[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261783":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1261783,844,2,"多选题","下列属于施工单位递交竣工结算资料的有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工合同及补充协议",true,{"key":16,"text":17,"correct":14},"B","设计变更及签证资料",{"key":19,"text":20,"correct":14},"C","开工报告",{"key":22,"text":23,"correct":14},"D","工程验收合格证明",{"key":25,"text":26,"correct":27},"E","施工日志",false,"ABCD","施工日志也叫施工日记，是在建筑工程整个施工阶段的施工组织管理、施工技术等有关施工活动和现场情况变化的真实的综合性记录，也是处理施工问题的备忘录和总结施工管理经验的基本素材，是工程交竣工验收资料的重要组成部分。施工日志可按单位、分部工程或施工工区（班组）建立，由专人负责收集、填写记录、保管。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]