[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261869":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1261869,844,3,"判断题","有防水要求的建筑地面工程，铺设前必须对立管、套管和地漏与楼板节点之间进行密封处理，并应进行隐蔽验收。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]