[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1261432":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1261432,844,1,"单选题","下列确定流水步距时不需要考虑的因素是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","应保证相邻两个施工过程之间工艺上有合理的顺序",false,{"key":16,"text":17,"correct":14},"B","应使各个施工过程的专业工作队连续施工",{"key":19,"text":20,"correct":14},"C","应考虑各个施工过程之间的间歇时间",{"key":22,"text":23,"correct":24},"D","劳动力人数或施工机械台班数",true,"确定流水步距时需要考虑的因素是：各专业队进场后能连续施工、有足够的时间间歇、保证每个施工段上施工工序不乱",{"id":6,"name":27,"category":28,"favorite":29},"(装饰施工)专业管理实务 岗位知识","建筑工程",0]