[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261480":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1261480,844,1,"单选题","根据工程量清单计价规则，高层建筑增加费用应列人（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部分项工程费",false,{"key":16,"text":17,"correct":14},"B","措施项目费",{"key":19,"text":20,"correct":14},"C","单独列项",{"key":22,"text":23,"correct":24},"D","分部分项费和措施费中",true,"根据工程量清单计价规则，高层建筑增加费用应列人分部分项费和措施费中。",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]