[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261856":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1261856,844,3,"判断题","建筑施工企业在合同履行过程中，按照发包人的指令和通知进人施工现场后，遇到不具备施工条件及其他原因造成施工企业成本增加，发包人拒绝签证下，故而需进行工程索赔。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]