[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261503":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1261503,844,1,"单选题","工程竣工后计日工项目费应按照（ ）进行结算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计日工项目表中的工程量所需费用",false,{"key":16,"text":17,"correct":18},"B","实际完成的工程量所需费用",true,{"key":20,"text":21,"correct":14},"C","计日工项目计价表中的费用",{"key":23,"text":24,"correct":14},"D","实际支出的费用","工程竣工后计日工项目费应按照实际完成的工程量所需费用进行结算。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]