[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261483":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1261483,844,1,"单选题","根据工程量清单计价规则，其他项目清单应包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预留金",false,{"key":16,"text":17,"correct":18},"B","总承包服务费",true,{"key":20,"text":21,"correct":14},"C","材料购置费",{"key":23,"text":24,"correct":14},"D","零星工作项目费","根据《建设工程工程量清单计价规范》GB50500-2013规定，根据工程量清单计价规则，其他项目清单包括暂列金额、暂估价、包括材料暂估价、专业工程暂估价、计日工、总承包服务费。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]