[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261500":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1261500,844,3,"判断题","根据工程量清单计价规则，工人工作时为恢复体力稍作休息的时间为非定额时间。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"非定额时间是指一个工作班内因停工而损失的时间，或执行非生产性工作所消耗的时间，非定额时间包括多余的工作时间、停工损失时间和违反劳动纪律的损失时间",{"id":6,"name":21,"category":22,"favorite":23},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]