[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261586":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1261586,844,2,"多选题","（ ）等实行分包的，其专项方案可由专业承包单位组织编制。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","起重机械安装工程",true,{"key":16,"text":17,"correct":14},"B","起重机械拆卸工程",{"key":19,"text":20,"correct":21},"C","建设工程主体工程",false,{"key":23,"text":24,"correct":14},"D","附着式升降脚手架搭设",{"key":26,"text":27,"correct":14},"E","深基坑工程","ABDE","起重机械安装工程、起重机械拆卸工程、附着式升降脚手架搭设、深基坑工程等实行分包的，其专项方案可由专业承包单位组织编制。",{"id":6,"name":31,"category":32,"favorite":33},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]