":30,"text":324,"correct":25},"C15",{"id":326,"libraryId":5,"type":9,"typeLabel":15,"stem":327,"options":328,"answer":23,"analysis":32},1260700,"装饰装修工程的施工条件有（ ）。",[329,331,333,335],{"key":19,"text":330,"correct":25},"人文条件和施工现场条件",{"key":23,"text":332,"correct":21},"自然条件和施工现场条件",{"key":27,"text":334,"correct":25},"自然条件和人工条件",{"key":30,"text":336,"correct":25},"地质条件和施工现场条件",{"id":338,"libraryId":5,"type":9,"typeLabel":15,"stem":339,"options":340,"answer":23,"analysis":32},1260701,"当污水管在楼板下悬吊敷设时，可将清扫口设在上一层楼地面上，污水管起点清扫口与管道相垂直的墙面距离不得小于（ ）mm。",[341,342,343,344],{"key":19,"text":121,"correct":25},{"key":23,"text":62,"correct":21},{"key":27,"text":66,"correct":25},{"key":30,"text":68,"correct":25},{"id":346,"libraryId":5,"type":9,"typeLabel":15,"stem":347,"options":348,"answer":23,"analysis":32},1260702,"混凝土、水泥砂浆整体楼地面面层施工中，待混凝土垫层强度达到（ ）MPa后，方可进行面层施工。",[349,350,352,353],{"key":19,"text":52,"correct":25},{"key":23,"text":351,"correct":21},"1.2",{"key":27,"text":54,"correct":25},{"key":30,"text":56,"correct":25},{"id":355,"libraryId":5,"type":9,"typeLabel":15,"stem":356,"options":357,"answer":23,"analysis":32},1260703,"板块地面施工中，当铺砖面层的砂浆强度达到（ ）Mpa时进行勾缝。",[358,359,360,361],{"key":19,"text":52,"correct":25},{"key":23,"text":351,"correct":21},{"key":27,"text":54,"correct":25},{"key":30,"text":56,"correct":25},{"id":363,"libraryId":5,"type":9,"typeLabel":15,"stem":364,"options":365,"answer":23,"analysis":32},1260704,"石材饰面板湿法安装施工工艺：（ ）。",[366,368,370,372],{"key":19,"text":367,"correct":25},"试排试拼块材→石材钻孔、剔卧铜丝→穿铜丝→石材表面处理→绑焊钢筋网→安装石材板块→分层灌浆→擦缝、清理打蜡",{"key":23,"text":369,"correct":21},"弹线→试排试拼块材→石材钻孔、剔卧铜丝→穿铜丝→石材表面处理→绑焊钢筋网→安装石材板块→分层灌浆→擦缝、清理打蜡",{"key":27,"text":371,"correct":25},"石材钻孔、剔卧铜丝→穿铜丝→石材表面处理→绑焊钢筋网→安装石材板块→分层灌浆→擦缝、清理打蜡",{"key":30,"text":373,"correct":25},"石材钻孔、剔卧铜丝→穿铜丝→石材表面处理→绑焊钢筋网→分层灌浆→擦缝、清理打蜡",{"id":375,"libraryId":5,"type":9,"typeLabel":15,"stem":376,"options":377,"answer":23,"analysis":32},1260705,"同类照明的多支分支回路，但管内的导线总数不应超过（ ）根。",[378,379,380,382],{"key":19,"text":181,"correct":25},{"key":23,"text":183,"correct":21},{"key":27,"text":381,"correct":25},"9",{"key":30,"text":263,"correct":25},{"id":384,"libraryId":5,"type":9,"typeLabel":15,"stem":385,"options":386,"answer":23,"analysis":32},1260706,"混凝土面层的强度不低于（ ），混凝土垫层强度不低于C15。",[387,388,389,390],{"key":19,"text":324,"correct":25},{"key":23,"text":320,"correct":21},{"key":27,"text":318,"correct":25},{"key":30,"text":322,"correct":25},{"id":392,"libraryId":5,"type":9,"typeLabel":15,"stem":393,"options":394,"answer":23,"analysis":32},1260707,"关于分部（分项）工程作业计划，以下表述不正确的是（ ）。",[395,397,399,401],{"key":19,"text":396,"correct":25},"以某些主要的或新结构的分部（分项）工程为对象编制的",{"key":23,"text":398,"correct":21},"是以单位工程为对象编制的",{"key":27,"text":400,"correct":25},"以某些技术复杂的分部（分项）工程为对象编制的",{"key":30,"text":402,"correct":25},"以某些缺乏施工经验的分部（分项）工程为对象编制的",{"id":404,"libraryId":5,"type":9,"typeLabel":15,"stem":405,"options":406,"answer":23,"analysis":32},1260708,"水表进水口中心标高按设计要求，允许偏差为正负（ ）mm。",[407,408,409,410],{"key":19,"text":177,"correct":25},{"key":23,"text":263,"correct":21},{"key":27,"text":265,"correct":25},{"key":30,"text":261,"correct":25},{"id":412,"libraryId":5,"type":9,"typeLabel":15,"stem":413,"options":414,"answer":23,"analysis":32},1260709,"抹灰工程中，基层如有油渍或粉状隔离剂，应用（ ）火碱水刷洗，清水冲净，或用钢丝刷子彻底刷干净。",[415,416,417,418],{"key":19,"text":145,"correct":25},{"key":23,"text":24,"correct":21},{"key":27,"text":143,"correct":25},{"key":30,"text":419,"correct":25},"25%",{"id":421,"libraryId":5,"type":9,"typeLabel":15,"stem":422,"options":423,"answer":23,"analysis":32},1260710,"单位工程施工组织设计编制完成后，必须与（ ）进行比较和对照，再报送、审批。",[424,426,428,430],{"key":19,"text":425,"correct":25},"各专业施工组织设计",{"key":23,"text":427,"correct":21},"施工组织总设计",{"key":27,"text":429,"correct":25},"分部（分项）工程施工组织设计",{"key":30,"text":431,"correct":25},"施工合同内容",{"id":433,"libraryId":5,"type":9,"typeLabel":15,"stem":434,"options":435,"answer":23,"analysis":32},1260711,"室内给水下排水管道平行敷设时，两管之间的最小净距不得小于（ ）m。",[436,438,440,442],{"key":19,"text":437,"correct":25},"0.4",{"key":23,"text":439,"correct":21},"0.5",{"key":27,"text":441,"correct":25},"0.8",{"key":30,"text":50,"correct":25},{"id":444,"libraryId":5,"type":9,"typeLabel":15,"stem":445,"options":446,"answer":23,"analysis":32},1260712,"墙体贴面砖工程的施工验收中，检验批划分，相同材料、工艺和施工条件的室内饰面板（砖）工程每（ ）间应划分为一个检验批。",[447,448,450,452],{"key":19,"text":121,"correct":25},{"key":23,"text":449,"correct":21},"50",{"key":27,"text":451,"correct":25},"120",{"key":30,"text":453,"correct":25},"150",{"id":455,"libraryId":5,"type":9,"typeLabel":15,"stem":456,"options":457,"answer":23,"analysis":32},1260713,"地下埋设管道应先用细砂回填至管上皮（ ）mm，上覆过筛土，夯实时勿碰损管道。",[458,459,460,461],{"key":19,"text":449,"correct":25},{"key":23,"text":121,"correct":21},{"key":27,"text":453,"correct":25},{"key":30,"text":62,"correct":25},{"id":463,"libraryId":5,"type":9,"typeLabel":15,"stem":464,"options":465,"answer":23,"analysis":32},1260714,"下列哪项符合吊顶工程施工工艺的要求（ ）。",[466,468,470,472],{"key":19,"text":467,"correct":25},"必须先固定吊筋，再安装次龙骨",{"key":23,"text":469,"correct":21},"必须先固定吊筋，再安装主次龙骨",{"key":27,"text":471,"correct":25},"必须先安装主龙骨，再固定吊筋",{"key":30,"text":473,"correct":25},"必须先安装次龙骨，再安装主龙骨",{"id":475,"libraryId":5,"type":9,"typeLabel":15,"stem":476,"options":477,"answer":23,"analysis":32},1260715,"外墙贴面砖工程的施工中，石灰膏一般熟化时间不应小于（ ）。",[478,480,482,484],{"key":19,"text":479,"correct":25},"20d",{"key":23,"text":481,"correct":21},"15d",{"key":27,"text":483,"correct":25},"10d",{"key":30,"text":485,"correct":25},"30d",{"id":487,"libraryId":5,"type":9,"typeLabel":15,"stem":488,"options":489,"answer":23,"analysis":32},1260716,"中小型工程，一般由（ ）向有关职能人员或施工队交底。",[490,491,492,493],{"key":19,"text":74,"correct":25},{"key":23,"text":76,"correct":21},{"key":27,"text":78,"correct":25},{"key":30,"text":80,"correct":25},{"id":495,"libraryId":5,"type":9,"typeLabel":15,"stem":496,"options":497,"answer":23,"analysis":32},1260717,"施工组织设计的核心是（ ）。",[498,500,502,504],{"key":19,"text":499,"correct":25},"进度计划",{"key":23,"text":501,"correct":21},"施工方案",{"key":27,"text":503,"correct":25},"现场平面设计",{"key":30,"text":505,"correct":25},"现场用电",{"id":507,"libraryId":5,"type":9,"typeLabel":15,"stem":508,"options":509,"answer":23,"analysis":32},1260718,"室内给水下排水管道交叉铺设时，垂直净距不得小于（ ）m。",[510,512,514,516],{"key":19,"text":511,"correct":25},"0.1",{"key":23,"text":513,"correct":21},"0.15",{"key":27,"text":515,"correct":25},"0.18",{"key":30,"text":517,"correct":25},"0.2",{"id":519,"libraryId":5,"type":9,"typeLabel":15,"stem":520,"options":521,"answer":23,"analysis":32},1260719,"人造木板应对那种性能指标进行复验（ ）。",[522,524,526,528],{"key":19,"text":523,"correct":25},"耐热性",{"key":23,"text":525,"correct":21},"甲醛含量",{"key":27,"text":527,"correct":25},"抗冻性",{"key":30,"text":529,"correct":25},"强度",{"id":531,"libraryId":5,"type":9,"typeLabel":15,"stem":532,"options":533,"answer":23,"analysis":32},1260720,"裱糊工程基体或基层的含水率：混凝土和抹灰不得大于（ ）；木材制品不得大于（ ）。",[534,536,538,540],{"key":19,"text":535,"correct":25},"10%，12%",{"key":23,"text":537,"correct":21},"8%，12%",{"key":27,"text":539,"correct":25},"8%，14%",{"key":30,"text":541,"correct":25},"12%，12%",{"id":543,"libraryId":5,"type":9,"typeLabel":15,"stem":544,"options":545,"answer":27,"analysis":32},1260721,"石膏板、钙塑板安装。当采用钉固法安装时，螺钉至板边距离不得小于（ ）mm。",[546,548,549,550],{"key":19,"text":547,"correct":25},"30",{"key":23,"text":263,"correct":25},{"key":27,"text":265,"correct":21},{"key":30,"text":449,"correct":25},[552,555,558,561,564,567],{"id":9,"name":553,"category":7,"favorite":554},"领导干部任职前廉政法规知识测试题",92,{"id":556,"name":557,"category":7,"favorite":9},595,"建筑结构与设备",{"id":559,"name":560,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":562,"name":563,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":565,"name":566,"category":7,"favorite":8},534,"BIM工程师",{"id":568,"name":566,"category":7,"favorite":8},535]